Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Mission Community Wastewater Collection System Improvements

Active
102-17-SOL-24Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the Mission Community Wastewater Collection System Improvements located on the Umatilla Indian Reservation in Oregon. This project, designated as a 100% Total Small Business set-aside under NAICS Code 237110, aims to reduce groundwater inflow and infiltration into the wastewater system that ultimately flows to the City of Pendleton for treatment. The scope includes in situ grouting repairs of leaking sewer mains and lateral connections, point excavation repairs, rehabilitation of damaged asbestos cement pipes via cured-in-place pipe lining (CIPP), television inspections of sewer laterals contributing to inflow and infiltration, and optional repair, rehabilitation, or replacement of service laterals based on inspection findings and available funding. The contract is planned as a firm fixed price construction project with an estimated value between $250,000 and $500,000, a 60-day performance period post-notice to proceed, and requires a 20% bid bond alongside payment and performance bonds equaling 100% of the contract value. Notable updates include an extension of the proposal closing date to July 5th and pending issuance of Amendment No. 7, which clarifies certain repair quantities and requirements, such as the allowance for additional in situ grout repairs and confirmation regarding lateral service grouting in lined sections. The solicitation is not available yet, with a planned release around mid-May 2017, and includes a pre-proposal site visit scheduled for June 1, 2017. Offerors must be familiar with Indian Preference policies, including Tribal Employment Rights Ordinance fees or tribal taxes, as stipulated by relevant regulations. Interested parties are encouraged to monitor the posting for updates via the specified procurement platform and to prepare for compliance with the outlined bonding and contracting requirements.

General Info

Mission Community wastewater repairs on Umatilla Reservation, $250K-$500K, 60-day fixed price project.

Agency

N/A

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Umatilla Indian Reservation - East of Pendleton, Oregon, Mission, OR, 97801, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

12 updates
PhaseSolicitation
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline added: Jun 23, 2017.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jun 23, 2017 to Jun 30, 2017.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Jun 30, 2017 to Jul 5, 2017. The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
William StandleyContract Specialist
John W FannonContract Specialist

Full Description

Show more
Solicitation Cancelled. Important Note: Amendment No. 7 with some information AND EXTENSION OF CLOSING DATE TO JULY 5th at 1:00PM Seattle time is effective now. Amendment was going to be posted today but technical issues with FBO and our offices hard drive connection prevented posting Amendment 7 the normal way. This serves as a heads up for Amendment 7 hopefully posted by morning of June 30th. The text of Amendment 7 is copied below: Question No 1: Re the in-situ repairs, we identify 9 notations in the plans that call for in-situ grout repair or indicate joint leaks and hole repairs, rather than the 15 noted in Line Item #4. Answer: There are 10 notations in the plans where in-situ grouting repairs are indicated (see below). The intent is to provide an allowance and request for pricing for five additional repairs to account for deterioration since the previous 2013 CCTV inspection. # Sheet MHs 1 C-5 MH52-51 1 C-5 MH54-53 1 C-6 MH57-56 (This section to be lined) 1 C-8 CO-MH64 1 C-8 MH64-63 (This section to be lined) 3 C-9 MH68.2-68.1 (This section to be lined) 1 C-9 MH68-67 1 C-10 MHD2.1-D2 10 Total Question No. 2: Re the lateral reconnection grouting. The plans do not show laterals in the four lines being lined by CIPP. I ask for confirmation that the 20 laterals to be grouted following CIPP are in fact in the four lines being lined (shown on C-6, C-8, C-9 & C-10) Answer: That is correct, the 20 lateral service connection sealings called for in Item 8 pertain to the four sections being lined by CIPP. Please see Note 1 under Section B.2 Schedule of Item Notes regarding estimated quantities. Mission Community Wastewater Collection System Improvements. This is a 100 percent Total Small Business set-aside under North American Industry Classification System (NAICS) Code is 237110, Water and Sewer Line and Related Structures Construction, with a Small Business Size Standard of $36.5 million in average annual receipts for the past three years. This is NOT a Request for Proposal (RFP) and there is neither a solicitation nor construction documents available at this time. No responses are requested at this time. Award is subject to the availability of funds. This pre-solicitation notice is for an upcoming solicitation for improvements to the Mission Community Wastewater Collection System located on the Umatilla Indian Reservation. The system flows into and subsequently treated by the City of Pendleton. The primary goal of the project is to decrease the inflow and infiltration (I & I) of groundwater into the system.Under this construction project, the contractor shall repair, rehab and replace collection system defects contributing to the system I & I involving sewer mains and sewer service laterals to include: a. In situ grouting repairs of leaking sewer main joints, service lateral connections, and other defects. b. Excavation point repair of defects that cannot successfully be repaired by in situ methods. c. Rehabilitation of Asbestos Cement sewer pipe sections with structural defects by Cured in Place Pipe (CIPP) installation. d. Television inspection of sewer service laterals identified as contributing to I&I. e. Option Bid items for repair, rehabilitation, and replacement of sewer service laterals as determined necessary from the television inspection and as project funding allows. The period of performance will be 60 calendar days after Notice to Proceed. Per FAR 36.204, the estimated price range of the resultant construction project is between $250,000 and $500,000. Offerors shall be required to submit a 20 percent bid bond with their offer. Additionally, Payment and Performance Bonds will be required to be submitted by the awardee within 10 calendar days of award (in the amount of 100% of the contract value). Items that potential offerors need to be aware of are: 1. Notice of Indian Preference--see HHSAR 352.226-1 Indian Preference & HHSAR 352.226-2 Indian Preference Program 2. TERO fees or Tribal Taxes Indian Health Service intends to award a Firm Fixed Price (FFP) Construction Contract in support of this requirement. This solicitation will be procured as a RFP in accordance with FAR Part 15 and 36 procedures. This solicitation will be available for download on or about May 15, 2017, with proposals due at least 30 days after solicitation issuance. A formal site visit and pre-proposal meeting is planned for June 1, 2017 with specifics in Section L of the solicitation when posted. Interested offerors should follow this pre-sol notice on FBO by registering in FBO and clicking on "Watch This Opportunity" to recieve email notices of any updates to the notice including the posting of the solicitation.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project focuses on constructing improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional system. Key technical requirements include civil and site work such as grading, demolition, saw cutting, and trucking, as well as the installation of concrete structures, concrete pipes, fittings, and welding. Additional specialized services required for the project include electrical work, traffic control, construction surveys, and SWPPP implementation. Norstar Plumbing and Engineering, Inc. is managing the subcontractor solicitation process, specifically seeking certified DBE, MBE, SBE, and WBE subcontractors and suppliers to support the project. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for this solicitation are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, identified as solicitation SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in Belmont, North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, alongside the demolition of existing pumps and piping. The completed facility will feature mechanical and electrical systems, pumps, a generator, odor control equipment, stormwater facilities, and fencing. Additionally, the project requires the installation of new gravity sewers and manholes. The estimated project value is 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding requirements, including the submission of MWBE Good Faith Efforts and Table A. The project is governed by EJCDC standard general and supplementary conditions, requiring the successful contractor to provide performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines and NEMA standards for electric motors. Administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Bids are due by November 10, 2026, though some documents indicate a deadline of November 12, 2026.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS