Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the fabrication and delivery of a single, factory-assembled, prefabricated modular control building for the City of Piqua, Ohio. The building must measure 25 feet 4 inches by 14 feet 6 inches and be constructed using either concrete or double-walled steel. The manufacturer is responsible for integrating all necessary mechanical and electrical systems, including grounding and cable trays, while ensuring full compliance with ACI, AISC/AISI, and NEMA standards. The project is categorized under NAICS code 332311 and requires the delivery of one fully assembled unit to the designated substation project site. Interested parties must submit their responses by the deadline of October 28, 2026.

General Info

Documents

This scope was carved out of 24-17.9A.

The full solicitation package (15 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

24-17.9A

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → City of Piqua
ContactsNo contacts available
OfficeN/A
Organization / AgencyOhio → City of Piqua
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies a factory-assembled, prefabricated, modular, self-contained control building for prime contractors on City of Piqua, Ohio substation projects. Fabricates a 25'-4" x 14'-6" building using steel double-walled or concrete construction, integrating all electrical and mechanical systems, cable trays, and grounding. Must meet ACI, AISC/AISI, and NEMA standards. Delivers one fully assembled and shipped control building.

Similar Contracts

Same NAICS industry code

NAICS: 332311
New
Federal
Solicitation_S-280C/G Vehicle Mounted Shelter
Solicitation # W912CH-26-R-A096
The Army Contracting Command - Detroit Arsenal is soliciting proposals for a five-year, Firm-Fixed-Price, Indefinite Delivery/Indefinite Quantity contract for the manufacture and delivery of four variants of the S-280C/G Vehicle Mounted Shelter. These lightweight tactical shelters, available in shielded and unshielded versions with or without mobilizer adapter kits, are designed to protect personnel and sensitive electronic equipment from demanding field environments and electromagnetic interference. The contract has a minimum guaranteed value of $100,000 and a maximum ceiling of $4,000,000. This is a 100% Small Business Set-Aside under NAICS 332311, with award based on a best-value tradeoff between technical factors, specifically EMI shielding design and manufacturing processes, and price. The scope of work includes First Article Testing, full-scale production, and the delivery of associated technical and logistics data, including operator manuals and provisioning parts lists. Manufacturing must strictly adhere to the Government-owned Technical Data Package and ASTM E1975-22 standards. Due to the export-controlled nature of the technical data, offerors must have a valid DD Form 2345 on file. Deliveries are FOB Destination, with an estimated distribution of 75 percent to CONUS locations, such as the Sierra Army Depot, and 25 percent to OCONUS locations including Germany, Korea, or Japan. Proposals must be submitted electronically by October 30, 2026.
W6QK Acc- Dta

POSTED

about 5 hours ago

DEADLINE

in 10 days
View Details

More opportunities from Ohio → City of Piqua

Same awarding agency

NAICS: 238110
New
SLED
24-17.12
Solicitation # 24-17.12
The City of Piqua, Ohio, is soliciting bids for Project 24-17.12, which involves the construction of cast-in-place drilled pier foundations for transmission line structures as part of the Washington/Farrington Road T-Line project. The scope of work includes furnishing all labor, materials, and equipment to install seven drilled pier foundations for self-supporting steel poles, consisting of five 70-foot, one 71-foot, and one 80-foot pier. The engineer's estimate for this work is $280,000. Bids are due by 1:00 PM on October 19, 2026, and must be submitted as hard copies in sealed envelopes. The award will be based on the lowest and best bid, considering relative merits, technical specifications, and the bidder's qualifications. Contractors must adhere to State of Ohio Prevailing Wage laws and provide certified payroll reports. Financial security requirements include a bid bond or certified check for 10% of the total bid amount, as well as performance and payment bonds equal to the full contract price upon award. Technical compliance is strictly monitored, with specific tolerances for pier center location, elevation, verticality, and anchor bolt alignment. Concrete strength must reach 75% of the design compressive strength before structures are erected. Payment is processed monthly, with 90% of equipment costs due upon delivery and the final 10% due upon system energization and acceptance. Performance penalties of $500 per calendar day apply for delays beyond the certified delivery date.
Poured Concrete Foundation and Structure Contractors

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The project scope includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through Pole P18, the installation of all-dielectric self-supporting fiber optic cable along the entire length, and the placement of various steel and ductile iron poles. The engineer's estimate for the work is $1,900,000. Bids will be awarded based on the lowest and best bid, with a strong emphasis on the bidder's financial standing, performance experience, and ability to complete the work in the shortest time possible. Bidders must provide a bid bond of 10% of the total bid amount, and the successful contractor will be required to post a combined performance-payment bond for 100% of the contract value. Compliance with State of Ohio Prevailing Wage laws, the National Electric Safety Code, and the Americans with Disabilities Act is mandatory. Contract administration is managed through the Office of the Architect-Engineer, with payments processed monthly. Equipment payments are structured at 90% upon delivery F.O.B. to the City of Piqua and the remaining 10% upon satisfactory energizing and acceptance of the system. All deliveries must be coordinated 48 hours in advance, and shipments in enclosed trailers will be refused. Bids must be submitted in duplicate via Bid Express, email, or sealed hard copy by the specified deadline.
Power and Communication Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS