Mohican Campground Campsites & Dumpstation Improvements

Closed
https://dam.assets.ohio.gov/image/upload/ofcc.ohio.gov/Project_Opportunities/RFQs/2026/RFQ-DNR-270078-AE.pdfState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 9 hours ago

DEADLINE

in 17 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 9 hours ago

DEADLINE

in 16 days
NAICS: 541330
New
SLED
Design / Engineering for Microgrid System and DC fast charger
Solicitation # PE-64458-NONST-2027-000000037
The City of Decatur is seeking qualified professional engineering services for the design, bid assistance, and construction administration of a microgrid system and DC fast charger at the Decatur Police Department located at 420 West Trinity Place, Georgia. The project involves integrating a solar photovoltaic generation system and battery energy storage system designed to optimize renewable energy and peak demand management during normal grid-connected operations, while ensuring critical loads remain operational during emergency grid-islanded conditions. The selected consultant will provide a complete set of design plans for bidding and support the project through installation, commissioning, testing, and interconnection with Georgia Power. This solicitation, posted on September 11, 2026, requires proposals to be submitted by October 13, 2026. Funding is provided by the City and a Department of Energy grant, necessitating strict compliance with Build America, Buy America (BABA) requirements and federal regulations. Awarded consultants must maintain an umbrella insurance policy of at least 5 million dollars and adhere to comprehensive non-discrimination and civil rights policies. Evaluation is based on a 100-point weighted system, and the project is expected to begin in November following the award and coordination with Georgia Power. Payment will be made monthly upon the submission of invoices and narrative progress reports to the City Manager.
City of Decatur

POSTED

about 22 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Ohio Department of Natural Resources is seeking Statements of Qualifications from professional design firms to provide engineering, design, and construction administration services for infrastructure upgrades at Mohican State Park. The project focuses on modernizing campground facilities, including the installation of 50-amp electrical service, potable water and sanitary sewer hookups, stormwater improvements, and enhancements to the dump station and roadway pavement. The selected consultant will be responsible for a comprehensive evaluation of existing utilities and must ensure all designs align with master planning recommendations and accessibility standards such as ADA and ICC A117.1. The scope of services includes program verification, obtaining necessary regulatory permits from agencies like the USACE and OEPA, and providing ongoing construction administration with at least eight hours of on-site presence weekly. Firms must be experienced in managing projects within occupied state parks and be familiar with State of Ohio standard forms and ODNR design guidelines. The project emphasizes phased construction to maintain maximum campground occupancy and requires the consultant to manage cost estimates and constructability reviews throughout the design and construction phases.

General Info

ODNR seeks design firms for Mohican State Park campground infrastructure and utility upgrades.

Agency

Ohio Department of Natural ResourcesView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Not specified

Set-Aside

NONE

Documents

(1)

RFQ-DNR-270078-AE.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio Department of Natural Resources
Contacts1 person available
OfficeN/A
Organization / Agency
Ohio Department of Natural Resources
View Agency Profile
Office AddressN/A
Contacts
Division of EngineeringSubmission Recipient

Full Description

Show more
Project number: DNR-270078
The Ohio Department of Natural Resources (ODNR) manages campgrounds at 76 State Parks statewide with over 8,970 campsites. Since 2015, ODNR has been upgrading campground infrastructure to meet modern standards for full-service campsites. Mohican State Park requires upgrades to provide 50-amp electrical service, potable water hookups, sanitary sewer hookups, improved dump station function, stormwater upgrades, and site infrastructure enhancements. ODNR is requesting Statements of Qualifications (SOQ) from professional design firms interested in providing design, engineering, and construction administration services for utility and infrastructure improvements at the Mohican State Park Campgrounds. This project is part of ODNR’s ongoing efforts to modernize campground facilities statewide. The project includes full professional design and construction administration services for utility and site improvements within Mohican State Park’s campground areas. The design consultant will perform a comprehensive evaluation of existing utilities, including water distribution systems, sanitary sewer lines, wastewater disposal systems, storm drainage systems, electrical service distribution, and existing roadway or pavement conditions. The project will deliver designs for upgrades to the existing campground dump station and select campsites, including utility service additions, electrical-only upgrades at certain locations, parking pad expansions, regrading for proper drainage, stormwater improvements, and roadway resurfacing or reconstruction as required. Infrastructure improvements must be sized and aligned with master planning recommendations to ensure sustainability and future growth. Phased construction efforts to maintain maximum possible occupancy levels need to be considered throughout the design process. As scope and associated costs are solidified, projects of similar types, scope and budget may be added or removed as ODNR initiatives and funding allow. While ODNR anticipates centralized services from the selected Consultant at the ODNR Fountain Square complex at 2045 Morse Road, Columbus, Ohio 43229, travel will be necessary to complete the services. For the purposes of scoring proximity to project site, the ODNR Fountain Square complex will be considered the project site.
Scope of Services: Request for Qualifications (Registered Design Professional*) State of Ohio Standard Forms and Documents The project scope will be evaluated, prioritized, and reconciled with existing master plans, beginning with the confirmation of facility and site assessments. Evaluation of the project construction schedule will also be part of the Program Verification stage. Upon award of the Agreement, the selected firm will commence by developing the Program Verification. The selected firm shall apply for and obtain all necessary regulatory permits, maintain current estimates of probable construction costs through the design phase, and provide construction administration services. Permitting and/or coordination with United States Army Corps of Engineers (USACE), United States Fish and Wildlife Service (USFWS), ODNR Dam Safety Program, ODNR Division of Wildlife, Ohio Environmental Protection Agency (OEPA), State Historic Preservation Office (SHPO), and the local floodplain administrators will be required. The selected firm will provide the engineering analysis and calculations needed to advance the design, including structural, geotechnical, and hydraulics engineering. All design and construction shall comply with the current editions of all applicable national, state, and local codes, as well as accessibility standards, including ADA, ICC A117.1, and the ABA Outdoor Developed Areas Guidelines. The Ohio Department of Natural Resources Division of Engineering has developed a set of design guidelines for construction projects. It is expected that all architects, engineers, consultants, and contractors will be familiar with these design guidelines which will serve as the preference for all construction projects when developing final project specifications. A complete set of current guidelines are available at Design Guidelines for Construction Projects | Ohio Department of Natural Resources. (https://ohiodnr.gov/business-and-industry/services-to-business-industry/design-guidelines-all). The selected Construction Manager at Risk (“CM”), as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement detailed cost components, to address the Owner’s project requirements and refine the project schedule. Participate in the Encouraging Diversity, Growth & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: provide constructability review comments on documents produced by the A/E during the Schematic Design, Design Development, and Construction Document stages; develop and maintain estimates of probable construction cost, value engineering, project schedules, and construction schedules; lead and manage the Subcontractor Prequalification and Bidding process, Construction and Closeout Stage. Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov. During the construction period, provide not less than 8 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ: 1. Experience with similar scope (campgrounds, dump stations). 2. Experience with environmental permitting and cultural resources assessment services. 3. Ability to manage design and construction projects in an occupied State Park setting. 4. Experience coordinating with USACE. 5. Experience with subsurface utility assessments. 6. Ability to design project scope within budget in current market conditions with regional cost factors. 7. Experience with construction cost-estimating/analysis for natural resource facilities. 8. Experience managing the State of Ohio contract documents and OAKS CI. 9. Experience with ODNR Capital improvement projects. 10. Experience with Master Planning and future needs planning. Request for Qualifications (Registered Design Professional*) State of Ohio Standard Forms and Documents

More opportunities from Ohio Department of Natural Resources

Same awarding agency

NAICS: 541330
SLED
Kelleys Island Campground Showerhouse Replacement
Solicitation # DNR-270075
The Ohio Department of Natural Resources is seeking a Registered Design Professional team to provide professional design and construction administration services for the Kelleys Island Campground Showerhouse Replacement project. This initiative is part of an ongoing campground improvement program and involves the construction of a centrally located, ADA-compliant shower house featuring a family restroom and laundry area, the demolition of two existing shower houses, and the potential renovation or replacement of existing campground restrooms. The scope of work includes comprehensive engineering analysis in structural, geotechnical, and hydraulics disciplines, as well as investigations into existing utilities and infrastructure such as water, sewer, storm drainage, electric, and paving. Due to the age of the structures slated for demolition, a hazardous materials assessment is required. The selected firm will be responsible for a full suite of services, including program verification, schematic design, design development, construction document preparation, cost estimating, and permitting. Coordination with multiple regulatory agencies, such as the USACE, USFWS, OEPA, and SHPO, is mandatory. Because the campground must remain operational during construction, the design must ensure existing facilities remain functional, and the firm must account for the logistical constraints of an island location. During the construction phase, the firm is required to provide at least 12 hours of on-site administration services per week. Evaluation for this contract will be based on a best-value selection process considering experience with similar projects, knowledge of Ohio capital improvements, firm size, and previous team collaboration. Participation in the EDGE program is required, and all work must adhere to ODNR design guidelines and applicable national, state, and local accessibility and building codes.
Engineering Services

POSTED

10 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS