Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Minor Alteration No. WA2026118 – WCWD Pipe Work Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Central Valley Flood Protection Board

NAICS

N/A

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Brian LukeSenior Environmental Scientist

Full Description

Show more
To finish abandonment of (1) noncompliant 60-inch drainpipe and to repair gate valve of (1) noncompliant 60-inch drainpipe both going through the federal levee. The first pipe needs to be completely slurry filled with flowable concrete per Title 23 § 124 (c). It was found to be partially filled before the project and currently requires complete abandonment per Title 23 §124. (c). Formwork will be built against the exposed end and concrete flowed in until the concrete is above the top of pipe indicating complete fill has been achieved. The second pipe was originally installed with a gate valve; however, the valve is no longer there and so the pipe is out of compliance with Title 23 § 123 (c)(5) requiring a waterside closure device. A new gate valve will be installed in the same location as the prior valve. Corrosion protection will also be applied to the pipe.

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS