Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on January 28, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MK20 Long Lead Parts for Electro Optic Sensor Systems

Awarded
N00174-16-R-0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334511
New
DIBBS
TAG, CASUALTY TRIAGE
Solicitation # SPE2DS-27-T-1137
Solicitation SPE2DS-27-T-1137, issued by the DLA Troop Support Medical Supply Chain, is a request for quotations for the procurement of one package of Casualty Triage Tags (NSN 6515-01-587-1700). These combat casualty cards are designed for patient documentation during the three phases of tactical combat casualty care and are constructed from waterproof, tear-resistant ruggedized paper. Each tag features a grommet-reinforced punch and is sized to fit into an Individual First Aid Kit (IFAK). The required unit of issue is a package containing 25 tags, with pack dimensions of 6 by 4.5 by 1.5 inches and a weight of 5.5 ounces. The contract requires strict adherence to DLA packaging and marking standards, specifically RP001, ASTM D3951, and Medical Marking Standard No. 1, which supersedes MIL-STD-129 for medical materials. Delivery is required by November 2, 2026, with destination inspection mandated under FAR 52.246-2. Administrative requirements include the use of the Wide Area Workflow (WAWF) system for invoicing and payment. The procurement is subject to the Buy American Act and DFARS 252.225-7001, and it incorporates specific cybersecurity and telecommunications restrictions. Evaluation may include a price preference for HUBZone small businesses, and all offerors must maintain active certifications in the System for Award Management (SAM).
MEDICAL SUPPLY CHAIN MD SURG FSF

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 334511
New
DIBBS
INSERTION KIT, CHEST TU
Solicitation # SPE2DS-27-T-1136
Solicitation SPE2DS-27-T-1136, issued by the DLA Troop Support Medical Supply Chain, is a request for quotations for four emergency chest tube insertion kits (NSN 6515-01-579-3275). These 12-piece, sterile, single-use kits are designed for the rapid relief of pneumothorax or hemothorax at or near the point of injury. Each kit must include specific components such as a 36 FR x 20 inch chest tube, a chest drain valve, a disposable scalpel, and various forceps and sutures, all vacuum-sealed in a 3.5 mil nylon poly barrier bag. The items must have a non-extendable shelf life of 36 months, with no more than 6 months elapsed from the date of manufacture to the date of delivery. The contract requires delivery to Fort Bragg, North Carolina, within 20 days after receipt of the order, with FOB Destination terms. Inspection and acceptance will occur at the destination per FAR 52.246-2. Packaging must adhere to ASTM D3951 and RP001, while marking and labeling must comply with MIL-STD-129 and Medical Marking Standard No. 1. Bidders are required to specify the source and part number being supplied. The procurement incorporates various federal and defense regulations, including the Buy American Act, DFARS cybersecurity reporting requirements, and the use of the Wide Area WorkFlow system for electronic invoicing. Award preferences may be given to HUBZone concerns.
MEDICAL SUPPLY CHAIN MD SURG FSF

POSTED

about 5 hours ago

DEADLINE

in 6 days
NAICS: 334511
New
Federal
Automated Traffic Enforcement Trailer
Solicitation # W911S226U4411
Solicitation W911S226U4411 is a Total Small Business Set-Aside for the procurement of a complete, towable, autonomous mobile traffic enforcement trailer and laser-based measuring system for the Department of Defense at Fort McCoy, Wisconsin. The primary requirement is for one Automated Traffic Monitoring System Trailer, specifically the POLISCAN Speed FM1 or an approved equal, capable of tracking multiple vehicles across at least four adjacent traffic lanes to enforce speed limits and red-light violations. The contract includes a requirement for eight hours of on-site operator training at Fort McCoy and a minimum 12-month comprehensive manufacturer's warranty. All equipment must be new, and the system must be calibrated to federal and state standards to ensure data is legally admissible in court. The award will be granted to the responsible offeror whose proposal is most advantageous to the government based on price and technical evaluations. Delivery is required F.O.B. Destination to Fort McCoy, with a preferred delivery window of 30 days. Offerors must submit their proposals via the PIEE Solicitation module, including technical, price, and past performance documentation. A critical requirement for responsiveness is the completion of Attachment 1 regarding certifications and the identification of the country of origin. The contract incorporates various regulatory clauses, including Buy American preferences, cybersecurity reporting under DFARS 252.204-7012, and prohibitions on certain telecommunications equipment.
W6QM Micc-Ft Drum

POSTED

about 10 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The Naval Surface Warfare Center, Indian Head Explosive Ordnance Disposal Technology Division, intends to award a firm fixed price purchase order to L-3 KEO for the procurement of long lead parts for MK20 Electro Optic Sensor Systems. This action is being conducted on a sole source basis under FAR 6.302, as L-3 KEO is identified as the only vendor capable of providing the required items. The procurement falls under NAICS code 334511 and is managed by the Department of Defense. Interested parties or inquiries regarding this presolicitation, identified by solicitation number N00174-16-R-0009, are directed to the point of contact, Edward Rogan, at the Picatinny Detachment.

General Info

Contract Value

$134,448

NAICS

334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

Place of Performance

MD, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Nswc Indian Head Division
Contacts1 person available
OfficeINDIAN HEAD, MD, 20640-1533, USA
Office AddressINDIAN HEAD, MD, 20640-1533, USA

Full Description

Show more
NAICS Code is 334511. Naval Surface Warfare Center, Indian Head Explosive Ordnance Disposal Technology Division- Picatinny Detachment (NSWC IHEODTD), Indian Head Maryland, intends to issue a Firm Fixed Price Purchase Order on a sole source basis to L-3 KEO, Northampton, MA 01060. The contractor shall provide long lead parts for the MK20 Electro Optic Sensor Systems (EOSS). This purchase order will be negotiated with L-3 KEO as they are the only known vendor that can provide these items. Inquiries may be directed to Edward Rogan NSWC IHEODTD - Picatinny Detachment (contact@example.gov), Bldg. 61N, Code 022ER, Picatinny Arsenal, NJ 07806-5000. This synopsis is for information purposes only. The proposed contract action is for supplies or services for which the government intends to solicit and negotiate with only one source under the authority of FAR 6.302.

More opportunities from Department Of Defense → Nswc Indian Head Division

Same awarding agency

NAICS: 321920
New
Federal
MIL-Spec Wood Crates IAW ASTM D6880/PPP-B-621
Solicitation # N0017427Q0001
The Naval Surface Warfare Center Indian Head Division is soliciting quotes for a firm-fixed-price purchase order to manufacture 1,200 MIL-Spec wood shipping crates, specifically Container Assembly Drawing 1516298 Rev N, measuring approximately 81 x 8 x 8 inches. This procurement is a total small business set-aside under NAICS code 321920. The crates are intended for use in fleet-deliverable Aviation Critical Safety Items and must adhere to strict technical specifications, including ASTM D6880, PPP-B-621, and MIL-STD-129. Delivery is required by November 27, 2026, to the Indian Head, Maryland facility. Award will be based on the Lowest Price Technically Acceptable (LPTA) basis, evaluating both technical specifications and total price, including shipping. To be deemed technically acceptable, offerors must provide documentation of an active CMMC Level 1 Self-Assessment in the Supplier Performance Risk System (SPRS), though separate contract clauses mandate CMMC Level 2 compliance and NIST SP 800-171 R2 adherence for handling Controlled Unclassified Information. Additionally, contractors must maintain an ISO 9001:2015 quality management system and provide a Final Dimensional Inspection Report for each deliverable. Interested parties must request technical drawings via email by November 9, 2026, and provide ITAR certification prior to the release of these documents. Final quote packages, including the company name, point of contact, UEI, and CAGE code, are due by November 12, 2026, at 8:00 AM EST. Invoicing and receiving reports must be processed electronically through the Wide Area Workflow (WAWF) system.
Wood Container and Pallet Manufacturing

POSTED

about 10 hours ago

DEADLINE

in 14 days
View Details
NAICS: 332710
Federal
Body, Retainer, and Gasket
Solicitation # N0017426Q1120
The Naval Surface Warfare Center Indian Head Division (NSWC IHD) is soliciting quotes under RFQ N0017426Q1120 for the fabrication, inspection, and delivery of Aviation Critical Safety Items (ACSIs), specifically Delay Bodies, Ignition Device Retainers, and Aluminum Gaskets. This is a total small business set-aside under NAICS code 332710, intended to be awarded as a firm-fixed-price purchase order. The government will utilize a Lowest Price Technically Acceptable (LPTA) basis for award, evaluating quotes based on technical adherence to specifications and total price, including shipping and handling. All deliverables must be delivered FOB Destination to Indian Head, Maryland, with an overall delivery deadline of April 30, 2027. Prospective contractors must meet stringent technical and security requirements. ITAR certification is required to receive technical drawings, which must be requested by October 23, 2026. A critical requirement for technical acceptability is the verification of a current CMMC Level 2 status (Conditional or Final) recorded in the Supplier Performance Risk System (SPRS). Additionally, the contractor must maintain a quality management system adhering to ASQ/ANSI/ISO 9001:2015 and submit an Inspection Test Plan and First Article Testing (FAT) samples where applicable. Quote packages, including the company name, point of contact, UEI, and CAGE code, must be submitted via email by November 6, 2026, at 10:00 AM EST.
Machine Shops

POSTED

21 days ago

DEADLINE

in 7 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS