Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on May 25, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MILCON Project P-480 Energy Resilience Phase 1 & 2 and MILCON Project P-481 Energy Resilience Phases 3 & 4, Various Locations at Mountain Warfare Training Center, Bridgeport, California

Closed
N62473-22-R-1205Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The project scope includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through Pole P18, the installation of all-dielectric self-supporting fiber optic cable along the entire length, and the placement of various steel and ductile iron poles. The engineer's estimate for the work is $1,900,000. Bids will be awarded based on the lowest and best bid, with a strong emphasis on the bidder's financial standing, performance experience, and ability to complete the work in the shortest time possible. Bidders must provide a bid bond of 10% of the total bid amount, and the successful contractor will be required to post a combined performance-payment bond for 100% of the contract value. Compliance with State of Ohio Prevailing Wage laws, the National Electric Safety Code, and the Americans with Disabilities Act is mandatory. Contract administration is managed through the Office of the Architect-Engineer, with payments processed monthly. Equipment payments are structured at 90% upon delivery F.O.B. to the City of Piqua and the remaining 10% upon satisfactory energizing and acceptance of the system. All deliveries must be coordinated 48 hours in advance, and shipments in enclosed trailers will be refused. Bids must be submitted in duplicate via Bid Express, email, or sealed hard copy by the specified deadline.
City of Piqua

POSTED

about 23 hours ago

DEADLINE

in 9 days
NAICS: 237130
New
Federal
USFK C4I Communication Tower and Facility Maintenance CY27
Solicitation # W91QVN26QXXXX
This firm-fixed price non-personnel services contract, solicitation number W91QVN26QXXXX, provides communication tower and facility maintenance for the 41st Signal Battalion C4I mission support in South Korea. The scope of work includes physical and visual inspections of metal surfaces for structural integrity, maintenance of bonding, grounding, and lightning protection systems, LED replacement for beacon and side marker lights, and interior and exterior repairs for C4I communication shelters. Performance is required across multiple sites, including Papyongsan, Yongsan TCF, Osan Bucket, Highpoint, and CP Walker AFN FM. The base period of performance is 12 months from the date of award, with funding provided by the Republic of Korea Ministry of National Defense (ROK MND). Award will be made on an all-or-none basis to the responsible offeror submitting the lowest price that is technically acceptable. Technical acceptability is evaluated on a pass/fail basis, requiring a complete technical package and compliance with the Performance Work Statement. All price proposals must be submitted in Korean Won. The contractor must provide key personnel, including an Information and Communication Engineer and a CQCSM/Safety Manager with specific education and experience requirements. Mandatory qualifications include an Information and Communication Construction License and an Electrical Construction License. The contractor is also required to adhere to strict security protocols, including AT/OPSEC compliance for foreign performance and the safeguarding of Controlled Unclassified Information.
0411 Aq Hq Contract Augmented

POSTED

1 day ago

DEADLINE

in 29 days
NAICS: 237130
New
SLED
Refurbishment Of Existing On Load Tap Changer At Adobe Creek Substation - AC21
Solicitation # RFQ199445
The City of Palo Alto Utilities Department is soliciting quotes under RFQ199445 for the refurbishment of an existing on-load tap changer (OLTC) at the Adobe Creek Electric Substation (AC-21). The project specifically requires the replacement of the TLH-21 LTC on an Allis Chalmers 15MVA transformer with a certified re-manufactured component. The scope of work includes draining and processing transformer oil, filling the LTC tank with 760 gallons of new oil, re-sealing the barrier board and pass-through studs, and replacing valves and gaskets on six radiators along with the 60KV SMD fuse holder. Comprehensive preliminary and post-work testing, including Power Factor, TTR, and DGA/oil quality testing, is mandatory. The City has standardized its requirements for the Allis Chalmers TLH-21 and will not accept alternate materials or equivalent products. Eligible bidders must hold a valid California Class A license and be registered with the DIR. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest Base Bid. As a public works project, it is subject to California prevailing wage laws and requires the contractor to provide performance and payment surety bonds totaling at least 100 percent of the contract value. Additionally, contractors must meet strict insurance requirements, including general liability and worker's compensation, and comply with the City's Environmental Purchasing Policy. Bids must be submitted electronically via the OpenGov portal by November 3, 2026.
Utilities

POSTED

1 day ago

DEADLINE

in 14 days

General Info

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Bridgeport, CA, 93517, USA

Set-Aside

NONE

Documents

2

P480_P481_Sources+Sought+Information+Form.pdf

PDF

P480_P481_SOURCES+SOUGHT+NOTICE.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Southwest
Contacts1 person available
OfficeSAN DIEGO, CA, 92132-0001, USA
Office AddressSAN DIEGO, CA, 92132-0001, USA
Contacts
Phyllis Orman

Full Description

Show more
The Marine Corps Mountain Warfare Training Center Bridgeport (MWTC) is a mountain warfare training center whose mission is to conduct Marine Air Ground Task Force exercises, develop warfighting doctrine, and support research, development, testing, and evaluation (RDT&E) of equipment for use in mountain warfare operations. Readiness is dependent on having a reliable and resilient energy infrastructure. Achieving energy readiness in Bridgeport is challenging for two primary reasons. First, the installation is the last customer on the Southern California Edison (SCE) utility feed. Second, the base is located in an unforgiving, remote, and arduous area of the Sierra Mountains in California. Every year, the base experiences power outages due to extreme snowfall, sub-zero temperatures, forest fires, heat waves, power quality issues, and other planned and unplanned utility grid events. The base regularly operates for minutes up to weeks, off a single generator with aged infrastructure and inadequate controls. This is a significant vulnerability. Bridgeport is addressing these issues with two (2) projects P-480 and P-481. The projects focus on enhancing the reliability and redundancy of the electrical distribution system and enhancing resiliency. The end state of this project is a reliable, resilient, efficient, and cybersecure microgrid that will provide the base the ability to operate critical installation services and mission essential functions off the grid for several weeks with N+1 redundancy. These projects are to be awarded together. The intent is to have a Design-Build contractor develop one design containing both projects and construct the projects with one timeline for maximum efficiency. Below are the two (2) projects. P-480 Project P-480 must provide a 750kW Battery Energy Storage System (BESS) with a minimum of 500kWh storage capacity and must provide required documentation and fees for the interconnection agreement with SCE. The project must replace the generator switchgear and generator controls in Building 2003. The project enhances resiliency at the 480/277V and 208/120V distribution levels. Eight (8) exterior switchboards must be replaced. To provide power to ten (10) switchboards, equipment including an exterior disconnect will be provided to allow transfer from utility power to a mobile generator. This project extends the Industrial Control Systems fiber network at MWTC. Fiber optic cable must be provided, in order to extend the AMI network to include Building 2003 and Building 4046. The AMI network server must be replaced and be relocated to Building 4046, and a new AMI program must be installed to current versions. This project will disconnect the existing copper DDC building controllers and re-establish communication to Building 1036 via existing dark fiber in the AMI fiber optic cabling throughout the base. For buildings which are not connected to the AMI fiber optic cabling, fiber optic cable must be provided to connect these buildings into the network. Buildings which require a fiber optic cable connection include Building 1035,Building 1999, Building 2000, and Building 2002. All DDC building controllers must be networked to Building 1036 and Building 4046. Building controllers and all associated objects must also be integrated to and defined on a new FRCS server to be provided in Building 4046. New operator workstation must be provided in Building 1036. Operator workstation shall be integrated and network to the new Facility Related Control System (FRCS) server to be provided in building 4046. Server shall be capable of supporting a site of at least 150 buildings. P-481 The project must Provide Battery Energy Storage System (BESS) to augment the BESS from P480. Provide an additional 3 MWh of energy. Expand grid-facing energy storage system, which will work in conjunction with distributed energy resources (DERs), to allow the continuous flow of clean power to the MWTC grid. The BESS must allow the MWTC to be entirely powered by renewable energy during most daylight hours, making MWTC a model of resilience in a cold weather environment. During a multi-day winter outage, the storage will balance load and generation between the PV and the new 550 kW generator. While grid connected, the storage will be used to manage peak demand and support the SCE grid by responding to frequency and voltage transients. Furthermore, stabilizing the grid locally might reduce the likelihood of an outage. The system will disconnect if an unstable grid is detected. If both the 1 MW and 550 kW generator are down, the PV and BESS components (described below) can power the installation, although load would be reduced significantly by the EMIS system to provide power throughout the night. The project must provide a 550 kW generator to increase resilience of base-wide backup system. This generator will augment the renewable energy system, meet the complete power needs of the installation, and provide N+1 redundancy to the existing 1 MW generator. This 550 kW generator will primarily run during times of extended island mode, and in support of the DERs, to maximize renewable production and extend available fuel supply. This level of redundancy is crucial to ensure continuity of operations during sub-zero temperature events and during fires when SCE has grid outages. The project must provide 2 MW of solar photovoltaics. The PV systems must connect to the microgrid. The PV must work in conjunction with the BESS to maximize the use of renewable power. In addition, the configuration will allow the base to continue producing, consuming, and charging the BESS with PV-generated electricity, even when MWTC is disconnected from the SCE grid. The project must supply additional electrical infrastructure to accommodate the additional distributed sources throughout the installation. This includes providing conductors, coordinating with SCE, installing disconnects and other requirements to successfully interconnect the additional sources to the grid. These upgrades are required for the installation of the additional PV assets described above to connect to the grid and offset utility costs or extend duration while islanded. The project must provide microgrid control functions and equipment required to perform these functions. Advanced controls on all DERs must be provided to expand the microgrid and increase system telemetry throughout buildings to increase efficiency and control loads during grid-tied and islanded operations. The controls will provide capabilities including, but not limited to, the following: (a) - Smart controls capable of taking input from the upstream sensors and automatically engaging the necessary DERs to detect, signal and automatically engage the necessary controls and equipment to ensure a continuous flow of - clean electric power to the installation, preventing outages and power fluctuations that can be damaging to electrical and electronic equipment, thereby reducing maintenance and repair costs. (b) providing grid-interactive economic opportunities to produce savings by taking advantage of varying utility rates throughout the day and year. (c) Implement programmed operation modes to optimize base operations based on conditions such as maximum duration, mission-support or normal day-to-day operations. (d) Communications capabilities to promptly and automatically notify personnel if the control system changes system operations, such as when responding to an incoming power fluctuation and engaging installation DERs. The project is to provide and Energy Management Information System (EMIS). The energy management information system (EMIS) must integrate the DDC, AMI, and, microgrid monitoring and control in a single historian, with access to a single software suite for visualization, analytics, and fault detection. This will allow operators to view data in a customized way and be alerted to maintenance needs, energy savings opportunities, and understand interactions between systems that would be otherwise unknown. The project must provide a building to house all of the associated microgrid, building, AMI and any other related utility controls, control/monitoring stations, databases/servers and support personnel. This building is to provide central monitoring/control area for all facility related control systems and equipment including servers, communication nodes and operator interfaces. This project includes engineering calculations and studies as required by FC1-300-09N. However, the coordination, load flow and arc flash studies must determine the best scheme and protection of the entire microgrid for both grid-tied and islanded operations during the design. These studies inform the required electrical upgrades, generate required arc-flash labels, and provide documentation for SCE. This project must provide training, simulation, and documentation. This includes a complete package of standard operating procedures (SOPs) and emergency operating procedures (EOPs) and in-depth training on the system capabilities, operations, functions, etc. Electronic operation, maintenance, and sustainment instruction (eOMSI) manuals for the EMIS and microgrid system, detailing the operation, commissioning, and maintenance of the system must be proviced. The contractor will also provide a simulated environment for the system for training operators, testing upgrades and performing what-if scenarios. The contractors will prepare maintenance schemes, providing maintenance cost, energy cost, manpower and expected equipment reliability data for all developed maintenance schemes. MWTC facilities leadership will determine which scheme to implement, but all developed schemes will be detailed and delivered to MWTC facilities leadership. The manuals will detail system modes from fully automatic to manual, describe how to perform outage drills, and provide detailed information on efficiency when operating in a prescribed mode. A complete mirrored system, "sandbox" environment will be provided to assist with training and to ensure that system changes (such as patching) will not affect system operation. These documents will help ensure the installation maintains the best possible technologically-advanced maintenance plan at the lowest possible cost while maintaining equipment and system reliability and energy conservation. Cybersecurity is critical to implementing this project. Certification and Accreditation is required for all FRCSs included in this project. The control systems (including systems separate from an energy management control system) will be designed, acquired and executed in accordance with DoDI 8500.01, DoDI 8510.01, Department of Defense Risk Management Framework (RMF) per UFC 4-010-06, Cybersecurity of Facility-Related Control systems, and UFC 1-200-01, General Building Requirements Section 3-6.5, and other relevant FRCS cybersecurity requirements. All equipment installed (hardware and software) will be open protocol, have the ability to connect to existing and future systems, and will include the proper firewalls. Upon project completion, the MWTC will have an authority to operate (ATO), and a functional and cybersecure FRCSs.

More opportunities from Department Of Defense → Navfacsyscom Southwest

Same awarding agency

NAICS: 238210
New
Federal
IDIQ JOC TOTAL SMALL-BUSINESS SET-ASIDE FOR ELECTRICAL AND OTHER WIRING INSTALLATION PROJECTS AT VARIOUS GOVERNMENT FACILITIES LOCATED WITHIN THE MARINE CORPS LOGISTICS BASE BARSTOW, MARINE CO
Solicitation # N6247324R2610
Solicitation N6247324R2610 is a Total Small-Business Set-Aside Indefinite Delivery Indefinite Quantity Job Order Contract (IDIQ JOC) issued by NAVFAC Southwest. The contract is for electrical and other wiring installation projects, including repair, renovation, and minor new construction, at various government facilities in California, specifically Marine Corps Logistics Base Barstow, Marine Corps Air-Ground Combat Center 29 Palms, Marine Corps Mountain Warfare Training Center Bridgeport, and Naval Air Weapons Station China Lake. The contract has a maximum value of 35 million dollars, with individual task orders ranging from 2,000 dollars to 1 million dollars. The performance period consists of a two-year base period and two three-year option periods, for a maximum total duration of eight years. The basis of award is Lowest Priced Technically Acceptable (LPTA). Proposals are evaluated on five factors: Ability to Manage Multiple Simultaneous Projects, Experience, Past Performance, Safety, and Price. All non-price factors are rated as acceptable or unacceptable, with Factor 1 serving as a threshold requirement for eligibility. Pricing is based on established coefficients and pre-determined unit prices using R.S. Means Cost Data. Offerors must submit their proposals electronically via the PIEE Solicitation Module by October 28, 2026. Key requirements include a 5,000 dollar bid bond, CMMC Level 2 (Self) status, and compliance with Davis-Bacon wage determinations and various DFARS clauses regarding Russian fossil fuel business operations and restrictions on certain magnets, tantalum, and tungsten.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

5 days ago

DEADLINE

in 8 days
View Details
NAICS: 238220
New
Federal
IDIQ, JOC FOR PLUMBING, HEATING, AIR CONDITIONING PROJECTS AT MARINE CORPS LOGISTICS BASE BARSTOW, MARINE CORPS AIR-GROUND COMBAT CENTER 29 PALMS, MARINE CORPS MOUNTAIN WARFARE TRAINING CENTER BRIDGEPORT, AND NAVAL AIR WEAPONS STATION CHINA LAKE, CA AOR
Solicitation # N6247324R2611
This is a Total Small Business Set-Aside Indefinite Delivery Indefinite Quantity (IDIQ) Job Order Contract (JOC) issued by NAVFAC Southwest for plumbing, heating, and air conditioning projects. The contract covers various government facilities within the California Area of Responsibility, specifically Marine Corps Logistics Base Barstow, Marine Corps Air-Ground Combat Center 29 Palms, Marine Corps Mountain Warfare Training Center Bridgeport, and Naval Air Weapons Station China Lake. The contract has a maximum ceiling value of 49 million dollars with a minimum government obligation of 5,000 dollars. The performance period consists of a two-year base period from December 1, 2024, through November 30, 2026, with two subsequent three-year option periods extending the potential performance through November 30, 2032. The procurement utilizes a Lowest Priced, Technically Acceptable (LPTA) award process. Non-price evaluation factors, including the bidder's ability and experience, technical approach, and safety records, are rated as either acceptable or unacceptable. Pricing is based on a coefficient model where offerors provide multipliers applied to R.S. Means Cost Data. Task orders are issued as Firm Fixed Price contracts with individual order limits ranging from a minimum of 2,000 dollars to a maximum of 2 million dollars. Key compliance requirements include adherence to the Davis-Bacon Act for prevailing wages in San Bernardino, Kern, Mono, and Inyo counties, and Cybersecurity Maturity Model Certification (CMMC) verification. Recent amendments have incorporated prohibitions regarding Russian fossil fuel business operations and restrictions on certain foreign-sourced magnets, tantalum, and tungsten. Contractors must also comply with strict safety standards, including OSHA and EM 385-1-1, and utilize the Wide Area WorkFlow (WAWF) system for electronic invoicing and payment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in about 5 hours
View Details
NAICS: 236220
New
Federal
IDIQ JOC FOR GENERAL CONSTRUCTION PROJECTS AT GOVERNMENT INSTALLATIONS WITHIN NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND SOUTHWEST THE METROPOLITAN SAN DIEGO (NAVAL BASES SAN DIEGO, POINT LOMA, CORONADO AND MARINE CORPS AIR STATION (MCAS) MIRAMAR, CALIF
Solicitation # N6247325R0062
Navfacsyscom Southwest is conducting a market survey via a Sources Sought Synopsis to identify qualified small businesses for an Indefinite Delivery Indefinite Quantity Job Order Contract. The scope of work involves new general building construction, repair, and renovation projects at various government facilities in the Metropolitan San Diego area, including Naval Base San Diego, Naval Base Point Loma, Naval Base Coronado, and Marine Corps Air Station Miramar. The proposed contract features a two-year base period with a three-year option, for a maximum duration of five years. The estimated total contract value is 99 million dollars, with individual task orders expected to range between 2,000 and 2 million dollars. The government is specifically seeking sources that are Small Businesses, SBA certified 8(a), HUBZone, Women Owned, or Service-Disabled Veteran Owned. Under NAICS code 236220, the small business size standard is 45 million dollars. To be considered, interested firms must provide their UEI and CAGE code, bonding capacity, and evidence of a physical office within a 150-mile or three-hour radius of the installations. Capability is evaluated based on the submission of three to five recent prime contracts completed within the last five years, each valued at a minimum of 100,000 dollars, with at least 50 percent of the work self-performed. Additionally, firms must provide OSHA DART and TRC rates for 2023 through 2025, with detailed explanations required for DART rates above 3.0 or TRC rates above 4.5. Responses must be submitted via email to Rashonda T. Smith by October 28, 2026.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 8 days
View Details
NAICS: 562910
Federal
Request for Offer for RADMAC III Parcel E Remedial Action
Solicitation # N6247326RB009
Solicitation N62473-26-R-B-009 is a competitive request for offers under the RADMAC III Multiple Award Contract for the second phase of remedial action at Parcel E, Hunters Point Naval Shipyard in San Francisco, California. The project focuses on remediating non-aqueous phase liquid contamination at Installation Restoration Site 03, with a scope of work that includes shoreline excavation, confirmation sampling, in-situ stabilization, shoreline revetment, and the installation of a groundwater containment slurry wall and monitoring wells. The performance period is 60 months from the date of award, with work required to commence within 15 calendar days of the task order. The contract will be awarded based on best value using a trade-off process, evaluating three primary factors: Technical Approach, Local Hiring, and Price. The Technical Approach is weighted as twice as important as Local Hiring, and combined, these non-price factors are approximately equal in importance to the price. Offerors must possess valid radioactive materials licenses from the Nuclear Regulatory Commission and the State of California Department of Health Services. Additionally, the project requires 100 percent Payment and Performance Bonds for construction elements and adherence to both Service Contract Act and Davis-Bacon wage determinations. Proposals must be submitted electronically via the PIEE Solicitation Module, with a final submission deadline of November 3, 2026.
Remediation Services

POSTED

7 days ago

DEADLINE

in 14 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS