Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Mlk Jr. Way Streetscape Project Construction Management Support Services (1008516)

Active
20260721031State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Oakland is seeking a consultant to provide Construction Management Support Services for the MLK Jr. Way Streetscape Project, aimed at enhancing pedestrian and bicycle safety in West Oakland through infrastructure improvements such as a raised two-way cycle track, curb ramps, bulb-outs, high-visibility crosswalks, pedestrian lighting, new street trees, fiber optic cable for public WiFi, upgraded traffic signals, and full-depth pavement reconstruction. The selected consultant will serve as an extension of City staff, deploying a licensed Resident Engineer to oversee inspection, materials testing, environmental monitoring, and overall project coordination across pre-construction, construction, and close-out phases. Work must comply with City of Oakland standards, Caltrans, AASHTO, ICC, ACI, AWS, and federal regulations, with all material testing adhering to Caltrans Test Methods and labor practices following the City’s Living Wage Ordinance and L/SLBE Program guidelines. Performance is focused on the project site in Oakland, with all deliverables requiring City approval and documentation for invoicing and audit readiness. Proposals are due by August 13, 2026, and must be submitted electronically through the iSupplier portal, with hard copies accepted only via mail or hand delivery to the City Clerk. Evaluation will be based on a composite score of 100 points, weighted heavily toward overall approach and project management (35 points), team organization and teamwork (25 points), key personnel qualifications (20 points), firm experience (15 points), and client references (5 points). The award will follow a trade-off process, with technical merit accounting for 60% of the evaluation through interviews and proposals contributing 40%; cost is not evaluated as a standalone factor. Contractors must comply with stringent special requirements including prohibition of services to ICE, CBP, and HHS/ORR, adherence to Oakland’s Sanctuary City Ordinance, Equal Benefits Ordinance, Border Wall Prohibition, mandatory insurance coverage naming the City as additional insured, and a 50% participation threshold for Local and Small Local Business Enterprises. All subcontractors must flow down these requirements, and contractors must maintain compliance throughout the term. Payment processing is managed through the City’s iSupplier system, with monthly invoicing tied to deliverables, timesheets, and receipts; financial records must be kept in accordance with GAAP, and audit rights are reserved by the City. All offerors must submit completed schedules addressing debarment status, workforce demographics, L/SLBE participation, and project team structure, with

General Info

Oakland seeks consultant for MLK Jr. Way streetscape construction management, including engineering, inspection, and environmental monitoring.

Agency

California → City of OaklandView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Berkeley, CA, 94703, USA

Set-Aside

NONE

Documents

(2)

RFP 1008516 MLK Jr. Way Streetscape Project Construction Management Support Services

PDFrfp

Addendum No. 1 for Project 1008516 Martin Luther King Jr. Way Streetscape Project

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Oakland
View Agency Profile
Office AddressN/A

Full Description

Show more
This is a Request for Proposals for a consultant to provide Construction Management Support Services (CMSS) for the MLK Jr. Way Streetscape Project. The construction project aims to improve pedestrian and bicycle safety in West Oakland by installing a new raised, two-way cycle track, curb ramps, bulb-outs, high-visibility crosswalks, pedestrian lighting, and new street trees. The project also includes installing fiber optic cable for public WiFi, new traffic signals, and full-depth pavement reconstruction. The CMSS consultant will act as an extension of City staff, providing a Resident Engineer (PE) and overseeing inspection, materials testing, and environmental monitoring services throughout the pre-construction, construction, and close-out phases.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SEEKING QUALIFIED SUBCONSULTANTS IN RIVERSIDE COUNTY/SOCAL TO SUPPORT WELL REPLACEMENT PROJECT WITH WATER DISTRICT
Solicitation # seeking-qualified-subconsultants-riverside-countysocal-support-well-replacement-project-water
GHD Inc. is soliciting qualified subconsultants to support the Corydon Well Replacement Design Project for Elsinore Valley Municipal Water District in Riverside County, California, with a focus on engaging Disadvantaged Business Enterprises, Small Business Enterprises, Women-Owned Business Enterprises, Minority-Owned Business Enterprises, and other certified small businesses. The project requires a range of professional services including engineering, environmental consulting, surveying, geotechnical analysis, permitting, public outreach, and utility location, with work expected to align with multiple NAICS codes such as 541330 for engineering services. Interested firms must submit a qualifications package by August 7th, 2026, and request solicitation documents no later than 5 p.m. PST on August 14th, 2026, to Charlie Brown at charles.brown@ghd.com. The formal response deadline for submissions is September 15th, 2026, and the opportunity is set aside under SBA programs for Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business entities, alongside DBE certification under the Department of Transportation.
GHD Inc.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc., acting on behalf of the Elsinore Valley Municipal Water District, is seeking proposals from Disadvantaged Business Enterprise (DBE) firms to provide comprehensive design, bidding support, and engineering services during construction for the Corydon Well Replacement Project. The project involves designing a new municipal groundwater production well to replace and permanently abandon the existing Corydon well, with technical specifications requiring compliance with AWWA potable water well standards, SWRCB-DDW, DWR, and EVMWD requirements. The new well must feature a 24-inch diameter stainless steel Ful-Flo louvered screen, match existing vertical turbine pump equipment, and tie into the Corydon Blend station and Malaga blending transmission main. The scope is divided into two phases: Phase 1 includes civil site design, technical specifications, line-bid items for drilling and abandonment, plus full-time on-site construction management oversight; Phase 2 involves architectural, structural, electrical, mechanical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key deliverables include a Preliminary Design Report at 30% design level, review of up to 200 submittals, assistance with a Domestic Water Supply Permit Amendment, and development of Record Drawings reflecting field changes, along with startup and operator training support. The solicitation is issued as a Request for Proposals under the SBA small business set-aside program, with eligibility extended to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, SBA-certified Service-Disabled Veteran-Owned Small Business, and Disadvantaged Business Enterprise firms. All proposals must be submitted via the PlanetBids Vendor Portal by 10:00 a.m. local time on September 1, 2026, following strict formatting requirements including a cover letter, detailed project approach, qualified personnel resumes, representative project history, three references, and a fully itemized cost proposal broken down by task with hourly rates and incidental costs. Proposals must include mandatory certifications such as American Iron and Steel Compliance, Lobbying Certification, Debarment and Suspension Certification, System for Award Management (SAM) information, Executive Order N-6-22 compliance related to Russian sanctions, Conflict of Interest Disclosure, Insurance Requirements Acknowledgment, Public Works Contractor Registration, and Iran Contracting Act certification if the proposal exceeds $1 million. The award will be based on demonstrated competence and professional qualifications with evaluation factors weighted as follows: Relevant Qual
Ardurra Group, Inc.

POSTED

about 3 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project entails the design, construction support, and full lifecycle engineering services for a new municipal groundwater production well to replace and permanently abandon the existing Corydon Well, located on Elsinore Valley Municipal Water District (EVMWD) property. The project is divided into two phases: Phase 1 focuses on the design of the new well, site facilities, and abandonment of the existing well in strict compliance with Riverside County and California State Water Resources Control Board standards, including preparation of technical specifications, civil site drawings, line-bid items, bidding assistance, and full-time on-site construction management and hydrogeological oversight during drilling. Phase 2 involves engineering design and support for the well equipping phase, encompassing architectural, civil, mechanical, structural, electrical, and instrumentation and controls systems, along with testing, commissioning, and documentation for operational readiness. The new well must feature a 24-inch diameter stainless steel Ful-Flo louvered screen matching the existing casing depth, with sanitary seals installed per AWWA potable water well construction standards. The project is subject to the Build America, Buy America Act and 2 CFR Part 184, requiring certification of domestic sourcing for iron, steel, and manufactured products, with detailed documentation and substitution review procedures mandated. Federal funding from a Bureau of Reclamation grant up to $400,000 imposes compliance with Uniform Administrative Requirements (2 CFR Part 200), including debarment and suspension certification, lobbying restrictions under the Byrd Act, Clean Air Act and Clean Water Act flow-downs to subcontracts over $150,000, and procurement of recovered materials when purchase thresholds are met. The engagement requires a fully qualified firm to provide comprehensive multidisciplinary services including hydrogeology, aquifer analysis, geotechnical investigation, soil and corrosion testing, subsurface utility location, environmental permitting, water quality sampling, public outreach, and regulatory coordination with state and local agencies. A detailed proposal must include firm qualifications, relevant municipal water and well project experience, resumes of key personnel, current California professional licenses, DBE and small business participation plans, a California Air Resources Board Certificate of Reported Compliance, Department of Industrial Relations registration for public work, and a validated Unique Entity Identifier with System for Award Management status. Proposals must address the detailed scope outlined in Attachments 1 and A, provide a cost structure broken down by task with hourly rates and incidental charges, and comply with all certification requirements in Attachment 2—including Conflict of
GEI Consultants, Inc.

POSTED

about 3 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541330
New
Federal
Area of Interest (AoI) – Lifecycle Sustainment, Advanced Engineering, and Multi-Class Parts Sourcing Support Services (CSO-W911KF25SC002)
Solicitation # W911KF-25-S-C002-A010
This contract announcement establishes an Area of Interest under the ACC-ANAD Organic Industrial Base Modernization Commercial Solutions Opening, soliciting solutions for comprehensive sustainment of legacy defense systems including ground combat vehicles, locomotives, and artillery. The requirement is structured around three core capability areas: Technical, Engineering, and Depot Sustainment Services; Advanced Manufacturing, Reverse Engineering, and Digital Twin Integration; and Multi-Class Parts Sourcing and DMSMS Mitigation. Offerors may respond to one, two, or all three areas, with submissions due no later than 5:00 PM CDT on August 10, 2026, and evaluated using a sustainment-first hierarchy that prioritizes Integrated Sustainment and Lifecycle Support Strategy, DMSMS Mitigation and Parts-Sourcing Agility, Reverse Engineering and Advanced Manufacturing Maturity, and Specialized Mobile Heavy Equipment and Locomotive Capabilities. Proposals are assessed as either Acceptable or Unacceptable on technical merit and Fair and Reasonable or Not Fair and Reasonable on price, with award based on Best Value trade-off as defined by the FY26 NDAA, not Lowest Price Technically Acceptable. All submissions must be electronically delivered via the designated CSO portal in compliance with specified format rules—five single-sided pages or fifteen slides for the initial solution brief—and must not be marked confidential, though proprietary data must be clearly identified and is protected under FOIA for five years. Performance is centered at Anniston Army Depot, Alabama, with delivery timelines requiring rapid response to spare parts needs, including Class 4 and Class 9 components sourced outside traditional federal supply chains within three calendar days. Contractors must adhere to AS9100 quality standards, implement Configuration Management procedures, and produce non-proprietary Level 3 Technical Data Packages through reverse engineering and advanced manufacturing techniques such as 3D printing. Packaging, preservation, and marking must align with defense quality systems, though specific MIL-STDs for these functions are not prescribed. Payment processing is exclusively through the Payment Invoicing and Evaluation Engine (PIEE), and all offerors must maintain a current Unique Entity ID and active SAM.gov registration, with no small business or socioeconomic certifications required at this pre-award phase. The contract vehicle supports task orders with a general twelve-month performance period and is governed under FAR Part 12 Commercial Item Procedures using a fixed-price structure; contractors must obtain necessary security clearances if foreign-owned, and no work may commence without a formal written directive from the Contracting Officer. Point
W6QK Acc Anad

POSTED

about 7 hours ago

DEADLINE

in 11 days
View Details
NAICS: 541330
New
Federal
CMR PERIMETER WALL REINFORCEMENT DESIGN
Solicitation # 19C02026Q0023
The US Embassy Bogota, under the Department of State, is soliciting professional engineering services for the CMR Perimeter Wall Reinforcement Design project, identified by solicitation number 19C02026Q0023. The project focuses on a stone masonry retaining wall along Carrera 4ta, which ranges from 2.8 to 3.5 meters in height and shows signs of structural distress. The selected contractor will be responsible for conducting a comprehensive technical evaluation, subsurface investigation, and stability analysis to develop a long-term remediation solution. The final deliverable is an Issued-for-Construction (IFC) design package that restores structural stability and adheres to international seismic design standards to ensure the security of the embassy compound. The contract will be awarded based on the lowest priced technically acceptable (LPTA) offer, and the government may award the contract based on initial offers without further discussion. Performance will take place in Bogota, Colombia, under NAICS code 541330. Offerors must submit their proposals via email to BogotaGSOCompras@state.gov by the deadline of August 31, 2026. Compliance with NDAA Section 889 regarding prohibited telecommunications equipment is mandatory, as specified in FAR clauses 52.240-90 and 52.240-91. While registration in the System for Award Management (SAM) is not required at the time of proposal submission, it is necessary for the final award.
US Embassy Bogota

POSTED

about 7 hours ago

DEADLINE

in 20 days
View Details

More opportunities from California → City of Oakland

Same awarding agency