This Solicitation opportunity from California was posted on February 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Mitchell Park Library, a joint library and community center facility in California, is seeking contractors for a wall repair project under the solicitation titled "Mitchell Park Library Wall Repair" with the reference number PE-24006. The library is a vibrant community hub known for its diverse programming, public art, and environmental sustainability, holding a LEED Platinum certification and having earned several accolades, including the New Landmark Library award. This project, managed by the Public Works-Engineering Services agency in Palo Alto, aims to address necessary structural maintenance within the facility, ensuring its continued service to the community.
The solicitation was posted on February 6, 2026, with a response deadline of March 4, 2026. It is managed by a team including the Project Architect, Colette Chew, and Contract Administrator, Steven Dimter, both reachable via provided contact information. The project is categorized under State and Local Government Entity (SLED) organizations, though no specific NAICS code or set-aside type is noted. The facility marked its 10th anniversary in 2024, emphasizing its established role in the community and the importance of maintaining its infrastructure through this repair contract. Interested parties can find more details and submit responses through the official procurement portal.
General Info
Mitchell Park Library seeks contractors for wall repair; submission deadline March 4, 2026.
PDF, High priority: read this first3 pages · allowance-usage-request
HighAI Summary for Allowance Usage Request Appendix D - City of Palo Alto Public Works Engineering: This document is Appendix D titled 'Allowance Usage Request' from the City of Palo Alto Department of Public Works Engineering. It is a form used to request usage of contract allowances, including project and contract details, description and reason for the allowance usage, and a detailed cost breakdown for contractor and subcontractor work. The document includes certification by the contractor, construction manager recommendation, and city approval sections. It references contract general conditions and requires supporting documentation for costs and changes. The form is intended to ensure proper authorization and documentation of allowance usage under a public works contract.
PDF
PDF, High priority: read this first4 pages · sow
HighAI Summary for Appendix C - Temporary Controls for Traffic and Environmental Compliance: This document, titled Appendix C - Temporary Controls, outlines the contractor's responsibilities regarding traffic control, dust control, noise control, and pollution control during the project. It includes detailed traffic control plans requirements, truck route regulations, and exceptions. Dust control must comply with Caltrans standards using reclaimed water, with permits required. Noise control must follow the City's noise ordinance. Pollution control mandates preventing discharge of contaminants into the environment, adhering to storm water pollution prevention standards. The document is essential for ensuring compliance with city regulations and environmental protection during construction activities.
PDF
PDF, High priority: read this first4 pages · sow
HighAI Summary for Appendix C - Temporary Controls for Traffic and Environmental Management: This document, titled Appendix C - Temporary Controls, outlines the contractor's responsibilities and requirements for traffic control, dust control, noise control, and pollution control during the project. It includes detailed traffic control plans, truck route regulations, and restrictions, as well as procedures for dust suppression using reclaimed water, noise ordinance compliance, and environmental protection measures. The document references the City's Traffic Control Requirements, Caltrans Standard Specifications for dust control, and local municipal codes for noise control. It emphasizes the contractor's obligation to maintain controls at all times and the City's authority to enforce compliance. This version provides comprehensive guidelines to ensure safety, environmental protection, and regulatory adherence during construction activities.
PDF
PDF, High priority: read this first3 pages · allowance-usage-request
HighAI Summary for APPENDIX D - Allowance Usage Request Form: This document is Appendix D, titled 'Allowance Usage Request,' from the City of Palo Alto Public Works Engineering Department. It is a form used to request usage of contract allowances, including project and contract details, description and reason for the allowance usage, and a detailed cost breakdown for contractor and subcontracted work. The form requires contractor certification and signatures from the contractor, construction manager, and city officials. It references contract general conditions and includes instructions for documentation and cost basis. The document is intended to support contract modifications related to allowance expenditures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix E - Mitchell Park Library Wall Repair Site Plan: A site plan and parking directive for the Mitchell Park Library wall repair project. It specifies the designated contractor working area and prohibits parking in the library and community center lots, requiring contractors to obtain street parking permits.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Appendix E - Mitchell Park Library Wall Repair Site Plan: A site plan and parking directive for the Mitchell Park Library wall repair project. It specifies that contractors must obtain street parking permits and prohibits parking in the library and community center lots, except for a designated area in front of the damaged wall.
PDF
PDF, High priority: read this first18 pages · structural-calculations
HighAI Summary for Appendix F - Structural Calculations for Palo Alto Mitchell Park Library Stone Wall Repair: This document, dated March 7, 2025, contains detailed structural calculations for the stone wall repair at Palo Alto Mitchell Park Library. Prepared by Rutherford + Chekene, it includes anchor design, boxed stud design, and load calculations based on ASCE 7-22 standards. The calculations cover gravity, seismic, and wind loads, design assumptions, shear and tension forces, and design verifications for screws and studs. The document is stamped and signed, indicating it is a formal engineering submission for structural integrity assessment and design compliance.
DOCX
DOCX, High priority: read this first2 pages · bid-bond
HighAI Summary for Bid Bond Form for City of Palo Alto Project: This Bid Bond form is a guarantee document used by contractors submitting bids to the City of Palo Alto. It binds the contractor and surety to the owner for an amount equal to 10% of the bid proposal, ensuring the contractor honors the bid and executes the contract if awarded. The form includes spaces for contractor and surety information, bond amount, project details, and signatures. It outlines conditions under which the bond is null and void or remains in effect, waivers of notice, and legal provisions including surety obligations and costs in case of legal action. The document is intended to comply with statutory requirements and serves as a statutory bond when applicable.
DOCX
DOCX, High priority: read this first2 pages · payment-bond
HighAI Summary for City of Palo Alto Contractor's Payment Surety Bond: This document is a Contractor's Payment Surety Bond for the City of Palo Alto, California. It secures payment claims under a public improvements agreement between the City and the Principal contractor. The bond amount is at least 100% of the contract value as required by California Civil Code section 9554. It guarantees payment to laborers, subcontractors, and suppliers as per Civil Code section 9100, including coverage for unemployment insurance deductions. The Surety waives notice of contract changes and agrees to pay attorney fees if sued. The bond is executed by the Principal and Surety, with a notary acknowledgment section included.
PDF
PDF, High priority: read this first3 pages · utility-map-request-form
HighAI Summary for City of Palo Alto Utility Map Request Form and Confidentiality Agreement: This document from the City of Palo Alto Utilities Department provides instructions and forms for requesting utility infrastructure information including water, gas, wastewater, electric, and fiber. It includes a Utility Map Request Form requiring requestor contact details, reason for request, and driver's license information. A signed Confidentiality Agreement is also required to ensure the sensitive utility information is kept confidential and used only for the stated purpose. The document outlines submission instructions and conditions for handling confidential materials. It is intended to protect utility infrastructure by limiting sensitive information disclosure and ensuring proper use of the data.
PDF
PDF, High priority: read this first104 pages · contract-document
HighAI Summary for Construction Contract for City of Palo Alto Project XXXX: This Construction Contract document, Contract No. XXXX, is between the City of Palo Alto and a Contractor for a specified project. It includes detailed sections such as incorporation of recitals and definitions, project description, contract documents list, contractor duties, project team, time of completion, compensation, indemnification, insurance, default and termination clauses, governing law, prevailing wages, and other standard contract provisions. The document references an Invitation for Bids (IFB) and outlines the order of precedence among contract documents. It serves as the formal agreement governing the construction project, specifying roles, responsibilities, and legal requirements.
DOCX
DOCX, High priority: read this first3 pages · bid-form
HighAI Summary for IFB Mitchell Park Library Wall Repair Project Bid Form: This Bid Form is part of the Invitation For Bids (IFB) for the Mitchell Park Library Wall Repair Project issued by the City of Palo Alto. It includes sections for the Base Bid, Supplemental Unit Pricing, Additive Alternate Bid, and Deductive Alternate Bid. The form requires bidders to provide pricing for labor, materials, equipment, transportation, taxes, profit, insurance, bonds, and overhead. The Base Bid covers complete installation and related work as detailed in project plans and specifications. Supplemental Unit Pricing is for potential additional work post-award. The document emphasizes estimated quantities subject to adjustment per contract conditions. This form is essential for submitting a formal bid in response to the IFB.
PDF
PDF, High priority: read this first2 pages · special-provisions
HighAI Summary for IFB Mitchell Park Library Wall Repair Special Provisions: This document contains the Special Provisions for IFB Mitchell Park Library Wall Repair project. It supplements the General Conditions and outlines project-specific requirements including staff qualifications, project schedule, traffic control, insurance, warranty provisions, submittal substitution requests, library coordination, and parking. Key points include mandatory weekly look-ahead schedules, submission of a Construction Logistics and Traffic Control Plan, builder's risk insurance requirements, extended warranty conditions, and coordination with the library to minimize disruption. The document is essential for bidders to understand project-specific obligations and compliance requirements.
PDF
PDF, High priority: read this first2 pages · special-provisions
HighAI Summary for IFB Mitchell Park Library Wall Repair Special Provisions: This document contains the Special Provisions for IFB Mitchell Park Library Wall Repair project. It supplements the General Conditions and outlines project staff qualifications, project schedule requirements, traffic control plans, insurance requirements including Builder's Risk Insurance, specific warranty provisions, submittal substitution requests, library coordination during construction, and parking regulations. The provisions emphasize contractor responsibilities for scheduling, safety, coordination with the library, and compliance with city requirements. The document is essential for bidders to understand project-specific conditions and requirements.
PDF
PDF, High priority: read this first9 pages · bid-plans
HighAI Summary for Mitchell Park Library Stone Wall Repair Bid Plans: This document is the bid plans for the Mitchell Park Library Stone Wall Repair project located at 3700 Middlefield Road, Palo Alto, California. Issued on May 23, 2025, it includes detailed architectural drawings and general notes outlining the scope of work, which involves removing, repairing, and replacing damaged exterior stone wall systems and interior wall systems to match existing conditions. The plans specify construction requirements, demolition guidelines, and compliance with California Building Codes and related regulations. The document serves as a permit set for contractors to prepare bids and coordinate construction activities.
PDF
PDF, High priority: read this first9 pages · bid-plans
HighAI Summary for Mitchell Park Library Stone Wall Repair Permit Set 05/23/2025: This document is the permit set dated May 23, 2025, for the Mitchell Park Library Stone Wall Repair project located at 3700 Middlefield Road, Palo Alto, California. It includes general notes, project data, and conditions of approval related to the construction and repair of the stone wall. The document outlines contractor responsibilities, compliance with California Building Codes, demolition guidelines, and structural requirements. It serves as a critical technical reference for bidders and contractors involved in the project.
PDF
PDF, High priority: read this first225 pages · bid-specifications
HighAI Summary for Mitchell Park Library Wall Repair Bid Specifications January 2026: This document is the bid specifications for the Mitchell Park Library Wall Repair project located at 3700 Middlefield Road, Palo Alto, California, dated January 2026. It includes a detailed table of contents covering general requirements, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, and other construction divisions. The summary section outlines the scope of work involving repair of exterior and interior walls damaged by a vehicle, including replacement of windows, signage, and other affected elements. The contract method is a single lump-sum contract with compliance required to local, state, and federal codes, including California Building Codes and sustainability considerations. The document sets forth contract time, application of contract documents, and precedence of contract documents in case of conflicts.
PDF
PDF, High priority: read this first225 pages · bid-specifications
HighAI Summary for Mitchell Park Library Wall Repair Bid Specifications January 2026: This document is the bid specifications for the Mitchell Park Library Wall Repair project located at 3700 Middlefield Road, Palo Alto, California, dated January 2026. It includes a detailed table of contents covering general requirements, masonry, metals, wood and plastics, thermal and moisture protection, doors and windows, finishes, and other construction divisions. The summary section outlines the scope of work involving repair of exterior and interior walls damaged by a vehicle, including replacement of windows, signage, and other affected elements. The contract method is a lump-sum contract with specified contract time and scheduling requirements. The document also specifies compliance with applicable local, state, and federal codes, including California building codes and sustainability considerations for a green project. Contract document precedence and application of codes are also addressed.
PDF
PDF, High priority: read this first22 pages · ifb
HighAI Summary for Mitchell Park Library Wall Repair IFB PE-24006: This Invitation for Bids (IFB) PE-24006, dated February 5, 2026, is issued by the City of Palo Alto for the Mitchell Park Library Wall Repair project. The IFB outlines the scope of work to repair damage to the library's exterior and interior walls caused by a vehicle incident, including replacement of stone walls, windows, signage, and other damaged elements. The document includes instructions for bidders, bid submission deadlines (March 4, 2026), mandatory pre-bid meeting details, contractor license requirements, bid security, and project schedule. The work is anticipated to commence around June 1, 2026, with completion within 120 working days. The IFB package and contract documents are available electronically through the City's procurement portal.
DOCX
DOCX, High priority: read this first2 pages · performance-bond
HighAI Summary for Performance Bond for City of Palo Alto Public Improvements: This document is a Contractor's Performance Surety Bond for the City of Palo Alto, California. It secures the faithful performance of a public improvements contract between the City and the Principal contractor. The bond obligates the Principal and Surety to cover the penal sum and any additional costs, including attorney's fees and liquidated damages, if the Principal fails to fulfill the contract terms. The Surety waives rights to notice of contract changes and agrees to remain liable despite alterations. The document includes execution and acknowledgment sections for signatures and notarization, ensuring legal enforceability under California law.
PDF
PDF, Low priority12 pages · other
LowAI Summary for Appendix A - Mitchell Park Library Reference Drawings: This document titled 'Appendix A - Mitchell Park Library Reference Drawings' appears to contain reference drawings related to the Mitchell Park Library project. The content provided is empty or unreadable, with no visible text or details available for review.
PDF
PDF, Low priorityspecifications
LowAI Summary for Appendix B - Palo Alto Truck Route Map: A map appendix for the City of Palo Alto detailing truck routes, including through routes, local routes, special routes, and delivery zones. Revised August 22, 2002.
PDF
PDF, Low priorityspecifications
LowAI Summary for City of Palo Alto Truck Route Map (Appendix B): Appendix B of the City of Palo Alto, California, providing a Truck Route Map based on Chapter 10.48 P.A.M.C. The document includes a legend for through, local, and special truck routes, as well as a specific weight limit note for Middlefield Rd. in Menlo Park. Revised August 22, 2002.
PDF
PDF, Low priority12 pages · other
LowAI Summary for Mitchell Park Library Reference Drawings Appendix A: This document titled 'E - APPENDIX A - Mitchell Park Library Reference Drawings' appears to be a set of reference drawings related to the Mitchell Park Library project. The content provided is empty or unreadable, with no visible text or details available for review. The document likely serves as an appendix containing visual or technical drawings but lacks extractable textual information.
The Mitchell Park Library is part of a joint library and community center facility, serving diverse community needs. The lively space includes public art and supports a wide array of library programming. Mitchell Park Library is LEED Platinum certified and has won multiple awards including New Landmark Library award from Library Journal. The Mitchell Park Library and Community Center facility celebrated its 10th anniversary in 2024.
More opportunities from California → Public Works-Engineering Services
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.