This Solicitation opportunity from Minnesota was posted on July 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mille Lacs Wildlife Management Area Mikkelson Pool, Townhall Pool and Section 3 Pool Water Control Structures

Closed
9207379State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract pertains to the replacement and removal of water control structures at the Mikkelson Pool, Townhall Pool, and Section 3 Pool within the Mille Lacs Wildlife Management Area, with a focus on projects that prioritize Targeted Group (TG), Economically Disadvantaged (ED), and Veteran-Owned businesses. The work will be executed under a single prime contract and involves a broad scope of construction activities, including demolition, disposal, dewatering, excavation, sediment and erosion control, installation of sheet piles, cast-in-place concrete, culverts, water control structures, metal fabrication, gravel surfacing, and turf establishment. An alternate scope specifically addresses the Section 3 Pool water control structure removal and replacement, mirroring the primary scope but designated as an alternate. Plans and specifications for the project have been prepared by the Minnesota Department of Natural Resources, with contact details provided for further inquiries. The project solicitation was posted in July 2024, with a response deadline set for late July 2024. The contract size is estimated to range between $500,000 and $1,500,000, and the project is managed by the Minnesota Department of Administration. The work site is located within Minnesota, and interested parties can access detailed project information through the provided online link.

General Info

Agency

Minnesota Department of Administration

Place of Performance

MN, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMinnesota Department of Administration
Contacts1 person available
OfficeN/A
Organization / Agency
Minnesota Department of Administration
Office AddressN/A

Full Description

Show more
State Project No. 2024-949-8W231, 8W244 & 8W245 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A. The work will be completed under one prime contract. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. SUMMARY OF WORK: The following summary is a general guide to the scope of work for the Mikkelson Pool and Townhall Pool water control structure removals and replacements. It should not be construed as a detailed list of work included in the contract. 1. Demolition and Disposal 2. Dewatering 3. Excavation and Embankment 4. Sediment and Erosion Control 5. Sheet Pile Sheet Pile 6. Cast-In-Place Concrete 7. Culvert and Water Control Structure Installation 8. Metal Fabrication 9. Gravel Surfacing 10. Turf Establishment Description of Alternates Alternate 1: The following summary is a general guide to the scope of work for Alternate 1, the Section 3 Pool water control structure removal and replacement. It should not be construed as a detailed list of work included in the contract. 1. Demolition and Disposal 2. Dewatering 3. Excavation and Embankment 4. Sediment and Erosion Control 5. Sheet Pile Sheet Pile 6. Cast-In-Place Concrete 7. Culvert and Water Control Structure Installation 8. Metal Fabrication 9. Gravel Surfacing 10. Turf Establishment Plans and Specifications were prepared by the Minnesota Department of Natural Resources, Contact: Shayne Johnson, email: shayne.johnson@state.mn.us, Telephone: (218) 203-4385

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS