Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Metal Tube Assembly Manufacturer (NSN 4710-01-204-5313)

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the manufacture and supply of eight metal tube assemblies for Rockwell Electronic Test Sets under the Department of Defense Fluid Handling Division. The contractor is responsible for fabricating the units according to DLA Master List technical requirements, ensuring all items are marked per MIL-STD-129 and packaged in accordance with ASTM D3951. The agreement requires the provider to maintain a CMMC Level 2 self-assessment and strictly adhere to the Buy American and Balance of Payments Program. Performance will take place in Cherry Point, and the final deliverable consists of eight completed, marked, and packaged assemblies.

General Info

Contract for manufacturing eight metal tube assemblies for DoD Rockwell Electronic Test Sets.

NAICS

332721 - Precision Turned Product Manufacturing

Place of Performance

CHERRY POINT, NC, 28533-5040, USA

Set-Aside

NONE

Documents

This scope was carved out of SPE7M4-26-T-438U.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

TUBE ASSEMBLY, METAL

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FLUID HANDLING DIVISION
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Manufactures and supplies metal tube assemblies for prime contractors on DLA supply contracts for Rockwell Electronic Test Sets. Fabricates 8 units per DLA Master List technical requirements. Packages per ASTM D3951 and marks units per MIL-STD-129. Requires CMMC Level 2 self-assessment and compliance with Buy American and Balance of Payments Program. Delivers 8 completed, marked, and packaged metal tube assemblies.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → FLUID HANDLING DIVISION

Same awarding agency

NAICS: 332999
New
DIBBS
HOSE, NONMETALLIC
Solicitation # SPE7M4-27-Q-0002
This firm fixed price solicitation issued by the DLA Land and Maritime Fluid Handling Division is for the procurement of nonmetallic rubber hoses, specifically designed for petroleum-based fuels and water services. The required hoses must have a 7 inch inner diameter and a length of 35 feet, adhering to the specification for smooth bore, lightweight buoyant type discharge hoses. The total quantity requested is 175,000 units, split between two line items of 87,000 and 88,000 units respectively. Delivery is set for 815 days after the order date, with shipping destinations including San Diego, California, and New Cumberland, Pennsylvania. The contract mandates strict quality and compliance standards, including a first article test requirement with a report due within 90 calendar days of the contract date. Technical specifications are governed by MIL-DTL-22240G, and packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129. Specifically, shelf-life markings including cured and expiration dates are required on all packaging levels for this Type I item, which has a non-extendable shelf life of 120 months. Additionally, the use of Class I ozone depleting chemicals and the intentional addition of mercury are prohibited. Inspection and acceptance are generally at the origin, though first article testing involves source inspection and destination acceptance. Payment will be processed electronically through the Wide Area WorkFlow system.
All Other Miscellaneous Fabricated Metal Product Manufacturing

POSTED

about 6 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS