Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on June 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Modernisation du système de traitement d'eau potable et aménagement d'une conciergerie

Closed
20150317International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 11 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

L’appel d’offres porte sur la modernisation du système de traitement de l’eau potable et l’aménagement d’une conciergerie à l’école Sainte-Cécile de Milton, sous la responsabilité du Centre de services scolaire du Val-des-Cerfs. Les travaux comprennent l’installation d’un nouveau système de traitement de l’eau, des excavations, le revêtement asphaltique, le lignage, et le raccordement au puits d’eau potable, ainsi que la réalisation d’un espace de conciergerie. La date limite de dépôt des soumissions est fixée au 2 mars 2026 à 14 h, et toute soumission reçue après ce délai sera automatiquement rejetée. Les soumissions doivent être transmises exclusivement par le Système d’appels d’offres électroniques (SÉAO) et doivent être accompagnées d’une garantie de soumission de 10 % du montant total, émise par une institution financière qualifiée, valable 45 jours après l’ouverture des soumissions. Un modèle de lettre d’engagement doit également être joint pour assurer l’émission d’une garantie d’exécution. Les entrepreneurs doivent détenir la licence requise en vertu de la Loi sur le bâtiment et respecter le Règlement sur les contrats des travaux de construction des organismes publics. La visite sur site est prévue le 17 juin 2026 à 10 h, et les demandes d’informations doivent être soumises avant le 25 février 2026. Les travaux doivent débuter dès que possible et être terminés au plus tard le 28 août 2026, avec une réception avec réserve prévue pour le 23 octobre 2026. Le respect strict des délais est une exigence essentielle, et une clause de pénalité sera appliquée en cas de retard. Le propriétaire se réserve le droit de rejeter toutes les soumissions, même la plus avantageuse.

General Info

Modernize water treatment and concierge area at École Sainte Cécile, Quebec, bids due March 26, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Centre de services scolaire du Val-des-Cerfs.
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Prud'Homme JulieContracting Authority

Full Description

Show more
AVIS D’APPEL D'OFFRES PUBLIC TITRE : 251675 No DOSSIER : MODERNISATION DU SYSTÈME DE TRAITEMENT D'EAU POTABLE ET AMÉNAGEMENT D'UNE CONCIERGERIE Propriétaire Centre de services scolaire du Val-des-Cerfs Julie Prud’Homme 55, rue Court Granby (Québec) J2G 9N6 (adresse municipale) Tél. : +1 (555) 000-0000 poste 60342 contact@example.gov Établissement visé École Sainte Cécile 252 Principale, Sainte-Cécile de Milton(Québec) J0E 2C0 Professionnel architecture BBLA Architectes 1625, Boul. Mercure Drummondville (QC) J2B 3N2 Professionnel ingénierie BWB Consultants 733, Chemin Jean-Adam Piedmont (QC) J0R 1R3 Visite La visite aura lieu le 17 juin 2026 à 10h00 Les personnes qui se présenteront, devront demeurer à l’extérieur jusqu’à l’arrivée du chargé de projet. Travaux visés: Installation d’un nouveau système de traitement de l’eau potable. Équipements de traitement de l’eau potable. Excavation, asphaltage, lignage. Raccordement du puits d’eau potable. Aménagement d’une conciergerie. Échéancier Début des travaux : Dès que possible Fin des travaux : 28 août 2026 Réception des travaux avec réserve : 23 octobre 2026 Option Aucune option Équivalence Les demandes d’équivalence doivent être déposées au plus tard 9 jours avant la date de dépôt des soumissions. Information Les demandes d’informations doivent être adressées à l’adresse suivante : contact@example.gov Les questions seront traitées rapidement et les réponses feront l’objet d’addenda sous la forme de questions /réponses ou de modifications et ajouts aux Documents d’appel d’offres. L’ORGANISME PUBLIC se réserve le droit de ne pas considérer une demande formulée par un fournisseur si cette demande n’est pas transmise moins de 5 jours ouvrables avant la date et l’heure fixées pour la réception des soumissions. Documents Les plans, devis, documents contractuels et autres renseignements pourront être obtenus que par l’intermédiaire du Système d’appels d’offres électroniques (SÉAO) au www.seao.ca Modalité de dépôt des soumissions Enveloppe Les soumissions, dans des enveloppes cachetées et adressées au responsable, seront reçues au siège social du Centre de services scolaire du Val-des-Cerfs, 55, rue Court, à Granby, Québec, jusqu'à 14 h 00, heure en vigueur localement, 26 mars 2026 pour être ouvertes publiquement au même endroit, le même jour et à la même heure. Toute soumission reçue postérieurement sera automatiquement rejetée. Ou Voie électronique Les Soumissions peuvent être transmises par voie électronique. Le cas échéant, cette transmission ne peut être effectuée que par l’intermédiaire du système électronique d'appel d'offres (SEAO), à l'adresse suivante : https://www.seao.ca. Une Soumission transmise par voie électronique doit être déposée (c'est-à-dire chiffrée, transmise, horodatée et sauvegardée sur les serveurs du SEAO) avant la date et l’heure limites fixées pour la réception des Soumissions. Modalité d’ouverture des soumissions Considérant les dernières mises à jour du SCT, l’ORGANISME PUBLIC procède à une ouverture des Soumissions avec public, de sorte que les SOUMISSIONNAIRES pourront y assister en personne. Garantie de soumission Lettre d’engagement Les soumissions doivent être accompagnées d’une garantie de soumission représentant 10 % du montant total de la soumission excluant toutes les taxes applicables, sous forme de lettre de garantie irrévocable ou de cautionnement de soumission émis par une institution financière qui est un assureur détenant un permis émis conformément à la Loi sur les assurances (L.R.Q., c. A-32) l’autorisant à pratiquer l’assurance cautionnement, une société de fiducie titulaire d’un permis délivré en vertu de la Loi sur les sociétés de fiducie et les sociétés d’épargne (L.R.Q., c. S-29-01), une coopérative de services financiers visée par la Loi sur les coopératives de services financiers (L.R.Q., c. C-67.3) ou une banque au sens de la Loi sur les banques (L.C., 1991, c. 46), sans quoi la soumission sera automatiquement rejetée. Cette garantie de soumission sera valide pour une période de 45 jours de la date d'ouverture des soumissions. Le SOUMISSIONNAIRE doit joindre à sa Soumission une lettre d’engagement signée par une caution garantissant l’émission d’une garantie d’exécution et d'une garantie des obligations de l’ENTREPRENEUR pour gages, matériaux et services conformes aux exigences prévues à la partie 4.00 du Contrat. Il doit, pour ce faire, utiliser le modèle de lettre d'engagement reproduit à l'annexe 4.02 du Formulaire de Soumission. Seuls seront considérés aux fins d'octroi du contrat les entrepreneurs détenant, le cas échéant, la licence requise en vertu de la Loi sur le bâtiment (L.R.Q., c. B-1.1). Les entrepreneurs soumissionnaires sont responsables du choix des sous-traitants, de leur solvabilité et du contenu de leurs soumissions. Toutes les soumissions devront être faites conformément aux dispositions du Règlement sur les contrats des travaux de construction des organismes publics (L.R.Q., c. C-65.1, r.5), adopté en vertu de la Loi sur les contrats des organismes publics. Le Propriétaire se réserve le droit de n’accepter ni la plus basse ni aucune des soumissions. NB : Note explicative – Clause de pénalité pour non-respect des délais Dans le cadre du présent appel d’offres, le respect des délais contractuels constitue une exigence essentielle à la bonne réalisation du projet. À cet effet, une clause de pénalité est prévue au contrat afin d’encadrer les conséquences d’un éventuel retard dans l’exécution des travaux. Cette mesure vise à : assurer la rigueur dans la gestion du projet, protéger les intérêts du donneur d’ouvrage public, favoriser l’équité entre les soumissionnaires en établissant des règles claires et prévisibles. Les soumissionnaires sont invités à prendre connaissance de cette clause et à en tenir compte dans l’élaboration de leur proposition, notamment en ce qui concerne la planification des ressources, la gestion des risques et la capacité à respecter les échéanciers.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS