Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Michigan was posted on August 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MLK Bridge Reconstruction Project

Closed
2025-REQ-0083State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The City of Pontiac is seeking qualified contractors to undertake a comprehensive reconstruction project along Martin Luther King Jr. Boulevard, spanning approximately half a mile from Woodward Avenue to South Boulevard East. The scope of work includes complete removal and replacement of the existing pavement and bridge structure over the Grand Trunk Western Railroad, along with the installation of new concrete pavement, curbs, gutters, sidewalks, storm drainage systems, noise barriers, and retaining walls. The project also involves upgrading lighting, implementing traffic control measures, and restoring the site upon completion. All construction activities must adhere to Michigan Department of Transportation standards and city requirements, with coordination efforts in place for rail-related work involving the GTWRR. The project, titled the MLK Bridge Reconstruction Project, is valued between 15 and 30 million dollars and was posted on August 22, 2025, with a response deadline of September 23, 2025. It is open to general contractors under NAICS code 237110, focusing on heavy civil engineering construction. The primary point of contact for inquiries is Michael Rieth, reachable via email or phone. The project emphasizes compliance with safety, quality standards, and coordination with relevant authorities to ensure a smooth and efficient reconstruction process. More details and the solicitation can be accessed through the provided online portal link.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan → City of Pontiac
Contacts1 person available
OfficeN/A

Full Description

Show more
The City of Pontiac seeks qualified contractors to provide all labor, materials, equipment, and supervision for the reconstruction of Martin Luther King Jr. Boulevard from Woodward Avenue to South Boulevard East, including the full replacement of the bridge over the Grand Trunk Western Railroad (GTWRR). This project encompasses approximately 0.5 miles of roadway and associated infrastructure. Work includes complete pavement and structure removal, installation of new jointed plain concrete pavement, curbs, gutters, sidewalks, storm sewers, drainage structures, noise barrier walls, mechanically stabilized earth walls, bridge superstructure and substructure, lighting, traffic control, and site restoration. All work must be performed in compliance with Michigan Department of Transportation (MDOT) standards, applicable City of Pontiac requirements, and coordination with GTWRR for rail-related activities.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS