Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on September 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Missouri River Levee R-562 Repair

Closed
W9128F25BA001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 12 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 12 hours ago

DEADLINE

in about 18 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 12 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 17 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Peru, NE, 68421, USA

Set-Aside

SBA

Documents

32

AMD 0007 - R562 Volume 1 Drawings CF272

PDF, High priority: read this firstspecifications
High

AMD 0007 - R562 Volume 2 of 3 Drawings CF300 to CF509R

PDF, High priority: read this firstspecifications
High

AMD+0007 R562 Volume 3 Drawings CF600 to CF920R

PDF, High priority: read this firstspecifications
High

Amendment 0004 to Solicitation W9128F25BA001

PDF, High priority: read this firstamendment
High

Amendment 0006 to Solicitation W9128F25BA001

PDF, High priority: read this firstamendment
High

Amendment 0007 to Solicitation W9128F25BA001

PDF, High priority: read this firstamendment
High

Missouri River Levee System Unit R-562 PL84-99 Bidding Schedule

PDF, High priority: read this firstspecifications
High

NE20250049 Wage Determination - Nebraska Heavy Construction

PDF, High priority: read this firstwage-determination
High

NE20250049 Wage Determination - Nemaha Otoe County

PDF, High priority: read this firstwage-determination
High

R-562 Missouri River Levee System Bidding Schedule

PDF, High priority: read this firstbid-schedule
High

R562 Volume 2 of 6 Drawings CF256_CF272

PDF, High priority: read this firstspecifications
High

R562 Volume 3 of 6 Drawings CF300_CF352

PDF, High priority: read this firstspecifications
High

R562 Volume 4 of 6 Drawings CF361_CF621A

PDF, High priority: read this firstspecifications
High

R562 Volume 5 of 6 Drawings CF651_CF871

PDF, High priority: read this firstspecifications
High

R562 Volume 6 Drawings CF901_BI005

PDF, High priority: read this firstspecifications
High

Section 01 22 00 - Measurement and Payment (R-562 Flood Rehabilitation)

PDF, High priority: read this firstspecifications
High

Section 31 35 19.16 - Anchor Reinforced Vegetation System

PDF, High priority: read this firstspecifications
High

Section 35 31 19 - Stone Protection (Riprap, Spalls, and Bedding)

PDF, High priority: read this firstspecifications
High

Unit R-562 PL84-99 Rehabilitation Project Bid Schedule

PDF, High priority: read this firstbid-schedule
High

W9128F25BA0010004 - Missouri River Levee R562 Repair

PDF, High priority: read this firstifb
High

W9128F25BA001 Amendment 0001 - Missouri River Levee R562

PDF, High priority: read this firstamendment
High

W9128F25BA001 Amendment 0002 - Missouri River Levee R562

PDF, High priority: read this firstamendment
High

W9128F25BA001 Amendment 0003 - Missouri River Levee R562 Repair

PDF, High priority: read this firstamendment
High

W9128F25BA001 Amendment 0005

PDF, High priority: read this firstamendment
High

W9128F25BA001 Amendment 0007 - Missouri River Levee R-562 Repair

DOCX, High priority: read this firstamendment
High

W9128F25BA001 Amendment 0008

PDF, High priority: read this firstamendment
High

W9128F25BA001 - Missouri River Levee R562 Repair

PDF, High priority: read this firstifb
High

W9128F25BA001 - Missouri River Levee Unit R-562 Drawings

PDF, High priority: read this firstspecifications
High

W9128F25BA001 - MR 562 Levee Repairs Abstract of Offers

XLSX, High priority: read this firstaward
High

W9128F25BA001 R-562 Missouri River Levee Unit Rehabilitation Specifications

PDF, High priority: read this firstspecifications
High

R562 I Leve Repeat - Pre-Bid Site Visit Attendee List

PDF, Low priorityother
Low

Successful Step-1 Company List

DOCX, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts
Lee M Mccormick

Full Description

Show more

The Bid Abstract is posted.


___________________________________________________________________________________


AMD 0008 - The purpose of this amendment is to incorporate a revised bid schedule. The bid due date of September 29, 2025 at 2:00 PM remains the same. Bids should be submitted using the SF1442 from Amendment 0004 and the bid schedule from Amendment 0008. All eight amendments should be acknowledged on the SF1442. For bidding purposes, contractors should assume the haul routes shown in the solicitation are valid.


___________________________________________________________________________________


AMD 0007 - The purpose of this amendment is to post revised drawings and specifications, revised bid schedule, update wage determinations, and to revise the due date to September 29, 2025 at 2:00PM CST.  Please refer to the attached Amendment 0007 Narrative for details of revisions.  


____________________________________________________________________________________


AMD 0006 - This amendment extends the due date of bids indefinately due to a bid protest.


____________________________________________________________________________________


AMD 0005 - This amendment extends the due date for bids until 6 August 2025 at 2:00PM CST.  Another amendment to plans and specifications is forthcoming.


____________________________________________________________________________________


AMD 0004 - Step Two specifications and solicitation are posted. Drawings are not uploading due to file size. Drawings will be posted ASAP after this issue is resolved.


____________________________________________________________________________________


AMD 0003 - This amendment incorporates Project Labor Agreement (PLA) requirements into Section 00 73 00 and Section 00 70 00 in FAR clauses 52.222-33 'Notice of Requirement for Project Labor Agreement Alternate I" and 52.222-34 'Project Labor Agreement'.


Due to the material nature of PLA requirements, the Step 1 proposal due date is extended to 17 June 2025 at 2:00 PM local time. New interested offerors may submit Step 1 proposals for consideration.


Interested offerors who have already submitted Step 1 proposals can let their proposal stand or submit a revised proposal by the due date/time. Any proposal revision should be highlighted or annotated in some manner that shows the change from the original proposal. Interested offerors who have already submitted Step 1 proposals will not be informed of their preliminary evaluation results.


The contracting officer will host a web meeting on 13 June 2025 at 1:00 PM local time to discuss the PLA topic. Interested offerors should RSVP to Karen Caskey at karen.l.caskey@usace.army.mil and Lee McCormick at lee.m.mccormick@usace.army.mil with the email address(es) to send the meeting invite to and a list of participants.


_______________________________________________________________________________________________________


AMD 0002 - Offer Due Date has been changed to 16 May 2025 on or before 2:00PM CST, and the contract duration is extended from 547 days to 720 days.


_________________________________________________________________________________________________________


AMD 0001 - Offer Due Date has been changed to 13 May 2025 on or before 2:00 PM CST.


This amendment is issued to extend the due date to 13 May 2025 and update evaluation criteria in the Solicitation Document W9128F25BA0010001 under Section 00 21 00 Instructions, Number 6. Step-One Request for Technical Proposal Evaluation, Factor 2 – Past Performance Changes are in red).


All other terms and conditions remain the same.


_______________________________________________________________________________________________________




The U.S. Army Corps of Engineers, Omaha District, hereby announces the solicitation for The Missouri River Levee R562 Repair.  The solicitation will close on 9 May 2025. The solicitation is restricted to Small Businesses.   



Site Visit:



A Site Visit is scheduled and additional information regarding the site visit is provided in the solicitation via FAR Clause 52.236-27.   The site visit is scheduled for 6 May 2025 at 0900 CST.



Project Description: 



Missouri River Levee R562 Repairs include a combination of structural repair alternatives. The levee repairs include filling scour holes in the severely damaged levee sections, repairing critical levee sections, repairing crest damages, repairing riverside/landside erosion, rehabilitating relief wells, and replacing damaged drainage structures and pipes. May also require incidental material movement to facilitate floating plant access. The work will be in the general vicinity  in/on/around/adjacent to the Missouri Riverbed and banks Peru, NE.



The Contractor will be required to commence work upon receipt of contract award and complete the work 547 calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance. 



Estimated Construction Costs



The estimated construction cost of this project is between $25,000,000 and $50,000,000. 



NAICS Code: 



The Primary North American Industry Classification System (NAICS) code for this solicitation is 237990, Other Heavy and Civil Engineering Construction, with a size standard for Small Business of $45M.



Obtaining Solicitation Documents:



Solicitation documents are posted to the web via SAM.gov (sam.gov).



Find solicitation announcement in SAM.gov (sam.gov).


  1. Use the ‘All Award Data' to locate the project (by entering the solicitation number.
  2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
  3. Once you have located your project, click on link to solicitation to view the project.  Files may be downloaded from the column on the left side reading ‘Attachments/Links’. 


Contracting Office Address:


USACE Omaha District


1616 Capital Ave, Omaha, NE 68102-4901



Point Of Contact:



All questions shall be submitted on ProjNet (ProjNet access, and additional guidance are contained within the solicitation). 



Place of Performance:



Peru, Nebraska



Note:  Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM.  Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete.  The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (sam.gov).   Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments. 

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The USACE Omaha District intends to award a contract for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2, located in Big Bend, Lower Brule, South Dakota. This project is a 100 percent Small Business Set-Aside under NAICS code 237990, with estimated construction costs ranging from 10 million to 25 million dollars. The scope of work involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and the creation of a 200-by-1,500-foot island in Reach 4 of the lake. This island will be planted with cottonwood trees and culturally significant vegetation, protected by a riprap revetment to prevent erosion from wind, waves, and ice. These efforts are expected to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland. The government plans to issue the Invitation for Bid on approximately October 6, 2026, with a closing date around November 10, 2026, and a scheduled site visit on October 28, 2026. The selected contractor must complete the work within 450 days of receiving the Notice to Proceed, and the contract will include provisions for liquidated damages and requirements for both performance and payment bonds. Bids must be submitted through the Procurement Integrated Enterprise Environment Solicitation Module, and all offerors must maintain an active and verified account in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

N/A
View Details
NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
Federal
Cooling Water System Repair and Reliability Project
Solicitation # W9128F26XICGB
The U.S. Army Corps of Engineers Omaha District is seeking capability statements for the Cooling Water System Repair and Reliability Project at Cavalier Space Force Station, ND. This project, estimated between 50 million and 70 million dollars, involves the comprehensive rehabilitation and modernization of a large-scale industrial cooling water system. The scope of work includes installing new fluid coolers, pumps, distribution loops, and a redundant heat exchanger arrangement, as well as the demolition and replacement of 24-inch piping. Critical requirements include maintaining full operational continuity of the system throughout construction to support national defense missions, adhering to HEMP requirements, and performing ACM abatement. The government intends to utilize a Progressive Design-Build approach via an Other Transaction Authority agreement under 10 U.S.C. 2808a, which operates outside the Federal Acquisition Regulation. Selection will be based on qualifications rather than price, focusing on team composition and past relevant experience. The anticipated schedule begins with design in the second quarter of fiscal year 2027, followed by construction in the fourth quarter of the same year. Interested firms must be registered in SAM.gov, capable of bonding at least 70 million dollars for a single project, and compliant with Cybersecurity Maturity Model Certification Level 1.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

4 days ago

DEADLINE

in 6 days
View Details
NAICS: 238990
Federal
GARRISON TRASH RACK MODIFICATION CRANE RENTAL
Solicitation # W9128F26QA099
Solicitation W9128F26QA099 is a firm-fixed-price service contract issued by the U.S. Army Corps of Engineers, Omaha District, for the rental of a crane and a qualified operator at the Garrison Dam near Riverdale, North Dakota. The primary objective is to support the modification of intake trash racks to conserve cool waters for fishery missions during drought conditions. The contractor is responsible for providing all equipment, tools, vehicles, and supervision necessary to lift and lower trash racks weighing between 30,000 and 33,000 pounds, with the capacity to overcome friction factors up to 41,000 pounds. The period of performance is scheduled from October 30, 2026, through June 30, 2027. This procurement is a total set-aside for Women-Owned Small Businesses and Economically Disadvantaged Women-Owned Small Businesses under NAICS 238990. Award will be based on the most advantageous offer, evaluating price alongside technical information and past performance, including three project examples from the last two years. Key compliance requirements include adherence to EM 385-1-1 safety standards, the submission of a site-specific Accident Prevention Plan and Lift Plan, and compliance with Service Contract Act wage determinations for North Dakota. Following Amendment 0001, the closing date for the submission of offers has been extended to October 23, 2026, at 2:00 PM.
All Other Specialty Trade Contractors

POSTED

7 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS