Mid Valley Basin Drainage/Storm Drain Improvements

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Palm Desert is implementing the Mid Valley Basin Drainage/Storm Drain Improvements project to mitigate flooding and public safety hazards at the intersection of Gerald Ford Drive and Cook Street. The project is divided into two phases, with Phase 1 focusing on the Mid Valley Basin and Phase 2 covering the installation of a new basin and underground storm drains. Key infrastructure work includes widening and regrading a 3,700-foot-long linear basin to a width of 50 feet and a depth of 9 to 9.5 feet, which involves removing and installing concrete weirs. Additionally, a new underground storm drain approximately 3,800 feet long and 36 to 48 inches wide will be installed within the Gerald Ford Drive right-of-way, featuring up to six inlets and requiring the excavation of roughly 1,800 cubic yards of material. A new basin will also be constructed on approximately four acres of property between the linear basin and Gerald Ford Drive. The project is governed by the California Environmental Quality Act, with a Mitigated Negative Declaration issued following an Initial Study that evaluated impacts on air quality, biological resources, and hydrology. Regulatory permits are required from the California Department of Fish and Wildlife and the State Water Resources Control Board. Phase 2 construction is estimated to occur between January 9, 2027, and March 2, 2027, encompassing clearing, grading, utility installation, and paving. All work must adhere to City grading standards and current fire protection designs to ensure adequate water supply and fire flow. The project is managed by the City of Palm Desert, with Lucero Leyva serving as the Senior Project Manager.

General Info

Palm Desert project improving storm drains and basins to mitigate flooding and hazards.

Agency

California → City of Palm Desert

Place of Performance

Cook Street and Gerald Ford Drive, Palm Desert, CA, 92211

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Palm Desert
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Palm Desert
Office AddressN/A
Contacts
Lucero LeyvaSenior Project Manager

Interested Companies (1)

Tom Dodson & AssociatesSan Bernardino, CA

Full Description

Show more
The City of Palm Desert is proposing to make improvements to the Mid Valley drainage system infrastructure, located southwest of the intersections of Cook Street with Gerald Ford Drive and Interstate 10. South of, and adjacent to Interstate 10, is the Mid Valley Basin where the City proposes to regrade and widen the Channel. A new Underground Storm Drain will be installed within the Gerald Ford Drive right-of-way. The final component is a proposed basin on approximately four acres of property located between the Channel and Gerald Ford. The proposed project has been divided into two phases. Phase 1 of the proposed project will be focused on the Mid Valley Basin, while the new basin and underground storm drain are set for implementation in Phase 2.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont in North Carolina involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station. Key infrastructure work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The scope further encompasses the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with gravity sewers, manholes, stormwater facilities, and site restoration. The project has an estimated value of 16,690,000 dollars and a substantial completion timeline of 560 calendar days. This solicitation, identified as SRP-W-134-0290, is a unit price contract awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a completed EJCDC C-410 Bid Form, a bid bond, and evidence of authority to sign, while also demonstrating good faith efforts toward MWBE goals. The contract requires performance and payment bonds and adherence to strict technical standards, including AWWA Specification C-600 for pipelines and NEMA standards for motors. Payment is processed via monthly applications for payment, with funds becoming due 30 days after presentation to the owner. The project is set aside for small businesses, including certified veteran-owned, women-owned, and HUBZone small businesses.
Don Moorhead Construction, Inc.

POSTED

15 minutes ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, associated supports, valves, and piping appurtenances. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, the rehabilitation of reactor mixers and aerators, and the rerouting of sump pump discharge lines. Electrical and instrumentation work includes the installation of new or improved instrumentation, the rehabilitation and replacement of motor control center components, and modifications to existing sluice gates alongside the installation of new slide gates. The project also involves excavation, trench work, and surveying of key points around the reactors. This is a union project, and all subcontractors must utilize union labor. Potential subcontractors must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid for reimbursement. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. This opportunity is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms.
Garney Pacific, Inc.

POSTED

15 minutes ago

DEADLINE

in 20 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes from various trades, including SWPPP, survey, aggregates, demolition, paving, precast concrete, masonry, metals, coatings, process equipment, fire suppression, piping, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

15 minutes ago

DEADLINE

in about 11 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS