Modoc Wildland Interface Fuels Reduction Project - Phase 1 Fort Bidwell Electrical Substation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves hazardous fuels reduction and vegetation management on approximately 27 acres of Tribal and non-Tribal lands surrounding the Fort Bidwell Electrical Substation in Modoc County, California. Activities include manual and mechanical thinning, mastication, chipping, and limited pile burning to reduce combustible vegetative fuels, improve defensible space, and enhance wildfire resilience around the critical electrical infrastructure. No grading, excavation, or new construction is planned. All work will adhere to best management practices designed to prevent erosion and protect biological, cultural, and water resources. The project is classified under CEQA Guidelines Section 15304, Class 4, as a categorical exemption for minor alterations to land and vegetation, with compliance supported by references to multiple sections of the Public Resources Code. The work will occur on-site at Lot 1, Section 20, T46N, R16E, SW¼NW¼ Section 20, Mount Diablo Meridian, along County Road 1 near Fort Bidwell. The Modoc Resource Conservation District is the lead agency and applicant, with Michael Colbert listed as the primary point of contact for project inquiries. There is no designated solicitation number, contract value, or detailed pricing structure provided in the documentation, and no formal contract clauses from the Federal Acquisition Regulation (FAR) are referenced or included. The procurement process lacks identified evaluation factors, award methodology, or specified contract type, and there are no details on payment offices, accounting codes, invoicing systems, or contracting officer roles. While the project has met environmental exemption requirements under CEQA with a certified exemption notice filed on November 1, 2025, the documentation does not contain any representations, certifications, or socioeconomic disclosures typically required in federal contracting. The delivery and performance location is clearly defined as the substation site, with all inspection and acceptance expected to occur on-site. Submission of required documentation must be made in hard-copy form to the Office of Planning and Research in Sacramento, with no electronic submissions permitted, and no period of performance or delivery schedule has been specified.
General Info
Agency
NAICS
Place of Performance
County Road 1, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
