Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on April 23, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Metal Roofing - Remove and Replace

Awarded
AG-7442-S-10-0039Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 5 hours ago

DEADLINE

in 4 days
NAICS: 238160
New
SLED
Request for Qualifications for Trade Contractors for 158 Spring Street - ROOFING AND FLASHING ONLY
Solicitation # COC-RFQ-FY27-31162RF
The City of Cambridge is seeking prequalified Trade Contractors for roofing and flashing services as part of a comprehensive renovation of the former Kennedy-Longfellow School, a 101,590 square foot structure located at 158 Spring Street. This procurement is conducted under M.G.L. c.149A Construction Management at Risk, with the specific roofing and flashing trade estimated at 55,571.00 dollars. The overall project duration is approximately 12 months from the notice to proceed. The selection process consists of two phases, beginning with a prequalification phase where firms must submit a Statement of Qualifications (SOQ) via the City's e-Procurement Portal by November 12, 2026. To be eligible for the subsequent bidding phase, firms must achieve a minimum total score of 70 points, with specific minimums required in references and project capacity categories. Mandatory requirements include a valid DCAMM Sub-bidder Certificate of Eligibility, a commitment letter for payment and performance bonds at 110 percent of the estimated contract value, and a 10-hour OSHA-approved safety certification. Applicants must submit a comprehensive package including Trade RFQ Form 1 prior to the SOQ application, along with various schedules detailing business ownership, management personnel, five years of similar project experience, and a three-year workers compensation modifier history. Additional compliance mandates include adherence to the Cambridge Employment Plan, the Responsible Employer Plan, the Living Wage Ordinance, and Minority Business Enterprise programs. All submissions must be electronically filed, and any packages received after the deadline will be rejected.
Capital Buildings Projects

POSTED

about 20 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

This contract, solicitation number AG-7442-S-10-0039, involves the removal and replacement of a 50 by 60 metal roof at the E. Kika De La Garza Plant Materials Center in Kingsville, Texas. The selected contractor is responsible for providing all labor, equipment, and materials to install new 26 gage minimum aluminum coated steel roof panels, gutters, and roof rakes. The scope of work includes the removal and reinstallation of two 10 inch ridge vents with bird screens and dampers, ensuring that the dampers maintain floor operated control and the entire structure is completely weathertight. Technical specifications require the roof to be designed for a 30 psf uniformly distributed load or a 120 lb concentrated point load, with a wind load of 20 psf velocity pressure. All installations must adhere to the Metal Building Manufacturers Association standards. Additionally, the building manufacturer must provide a 20 year guarantee against rupture, structural failure, or perforation. This opportunity is designated as a Service-Disabled Veteran-Owned Small Business Set Aside.

General Info

Agency

N/A

Contract Value

$14,915

NAICS

238160 - Roofing Contractors

Place of Performance

Kika de la Garza Plant Materials Center 3409 N FM 1355, KINGSVILLE, TX, 78363-2704, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline time changed from 8:00 PM UTC to 7:00 PM UTC on May 14, 2010. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A

Full Description

Show more
ROOF REPLACEMENT AT THE E. - KIKA DE LA GARZA PLANT MATERIALS CENTER KINGSVILLE, TEXAS STATEMENT OF WORK: 1. The work covered by this proposal consists of the removal of the existing 50 by 60 metal roof, roof vents and exhaust blowers. Contractor will furnish all labor, equipment, and material to install new 26 gage (minimum) aluminum coated steel roof panels, along with the existing two roof ridge vents, gutters and roof rakes 2. Covering width and configuration of roof panels shall be the building manufacturer's standard with all laps sealed to assure complete weather tightness. The panel is to be one piece from eave to ridge. 3. Roof panels shall be fastened to the purlins with weather-sealed type fasteners. Cadmium plated or equivalent colored fasteners are to be used and shall be adequately spaced to handle the roof load requirements. At eaves and ridge, panels must be fastened and caulked and/or flashed with necessary fascia and ridge cover to be completely weathertight. 4. The existing two (2) 10 ridge vents with bird screens and dampers will be removed and then reinstalled by the contractor. The ridge vent dampers will be reinstalled to assure floor operated control. 5. Roof covering shall be designed for either 30 psf uniformly distributed or a 120-lb. concentrated point load located at center of maximum roofing panel span. 6. The wind load on the structure shall be 20 psf velocity pressure proportioned and applied as horizontal and uplift forces. 7. The combination of normal loads and auxiliary loads for design purposes shall be as prescribed and recommended by the Metal Building Manufacturers Association (MBMA) Metal Building Systems Manual. 8. Durability of the roof panels due to rupture, structural failure or perforation shall be guaranteed for a period of 20 years by the building manufacturer. A specimen copy of the document must accompany the offer, clearly stating the conditions under which the guarantee is valid. PLEASE REVIEW the additional information furnished on hte attached questions and answers. No change in response date.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS