This Solicitation opportunity from Tennessee was posted on June 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Moccasin Bend Environmental Campus Electrical Improvements

Closed
200787-2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The project has an estimated value of 16,690,000 dollars. This solicitation is set aside for Small Businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation criteria focusing on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The agreement is based on EJCDC standard forms, requiring performance and payment bonds, as well as proof of insurance. Bids are due by November 10, 2026, with a final bid opening date of November 12, 2026. Contract administration involves monthly progress payments due 30 days after presentation to the owner, subject to review by the Engineer and the Resident Project Representative. The contractor must adhere to rigorous technical standards, including AWS D1.2 for welding and NEMA standards for motors. Materials must be delivered in original manufacturer packaging with specific labeling and storage requirements, such as maintaining a minimum ambient temperature of 45 degrees Fahrenheit for coatings. The project commences upon the issuance of a Notice to Proceed, which typically occurs within 30 to 60 days of the bid opening or effective date.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical and structural requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation of new slide gates and modifications to existing sluice gates. Additional technical tasks include the rehabilitation of reactor mixers and aerators, the installation and operation of a temporary 11 MGD pumped bypass, and extensive electrical and instrumentation upgrades, including the replacement of motor control center components. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and the provision of access hatches. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Submissions should be based on Garney Standard PO and Subcontract Forms, with any exceptions submitted as redlines.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The Moccasin Bend Environmental Campus Electrical Improvements contract involves comprehensive electrical upgrades and equipment replacements at the facility. The project includes an interim milestone phase focused on replacing primary clarifier equipment such as motors, drives, axles, and associated components for eight primary clarifiers, along with lateral sludge collectors and scum skimmers. This phase also encompasses electrical work, installation of variable frequency drives (VFDs), replacement of motor control centers in primary sludge pump buildings, and SCADA system integration. The substantial completion phase targets upgrading various medium voltage switchgear at critical infrastructure points, including influent relief and pump stations, wet weather facilities, and the operations and control building, ensuring improved electrical reliability and operational efficiency. The solicitation, issued by the City of Chattanooga, Tennessee, under NAICS code 237110, is valued between five and ten million dollars. The project was posted on June 23, 2025, with a response deadline of July 10, 2025. Interested bidders are directed to contact Debbie J Talley via email for further information. The project aims to enhance the electrical infrastructure of the campus, supporting improved wastewater treatment operations and ensuring compliance with modern standards.

Documents

8

Addendum 01 for Moccasin Bend Environmental Campus Electrical Improvements

PDF, High priority: read this firstamendment
High

Addendum 5 for MBEC Electrical Improvements Contract W-22-010-201

PDF, High priority: read this firstamendment
High

MBEC Electrical Improvements Addendum No. 3

PDF, High priority: read this firstamendment
High

MBEC Electrical Improvements Addendum No. 4

PDF, High priority: read this firstamendment
High

MBEC Electrical Improvements Addendum No. 6

PDF, High priority: read this firstamendment
High

MBEC Electrical Improvements Pre-Bid Meeting Report Addendum No. 2

PDF, High priority: read this firstpre-bid-meeting-report
High

Moccasin Bend Environmental Campus Electrical Improvements IFB W-22-010-201

PDF, High priority: read this firstifb
High

W-22-010-201 MBEC Electrical Improvements Addendum No. 7

PDF, High priority: read this firstamendment
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTennessee → City of Chattanooga
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Debbie J Talley

Full Description

Show more
The Project to be bid on is as follows: Interim Milestone Work: replacement of existing primary clarifier equipment, including motors/drives, axles, and other equipment for eight (8) primary clarifier sludge collectors, eight (8) lateral sludge collectors, and eight (8) primary clarifier scum skimmers, associated electrical work, installing VFDs for clarifier equipment, replacing motor control centers for Primary Sludge Pump Buildings Number 1 and 2 and SCADA integration. Substantial Completion Work: upgrading various electrical equipment, including influent relief pump station medium voltage switchgear, influent pump station medium voltage switchgear, wet weather medium voltage switchgear, operations and control building medium voltage switchgear, and associated work.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS