Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Mission Springs Water District Groundwater Quality Protection Program Septic to Sewer Project

Forecast
MS-306State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Mission Springs Water District Groundwater Quality Protection Program Septic to Sewer Project is a long-term infrastructure initiative located in Desert Hot Springs, California, designed to protect potable groundwater by replacing septic tanks with a centralized wastewater collection system. The project involves the construction of 146,200 linear feet of 8-inch sewer pipeline and the installation of approximately 2,500 new 4- to 6-inch service laterals. The primary objectives are to connect 2,600 parcels to the district sewer system and abate over 2,040 on-site septic systems. Work will be performed within roadways and existing rights-of-way, specifically targeting sewer improvement sub-areas A, D-3, G, H, I, J-2, K, and the North Indian Canyon Drive / I-10 corridor. The project is anticipated to span approximately 20 years, with one sub-area constructed roughly every 30 months. Environmental clearance has been established through a Final Mitigated Negative Declaration, and all identified mitigation measures from the Initial Study will be adopted as project conditions and managed via a mitigation monitoring and reporting program. The project is managed by the Mission Springs Water District, with Engineering Manager Eric Weck serving as the primary point of contact.

General Info

Replace 2,040 septic systems with 146k ft of sewer lines connecting 2,600 parcels over 20 years.

Agency

California → Mission Springs Water District

Place of Performance

Desert Hot Springs, CA, 92240

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Mission Springs Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Mission Springs Water District
Office AddressN/A
Contacts
Eric WeckEngineering Manager

Full Description

Show more
The purpose of the project is to install sewer pipeline to eliminate septic tanks that threaten contamination of potable groundwater supplies by expanding MSWD’s wastewater collection system. The District seeks to install sewer main lines and laterals within roadways and existing rights-of-ways, and abatement of septic tanks, within MSWD’s service area. Specifically, several sewer improvement sub-areas were identified to target septic tank abatements; these areas include: A, D-3, G, H, I, J-2, K, and along the along the North Indian Canyon Drive / I-10 corridor. The project would involve the construction of 146,200 linear feet (LF) of 8-inch sewer pipeline. Construction is planned to connect 2,600 parcels to the MSWD sewer system and abate over 2,040 on-site septic systems. In addition, the project includes installation of an estimated 2,500 new 4- to 6-inch service laterals. Construction of this project is anticipated to occur over a period of about 20 years, with one Sub Area to be constructed approximately every 30 months.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is set aside for small businesses, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC pipes ranging from 6 to 30 inches and DIP pipes. Key deliverables include the construction of standard and doghouse manholes, interior drop assemblies, and specialized trenchless crossings with associated launch and receiving shafts. Additional requirements encompass CSO regulator fit out, outfall work, maintenance of flows and bypass, and site preparation activities such as clearing, grubbing, and the implementation of a Stormwater Pollution Prevention Plan. Site restoration will require seeding and fine grading of approximately 5,130 square yards. Project compliance requires adherence to environmental standards via SWPPP and the procurement of specific railroad insurance. Technical requirements include geotechnical instrumentation and monitoring. The project involves significant excavation, with specific provisions for extra depth excavation between 4 and 10 feet, as well as depths exceeding 10 feet.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To achieve a fully functional system, the project requires a wide array of materials and services, including AC paving, trucking, jack and bore operations, cold planing, welding, potholing, and the installation of various pipes and fittings. This solicitation is specifically targeted toward certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with DBE, MBE, SBE, WBE, SBRA, and LSAF certified firms. The project encompasses diverse specialty trades ranging from demolition and traffic control to survey markings and preconstruction video services. All work must be performed in strict accordance with the provided bid documents. The response deadline for this solicitation is November 19, 2026, at 2:00 PM, with primary points of contact being Destiny and Nathan Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 3 hours ago

DEADLINE

in 8 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS