Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on April 5, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Modernization of T-7 Family of Systems

Closed
FA8617-24-R-8XXXFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336412
New
Federal
Fd203062700424 (2995-01-290-1428J)
Solicitation # FD20302700424
The 421st Supply Chain Management Squadron at Tinker Air Force Base is conducting market research via a Sources Sought Synopsis to identify potential manufacturing sources for a Valve Assembly for the F-118 engine, identified by NSN 2995-01-290-1428JU. This effort is intended to determine if the requirement can be competitive or a Small Business Set-Aside under NAICS code 336412. The government is seeking interested parties capable of providing all labor, materials, facilities, and equipment necessary for the manufacture, testing, preservation, packaging, and delivery of completely serviceable units, including the management of supply chains, long-lead parts procurement, and obsolescence issues. To be considered, potential sources must submit a Source Approval Request (SAR) package and a Company Profile to the Oklahoma City Small Business Office. Qualification requires that the company has manufactured the subject or a similar item within the past 36 months for the Department of Defense or the Original Equipment Manufacturer. Essential requirements include a valid Quality Assurance Certificate such as ISO 9001, AS9100, or NATO AQAP-2070, and the ability to provide detailed Process Operation Sheets and Inspection Method Sheets. Interested businesses of all sizes and socioeconomic categories are encouraged to respond with their company details, CAGE code, and documentation of their capabilities. This notice is for planning purposes only; no solicitation is currently available, and no funds have been allocated at this time.
Ok DLA Aviation At Oklahoma City

POSTED

about 12 hours ago

DEADLINE

in 10 days
NAICS: 336412
New
Federal
Igniter, Spark Gas T (3D)
Solicitation # SPRTA127R0103
Solicitation SPRTA127R0103 is a request for proposal issued by the Defense Logistics Agency Weapons Support for the procurement of 159 Gas Turbine Spark Igniters (NSN 2925015034385RV, Part Number 9045600-1) for TF33 engines. These steel components are designated as Critical Safety Items and are used to provide high voltage, high energy pulses to ignite fuel in the combustion section of the engine. The government is seeking firm unit prices for a quantity range between 40 and 239 units, with delivery expected to begin as early as July 31, 2028, at a rate of 10 units per month. The procurement is intended as a limited source action under FAR 6.302, identifying Unison Industries, LLC as a qualified source. The contract mandates strict adherence to quality and safety standards, requiring ISO 9001:2000 certification and Higher Level Contract Quality Requirements. Deliverables must comply with MIL-STD-2073-1 for packaging, MIL-STD-129 for marking, and MIL-STD-130 for Item Unique Identification (IUID). Additionally, all wood packaging materials must be heat-treated and certified per ISPM 15 and ALSC standards. Inspection and acceptance will occur at the point of origin, with shipping terms set as FOB Origin. Proposals are due by November 20, 2026, and will be evaluated based on a combination of price and past performance.
Ok DLA Aviation At Oklahoma City

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 336412
New
DIBBS
COVER ASSEMBLY, METE
Solicitation # SPE4A7-27-T-1569
Solicitation SPE4A7-27-T-1569 is a fixed-price procurement issued by the Defense Logistics Agency for five units of Cover Assembly, Mete, identified by NSN 2915011735343. This procurement is designated as an Air Force Critical Safety Item and requires production in accordance with TDP Rev A Gen 8 and reference drawing NR 13873 EI-011735343. The delivery timeline for the primary items is 263 days, with an FOB Origin designation for both inspection and acceptance. A critical requirement of this contract is the First Article Test, which requires the delivery of three units to Tinker Air Force Base within 30 calendar days of the contract date for government testing. The contractor must maintain a quality management system compliant with SAE AS9100 and adhere to strict sampling methods, including zero-based sampling plans. Packaging must comply with ASTM D3951 and MIL-STD-129, and all payment requests must be processed through Wide Area WorkFlow. Offerors must comply with domestic material restrictions, including the Buy American Act and the Berry Amendment, and are prohibited from using additive manufacturing processes unless specifically authorized. The solicitation also mandates compliance with CMMC Level 2 self-assessment and DFARS cybersecurity reporting requirements. Small business joint ventures must provide specific socioeconomic representations, and all offerors must certify they will not provide covered telecommunications equipment or services.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

1 day ago

DEADLINE

in 7 days
NAICS: 336412
New
DIBBS
ADAPTER, INPUT, CONTR
Solicitation # SPE4A7-27-R-X044
Solicitation SPE4A7-27-R-X044 is an Indefinite Delivery Contract issued by the DLA Weapons Support ASC Supplier Oper AE and AF Div for the procurement of an Engine Control Input Assembly Adapter (NSN 1560-01-101-9743). This is a total small business set-aside for a Navy-identified Critical Safety Item. The contract requires a total delivery period of 780 days after receipt of order, which includes specific timelines for production, government production lot testing evaluation, and final delivery to MCAS Cherry Point, North Carolina. The award will be based on a best-value trade-off assessment, with significant weight placed on past performance, specifically SPRS assessments and historical quality and delivery compliance. The contractor must adhere to stringent quality and security standards, including CMMC Level 2 certification and compliance with ITAR and EAR export controls. Technical data access is restricted to approved US/Canada Joint Certification Program participants. Packaging and marking must strictly follow MIL-STD-129 and MIL-STD-130 for unique item identification. Inspection occurs at the source, while acceptance is at the destination. Payment and invoicing are processed through the Wide Area Workflow (WAWF) system. Offerors must submit quotes via email and maintain active registration in the System for Award Management.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

1 day ago

DEADLINE

in 13 days

General Info

NAICS

336412 - Aircraft Engine and Engine Parts Manufacturing

Place of Performance

Wright Patterson AFB, OH, USA

Set-Aside

NONE

Documents

3

PVI Addendum

PDF, High priority: read this first1 page · sow
High

T-7A Block 10 Upgrade System Requirements Document (High Mach and Terrain Avoidance)

PDF, High priority: read this firstspecifications
High

T-7 Family of Systems Sources Sought Notice

PDF, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8617 Aflcmc Wndi/wnb Trng Arcrft
Contacts2 people available
OfficeWRIGHT PATTERSON AFB, OH, 45433-7211, USA
Office AddressWRIGHT PATTERSON AFB, OH, 45433-7211, USA
Contacts
Sonia Johnston
Joshua Potter

Full Description

Show more
Description THIS IS NOT A REQUEST FOR PROPOSAL/QUOTE. This synopsis is not to be construed as a commitment on the part of the Government to award a contract, nor will the Government provide reimbursement of cost associated with any information, documentation, or responses submitted as a result of this synopsis. This is a Sources Sought Synopsis; there is no solicitation available at this time. This Sources Sought Synopsis is published for market research purposes only and is intended to identify potential sources. Your response will be treated as information only and will not be used as a proposal. Any resulting contract effort will be subject to Federal Acquisition Regulation (FAR) 52.232-18, Availability of Funds. The information in this notice is based on current information available to date. This information is subject to change and is not binding on the Government. Any updated information will be provided in future announcements and posted electronically on www.sam.gov. This Sources Sought Synopsis addresses a range of potential modifications to the T-7 family of systems beginning as early as 2025. For the purposes of this document the T-7 family of systems includes the T-7 air vehicle, Ground Based Training System (GBTS), and associated systems. GBTS is defined as all Aircrew Training Devices (ATD), Ground Training Devices (GTD), other training system components, GBTS Support Equipment, academics, and Interactive Multimedia Instruction (IMI). The T-7 family of systems was initially envisioned as the Advanced Pilot Training Program, an inclusive training solution meant to replace the aging T-38C fleet in Air Force inventory used for pilot training purposes. It was determined through a competitive source selection that bespoke development of a purpose-built, single-engine, high-performance jet aircraft, matching ground based training system, support equipment, required courseware, and other necessary systems best supported the needs of the Air Force, and would equip Air Education and Training Command with the ability to train pilots well into the 21st century. Eventually the T-7 program will consist of 351+ aircraft operating out of five training bases across the continental United States, co-located with required ground training and support equipment. The T-7 is currently in the Engineering and Manufacturing Development phase of the acquisition lifecycle. Although the T-7 has not yet been fielded, initial requirements were codified more than five years before the drafting of this document, and unforeseen needs require modifications to the T-7 family of systems to ensure it is able to train generations of pilots into the future. All potential requirements identified in this document will involve military certification requirements. Supporting tasks may be executed at Government facilities, contractor facilities, Continental United States operational bases, and/or test locations. While not inclusive, these potential requirements involve: Modification/upgrade/configuration management support Design, functional and physical certification, and integration of hardware and software modifications into the T-7 family of systems which includes the T-7A aircraft, GBTS, Support Equipment (SE)/Test Measurement and Diagnostic Equipment (TMDE), training, technical data, and aircraft equipment necessary to meet specification requirements'to include kit production, and installation. Examples of modifications the Government may implement in the future could include, but would not be limited to: Implementing High Mach and Terrain Avoidance into the T-7A. See attached draft Systems Requirements Document. Integrating net arrestor (BAK-15 and M1A1) system compatibility into the T-7A aircraft, and high speed rollover of BAK-12/deployed BAK-14 barriers. This effort would consist of analysis to determine aircraft capability with existing net barrier systems and rollover of deployed cable arresting systems, and limited modification to aircraft to ensure compatibility, if required. Increasing T-7A aircraft endurance via internal fuel tank modification to take advantage of current unused capacity. Implementing Pilot Vehicle Interface upgrades to fully meet 4th/5th generation training needs. See attached PVI Addendum. Implementing a G-limit mode that prevents student pilots from performing maneuvers that generate G-forces over a defined value. Due to the T-7's high performance and G-level capability combined with use for initial training, a pilot-selectable G-limiter is desired with the ability to restrict inexperienced students to a lower G-capable aircraft. This feature will allow a selectable function so increased G-load can be presented to the student as experience is gained. Upgrade T-7 navigation capability from Inertial Measurement Unit (IMU) with Global Position System (GPS) updates to an Embedded GPS and Inertial Navigation Unit (INU) [EGI] with a ring-laser gyro. Integration of Military Type Certification requirements, Airworthiness Directives (to include retrofits and support for maintenance of airworthiness certification compliance). Support for aircraft and training system concurrency and modification, instruction (as required), and maintenance. General sustainment and maintenance support for modification efforts All necessary activities to ensure modifications are supported and sustained in a manner consistent with current planned APT program objectives. This includes but would not be limited to the activities below: Crisis management team support'to include technical evaluation and mishap investigation (as required). Maintenance of reliability databases, failure reporting, and analysis and corrective action system support. Interim contract support to include repair, maintenance, and inventory management/data management tracking for modernization efforts (per Air Force Instruction 63-101, Chapter 3). Mission capable support. Technical data management, sustainment, and modification. Diminishing manufacturing sources and material shortages support for modification efforts. Product Improvement Working Group support. Fleet management support (e.g., alignment/scheduling of aircraft modifications and updates to planned A-/C-check cycles and operational requirements, technical order updates, and fleet status reporting). Management, repair, and distribution of common and peculiar support equipment. Hardware procurement (e.g., spares, support equipment). Delivery of data necessary for government purpose rights to incorporate modifications/changes into the T-7 family of systems. Engineering and technical support for modification efforts Sustaining engineering support (e.g., engineering dispositions; Operational Safety, Suitability and Effectiveness support; deficiency report evaluation, tracking, and correction; onsite depot support; and reliability and maintainability analyses, tracking and correction). Software engineering to include development and maintenance, training, depot software sustainment support, and problem identification and prioritization. System Safety Management Program support, safety analysis & risk assessments. Environmental, safety, and occupational health hazard risk tracking (i.e., MIL-STD-881C). Aircraft damage and repair assessment. Weapon system integrity program support. Corrosion program support. Engineering lab capability, to include failure analysis of parts and materials. Aero and stress analysis. Flight simulation and other modeling. Quality assurance. Cybersecurity Test for modification efforts Laboratory, ground, and flight test operations and support'to include test planning, modeling, provision of test support assets, instrumentation, execution, data analysis, and report generation. Flight test facility scheduling, use, maintenance and augmentation support. Government and contractor flight test personnel qualification and certification training and support (to include but not limited to aircrew, test directors, test engineers, system engineers, and instrumentation support personnel). Studies and Analyses for modification efforts Perform studies and analyses related to the implementation of modifications onto the T-7 family of systems. The T-7A Program Office is surveying the market to determine if sources are qualified to perform any or all of the aforementioned requirements. Interested firms shall submit information (limit to 20 8.5x11 pages - 12 point font, single-spaced, 1 margins) to permit assessment of technical capabilities in writing or electronically to Air Force Life Cycle Management Center, AFLCMC/WLZ, ATTN: Sonia Johnston, 1970 Monahan Way, Building 11A, Wright-Patterson AFB, OH 45433-7142. NOTE: Oral submissions of information are not acceptable. If there are any questions, please contact Sonia Johnston, Contract Specialist, AFLCMC/WLZ, e-mail: sonia.johnston@us.af.mil or Joshua Potter, Contracting Officer, AFLCMC/WLZ, e-mail: joshua.potter.5@us.af.mil. The capabilities assertion summary should be brief and concise, yet clearly demonstrate an ability to individually meet the stated requirements above. Respondents shall address each of the following: Your company's past experience on previous efforts of similar complexity concerning relevant projects. The minimum data requirements (e.g., engineering drawings, parts list, and/or technical orders) and additional Government support required to address each of the requirements outlined in the assertion summary. How efforts will be installed/integrated onto existing or production T-7 aircraft, and describe additional government support/facilities that would be necessary to install modifications to T-7 Aircraft/systems. Rough schedule estimate outlining how long it would take to develop prospective modifications to a state ready for fleetwide installation. Teaming and/or subcontracting arrangements should be clearly delineated and previous experience in teaming must be provided. If a company or team is capable of some, but not all of the aforementioned requirements, please provide a response that explains the specific requirements for which you are capable. Firms responding to this announcement should indicate whether they are a large business, other than small business, small business, Small Disadvantaged Business (SDB), Woman-Owned Small Business (WOSB), Economically Disadvantaged Women-Owned Small Business (EDWOSB), 8(a)-certified business, Service-Disabled Veteran-Owned Small Business (SDVOSB), Veteran-Owned Small Business (VOSB), or Historically Underutilized Business Zone (HUBZone) small business. All prospective contractors shall be registered in the System for Award Management (SAM) database to be awarded a DoD contract. Note that the NAICS code for this requirement, if applicable to the company's capabilities, should be included in the company's NAICS code listing in SAM (www.sam.gov). The acquisition strategy has not yet been determined. Market research results will assist the Air Force in determining whether this requirement will be a full and open, a small business (or other socioeconomic) set aside, or a sole source acquisition. NOTE: If there is sufficient demonstrated interest and capability among small business contractors, a key factor in determining if an acquisition will be a Small Business Set-Aside is that two or more potential small business prime contractors must be capable of performing at least 50% of the effort, as defined in FAR clause 52.219-14, Limitations on Subcontracting. If it is determined that a Small Business Set-Aside is appropriate and your company anticipates submitting a proposal as the prime contractor for a Small Business Set-Aside, please provide specific details and rationale as to how compliance with FAR clause 52.219-14 would be achieved, including specific details regarding teaming arrangements. If subcontracts are to be used, provide anticipated percentage of effort to be subcontracted and whether small or large businesses will be used. Teaming and/or subcontracting arrangements should be clearly delineated and previous experience in teaming must be provided. Request that large and small businesses provide a reasonable expectation for small business utilization as an approximate percentage. Please provide supporting rationale for the recommended percentage. It is anticipated that appropriate security classifications for personnel and facilities will be required up to the Secret level to address requirements. Appropriate security requirements will be required before contract award. RESPONSES ARE DUE NO LATER THAN 6 MAY, 2024. Point of Contact Sonia Johnston Contract Specialist sonia.johnston@us.af.mil Secondary Point of Contact Joshua Potter Contracting Officer joshua.potter.5@us.af.mil

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS