Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Mokelumne River Fish Hatchery Electrical Retrofit Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

N. McIntire / Baker Road in Clements, CA, 95227

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → East Bay Municipal Utility District
Contacts1 person available
OfficeN/A

Full Description

Show more
This project is for the replacement of an existing emergency diesel generator that is nearing the end of its service life with a new Tier 4 Final emergency diesel generator at the Mokelumne River Fish Hatchery. The hatchery is located at the end of PG&E's power line, which has led to outages, thereby necessitating reliable backup power to maintain operations to prevent lost fish production. The new generator will be sited on the current location of the existing generator to be removed. Overview and Background The Mokelumne River Fish Hatchery (MRFH) supports the maintenance and enhancement of Chinook salmon and steelhead populations in the Mokelumne River. During unplanned utility power outages, emergency generators provide backup power to critical hatchery equipment, including chillers used to maintain optimal temperatures for egg incubation. East Bay Municipal Utility District (EBMUD) is replacing outdated electrical equipment at the MRFH to improve the reliability of emergency backup power essential to hatchery operations. Power outages that disrupt critical hatchery functions could result in fish production losses and potential regulatory noncompliance. The Project will replace an existing 125 kW emergency generator with a new 500 kW diesel generator certified to meet U.S. Environmental Protection Agency (EPA) Tier 4 Final emissions standards. The new generator will be capable of supplying emergency power to all electrical loads serving the hatchery facility. The Project is located at the MRFH in Clements, San Joaquin County, California (see Figure 1). Project Purpose and Objectives The purpose of the Project is to replace an existing emergency diesel generator, which is nearing the end of its service life, with a new 500 kW diesel generator that meets EPA Tier 4 Final emissions standards and applicable requirements of the San Joaquin Valley Air Pollution Control District (SNAPCD). The Project also includes replacement of associated electrical equipment (e.g., switchboard, automatic transfer switch, control panel, load bank, cables) to ensure the reliability and functionality of the hatchery's emergency power system. Project Location The Project site is located off North McIntire Road in Clements, California (see Figure 1) and is wholly within the MRFH facility site. All Project activities will occur within the existing hatchery facility. The existing access road will be used for construction personnel, equipment, and material deliveries. Project Characteristics The new emergency generator will be installed at the location of an existing emergency diesel generator. During a utility power outage, the automatic transfer switch (A TS) will coordinate with the generator control system to transfer the designated facility electrical loads from utility power to emergency generator power. A second 250 kW emergency diesel generator that serves the York chiller will remain in service as redundancy to the new generator. Project activities will include demolition and removal of the existing 150 kW generator, switchboard/control panel assembly, and associated concrete pad; site preparation; grading and excavation for construction of a new reinforced concrete pad; installation of the new generator and associated electrical equipment; shallow trenching for fiber optic cable installation; and associated paving and site restoration. The proposed Project site plan is shown in Figure 2. Permits and Approvals All Project activities will occur on EBMUD property. Encroachment permits are not required because no work will occur within the public right-of-way. Coordination with PG&E for replacement of a 1200A Panel and transfer of an existing meter will occur. The Project will obtain the applicable air quality permits from the SJV APCD, including the required Authority to Construct and Authority to Operate approvals for the new generator. Schedule and Work Hours The construction schedule will be coordinated with hatchery operations to minimize disruption to critical facility functions. Construction is anticipated to begin in June 2027 and take approximately four months to complete, during the months when the hatchery is not in operation. Construction activities will generally be limited to weekday daytime hours, between 7:00 a.m. and 7 :00 p.m., to the extent feasible. EBMUD Practices and Procedures Standard EBMUD construction environmental protection and safety practices applicable to all EBMUD construction projects have been incorporated into the Project. These standard practices minimize potential environmental effects, protect health and safety, and reduce disruptions associated with construction activities. See Figures 1 and 2 for additional information.

More opportunities from California → East Bay Municipal Utility District

Same awarding agency

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS