Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Medical Simulation Suite Fit-Out

Active
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the University of Bedfordshire involves the interior fit-out of HCLS Paramedic and Nursing suites. The scope of work focuses on creating specialized clinical environments through the installation of partitioning, ceilings, and medical-grade antimicrobial vinyl flooring. To ensure the suites are suitable for simulation, the project requires the use of acoustic partitioning and antimicrobial surfaces. The project is categorized under NAICS code 236220 and is managed as a subcontract for prime contractors. Key dates include a posting date of October 26, 2026, with a response deadline set for November 20, 2026. The ultimate goal of the contract is the delivery of fully fitted-out clinical simulation suites.

General Info

Interior fit-out of clinical simulation suites for University of Bedfordshire by November 2026.

Place of Performance

Not specified

Set-Aside

NONE

Documents

This scope was carved out of UoB/P FBS - 00000746.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Provision of HCLS Paramedic & Nursing Suite works

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUniversity of Bedfordshire
ContactsNo contacts available
OfficeN/A
Organization / AgencyUniversity of Bedfordshire
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs interior fit-out for prime contractors on University of Bedfordshire HCLS Paramedic and Nursing suite projects. Installs partitioning, ceilings, and medical-grade antimicrobial vinyl flooring to create a clinical environment. Utilizes antimicrobial surfaces and acoustic partitioning for simulation rooms. Delivers fully fitted-out clinical simulation suites.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 26, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. To secure project financing, bidders must strictly adhere to Disadvantaged Business Enterprise requirements that expand upon State Water Resources Control Board standards. Central to this is the demonstration of six Good Faith Efforts (GFE). Specifically, proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of utilizing the Small Business Administration and Minority Business Development Agency, must be submitted with the bid package. Failure to provide these specific GFEs by the opening date will result in the bid being deemed non-responsive. Documentation regarding DBE outreach may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 8 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of the existing Building 1272T engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. All work must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract for multi-floor water damage restoration at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge and requires the restoration of the first, second, and third floors to their original condition. The scope of work includes drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and electrical repairs along with vanity and cabinet replacement. The total period of performance is 105 days, with substantial completion expected within 90 days and final completion within an additional 15 days. This is an SBA set-aside solicitation open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. Award will be based on best value, evaluated across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required documentation includes a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a valid Massachusetts Contractor's License, and wage rate certifications. The contract is subject to the Davis-Bacon Act, requiring a minimum wage of 13.65 per hour and specific paid sick leave accruals. Contractors must comply with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, with Massachusetts state laws prevailing if more stringent. Insurance requirements include automobile liability coverage of 200,000 per person and 500,000 per occurrence, naming Adams and Associates, Inc. as an additional insured. Workmanship is guaranteed for one year, with a two-year manufacturer warranty required for any roofing work. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 21 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at Naval Submarine Base New London in Groton, Connecticut, is a comprehensive construction effort managed by J & J Contractors, Inc. The project spans 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. Key structural elements include reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundations utilizing rigid inclusions and load transfer mats. Additionally, the scope includes the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The scope of work is extensive, covering demolition, abatement, structural steel, roofing, mechanical, electrical, and plumbing systems, as well as site work involving rock excavation and grading. Site improvements include the development of access roads, paved loading areas, and landscaping, with a specific requirement for wetland mitigation. Electrical infrastructure will consist of primary and secondary distribution systems, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB, with a response deadline of October 31, 2026.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms by replacing vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades involve installing raised flooring and electrical distribution to support classroom needs, implementing simple dimming lighting controls, replacing lamps, ballasts, and ceiling fans, and replacing variable air volume systems to correct HVAC and plumbing deficiencies. The project also encompasses associated work for Buildings 261 and 263, with specific performance periods of 240 days for the base requirement and option. The overall period of performance is from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price, past performance from the last five years, and corporate relevant experience. Contractors must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict security, safety, and accessibility standards, including ADA and seismic-resisting system requirements. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 14 days
View Details

More opportunities from University of Bedfordshire

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS