Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Module 4 LFG GCCS Expansion

Closed
757-7526-02State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
Lytton First Nation – Berm Construction
Solicitation # 24-3028C
Solicitation 24-3028C is for the construction of the Nohomeen Recovery Berm located at the Stein Subdivision in Stryen, Lytton, British Columbia, for the Lytton First Nation. The project involves significant earthworks and the installation of a retaining wall using lock block facing units with a minimum 28-day concrete strength of 20 MPa and a specific batter of 5 degrees. Key technical requirements include the use of Type I Engineered Fill and retained backfill, both compacted to 100 percent of the maximum density per ASTM D698 standards. The scope also includes the installation of 150mm perforated PVC toe and heel drains, vertical cleanouts, rodent guards, and a clear crush chimney drain, with NILEX 4545 non-woven geotextile required at soil interfaces. The project mandates strict environmental and cultural compliance, requiring adherence to Thompson-NOXLAND Regional District Bylaws and Department of Fisheries and Oceans Land Development Guidelines. Contractors must install silt fencing prior to excavation and ensure all soil removal is conducted by a company employing a qualified cultural assist. Quality assurance is managed through the Geotechnical Engineer of Record, who must approve the subgrade and wall bearing surface before wall construction begins. Additionally, the contractor is responsible for verifying wall batter every block course and limiting the use of heavy equipment to a minimum distance of 0.75 meters from the wall face. Responses to this solicitation are due by October 22, 2026.
Lytton First Nation

POSTED

2 days ago

DEADLINE

in 18 days
NAICS: 237990
New
SLED
Contract 26-2 Furnace Creek Tank Painting
Solicitation # Contract 26-2
The Womelsdorf-Robesonia Joint Authority is soliciting sealed bids for Contract 26-2, which involves the interior and exterior painting of the Furnace Creek Tank, a 1,500,000-gallon welded steel ground water storage tank measuring 68 feet in diameter and 56 feet in height. The scope of work includes foundation joint and crack repair, incidental weld repairs, and coordination with the contractor awarded Contract 26-1 for metals rehabilitation. All work must be completed within 150 days from the Notice to Proceed and is subject to oversight by a retained third-party paint inspector. Bids must be submitted electronically via the PennBid program by 2:00 PM on October 21, 2026, and must include a bid bond or certified check for 10 percent of the bid price along with required financial statements, experience records, and various certifications. This project is funded through a Penn VEST Drinking Water State Revolving Fund loan and must comply with all associated loan requirements. It is strictly subject to the Build America, Buy America Act and the Federal Consolidated Appropriations Act, requiring that all iron, steel, manufactured products, and construction materials be produced in the United States. Additionally, the contract mandates adherence to Davis-Bacon Wage Rates and requires specific certifications regarding non-discrimination, equal employment opportunity, and contractor eligibility. The Authority reserves the right to award the contract to the bidder deemed to have provided the most advantageous bid.
Berks County

POSTED

3 days ago

DEADLINE

in 17 days
NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio, with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of conduits, structures, concrete drive aprons with curbs, seeding, mulching, and a design-build electrical component. The electrical portion requires the contractor to design and build the electrical service and associated conductors, including the installation of 22 decorative light fixtures, light pole bases, and specific connector kits. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion date set for September 30, 2027. Bids are submitted as unit price proposals via Bid Express, with a final response deadline of October 13, 2026. The selection process evaluates the lowest and best bid based on project history, available resources, financial ability, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and OSHA regulations. Required financial securities include a bid bond for the full amount of the bid or a 10 percent certified check, and a 100 percent performance bond upon award. Insurance requirements specify minimum coverage of $2,000,000 for Commercial General Liability, $1,000,000 for Auto, and $1,000,000 for Workers Compensation. Contract administration is managed by Oberer Construction Managers Ltd. on behalf of the City.
City of Centerville

POSTED

3 days ago

DEADLINE

in 8 days
NAICS: 237990
New
SLED
Pierpont Nuisance Sand Removal
Solicitation # P-130000901
The City of San Buenaventura is soliciting proposals for solicitation number P-130000901 to perform nuisance sand removal from City-owned portions of Pierpont Beach between San Pedro Lane and Greenock Lane. This recurring project occurs twice annually, once in May and once in November, to satisfy a legal Settlement Agreement. The scope of work involves grading, removing, and hauling excess beach sand from up to 27 beach access lanes and the frontage of up to 17 private properties. Contractors must excavate sand wedges to specified limits, ensuring they remain no deeper than 6 inches above structural footings with a slope no more than 1:1.75, and transport the material to designated deposit sites while avoiding the tidal zone. Proposals are due by October 20, 2026, at 4:00 PM PST, and must be submitted as a sealed hard copy to the Purchasing and Contracts Division in Ventura, California. The City will award the contract based on the perceived best fit and best value, evaluating proposals on a scale of 0.0 to 15.0. Key requirements include compliance with Cal-OSHA safety standards, the California Manual on Uniform Traffic Control Devices, and a Biological Resource Assessment. Additionally, state prevailing wages for Ventura County apply to all workers. While a faithful performance bond is not required, a bid security of at least 10 percent may be requested, and a 5 percent credit is available for qualified Small Local Businesses.
City of San Buenaventura

POSTED

3 days ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The Module 4 Landfill Gas Collection System Expansion project, solicitation number 757-7526-02, is a public works contract issued by the County of Butte for the Neal Road Recycling and Waste Facility in California. The scope of work involves the installation of vertical gas collection wells, wellheads, headers, laterals, piping connections, valving, and pipe supports. All work must be performed in accordance with the California Department of Transportation 2025 Standard Specifications and Standard Plans, as well as the project's specific special provisions. The contractor is responsible for providing all labor, tools, materials, and equipment necessary for completion, including specific deliverables such as 487 linear feet of extraction wells and various HDPE piping installations. Bids are due by September 8, 2026, and must be submitted in sealed envelopes. Eligible bidders must demonstrate financial responsibility and experience, and provide bidder's security of at least ten percent of the total bid. The successful contractor will be required to furnish payment and performance bonds equal to 100 percent of the total bid amount and provide proof of workers' compensation insurance. Work must commence within 15 calendar days of the contract signing. Payment will be administered by the County Auditor through monthly progress estimates, with final payment released 35 days after the recording of the Notice of Completion. Quality is managed through a Quality Assurance Program, requiring strict adherence to horizontal and vertical installation tolerances and successful pressure testing of HDPE pipelines.

General Info

Butte County project for installing gas collection wells at Neal Road Waste Facility.

Documents

3

Addendum No. 1 - Module 4 LFG GCCS Expansion (BCPW 757-7526-02)

PDF, High priority: read this firstamendment
High

Module 4 Landfill Gas Collection System Expansion - LFG GCCS Expansion 2026 Bid Package

PDF, High priority: read this firstifb
High

Module 4 LFG GCCS Expansion 2026 - Project No. 757-7526-02

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Sep 15, 2026 to Sep 8, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → County of Butte - Public Works
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The work, located at the Neal Road Recycling and Waste Facility in Butte County, in general consists of installation of vertical gas collection wells, associated wellheads, headers, and laterals, piping connections, valving, and pipe supports, all in conformance with the California Department of Transportation 2025 Standard Specifications, and these Special Provisions, unless specified herein. All work shall include furnishing all labor, tools, materials, equipment, and incidentals necessary to complete the project as shown on the plans, as described in the Special Provisions, or as directed by the Engineer.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS