This Award Notice opportunity from Department Of The Interior was posted on May 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract under solicitation number 140P8326Q0014 mandates the installation of a turnkey underground single-mode fiber optic network within the Tahoma Woods government housing area of Mount Rainier National Park, Washington. The project encompasses extensive outside plant work, including trenching, conduit placement, subsurface vault construction, fiber splicing, slack loop installation, and the deployment of fiber optic network interface devices (NIDs) rated IP65 for outdoor use, with specific models F1-62DW-2 and F1-62DW-3 referenced. Inside plant activities require the installation of a high-density Optical Distribution Frame in the Administration Building and the routing of conduit and fiber cable to each individual residential unit, including demarcation boxes and conduit provisions for future wireless access points. The work must comply with industry standards such as NEC, NESC, ANSI/TIA/EIA-606-A, UL 969, BICSI, and ASTM, with all labeling required to be permanent, non-fading, and applied via approved systems. The project has a strict performance window: work must begin within 10 calendar days of notice to proceed and be fully completed within 45 calendar days, with the anticipated performance period running from April 15 to July 15, 2026. All work is subject to federal jurisdiction and must adhere to National Park Service regulations, including seasonal shutdown provisions that do not allow for time extensions and require advance notice for resumption.
The contract is a firm-fixed-price, 100% small business set-aside under NAICS code 238210, with a solicitation value estimated between $100,000 and $250,000. Offerors must be certified as a small business via SAM.gov and provide a valid UEI and CAGE code, with additional disclosures required if covered telecommunications equipment or services are used under FAR clauses 52.204-24 and 52.204-29. Compliance with the Davis-Bacon Act wage determination for Pierce County, Washington (WA20260127) is mandatory, including payment of prevailing wages and fringe benefits for all laborers and mechanics. Contractors must carry workers’ compensation insurance per Washington state requirements and submit a site-specific safety and health plan approved by the COR and safety office, aligning with OSHA standards. All work is subject to rigorous inspection
General Info
Fiber optic cable installation in Mount Rainier National Park, total small business set-aside.
HighAI Summary for Amd_0003_Attachment_4_SOW_MORA_T-Woods_Fiber_Optic_Cable_Install: This Statement of Work (SOW) dated December 2025 outlines the turnkey installation of an underground single-mode fiber optic cable network at Tahoma Woods housing area within Mount Rainier National Park. The contractor is required to engineer, furnish, install, and test a fiber optic feeder/distribution network excluding active electronics. Key tasks include feeder cable installation, conduit and vault installation, fiber splicing, and installation of optical distribution frames and building entrance cabling for apartments and single-family homes. The SOW specifies site visit requirements, detailed technical specifications for outside and inside plant infrastructure, and testing and acceptance criteria including OTDR testing and documentation deliverables. Work restrictions and coordination with the Contracting Officer are also included, with anticipated contract award in early to mid-April 2026.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for Amendment 0001 to Solicitation 140P8326Q0014: This document is Amendment 0001 to Solicitation 140P8326Q0014, effective 02/18/2026. It modifies the original solicitation by publishing contractor questions and answers from a site visit held on 3/4/2026, including an example of a NID as referenced in the Q&A. The amendment requires acknowledgment by offerors and maintains all other terms and conditions of the original solicitation unchanged.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for Amendment 0002 to Solicitation 140P8326Q0014: This document is Amendment 0002 to Solicitation 140P8326Q0014, effective 02/18/2026. The amendment publishes documents from Amendment 0001 that were not uploaded properly. Amendment 0001 included contractor questions and answers from a site visit held on 3/4/2026, along with an example of a NID as covered in the Q&A. The amendment does not extend the offer receipt date and requires acknowledgment of receipt prior to the specified deadline. All other terms and conditions of the original solicitation remain unchanged.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0003 Contractor Q&A for Solicitation 140P8326Q0014: This document is Amendment 0003 for solicitation 140P8326Q0014, containing contractor questions and answers related to the MORA Tahoma Woods Fiber Optic Cable Installation project. It addresses conduit and Ethernet cable installation details, patch panel locations, specifications for moisture-resistant EMT conduit, responsibilities for conduit repairs, pavement restoration requirements, vault type options, traffic control, trenching methods, conduit materials, tracer wire use, and slack fiber storage. The document clarifies technical and procedural aspects to assist contractors in preparing their bids.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0003 to Solicitation 140P8326Q0014: This document is Amendment 0003 to Solicitation 140P8326Q0014, effective 02/18/2026. It extends the contractor questions deadline to 3/23/2026 and the solicitation close date to 4/2/2026. The amendment includes updated contractor Q&A, and an amended Statement of Work (SOW) with changes such as specifying a minimum 120-strand fiber optic cable or alternatively a 144-fiber cable, updating Ethernet cable specifications from Cat6E to Cat6A with allowance for standard Cat 6 cable, and additional asphalt construction and application requirements. It also references previous amendments and maintains all other terms and conditions unchanged.
DOCX
DOCX, High priority: read this first8 pages · price-schedule
HighAI Summary for Attachment 5 - Price Schedule and Forms to Return with Quote: This document is Attachment 5 titled 'Forms to Return with Quote' and includes a detailed price schedule for a contract involving the installation of fiber optic cable at Tahoma Woods. It requires the contractor to submit a lump sum price covering all labor, materials, equipment, and other costs. The document also includes sections for contractor and subcontractor experience and past performance references, a technical approach work plan, and compliance with specific FAR provisions related to telecommunications equipment. The form must be completed and returned with the quotation package as part of the contract submission process.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for B11_NID_Example_MORA_T-Woods_Fiber_Optic_Cable_Install Specifications: This document provides detailed specifications for FIS Fiber Optic Network Interface Devices (NID) designed for wall mount applications. It includes features such as built-in swing-out mini splice trays, bulkhead panels for SC Simplex/LC Duplex adapters, IP65 weather-tight ratings, locking doors, and suitability for indoor/outdoor cable installations. Two models, F1-62DW-2 and F1-62DW-3, are described with their dimensions, entry ports, material, suitable cable diameters, and splice tray capacities. Accessories compatible with each model are also listed. The document is intended to guide installation and product selection for fiber optic cable projects.
DOCX
DOCX, High priority: read this first3 pages · contractor-quality-control-daily-report
HighAI Summary for Contractor's Quality Control Daily Report: This document is a Contractor's Quality Control Daily Report used to record daily construction activities and inspections. It includes fields for project and contract information, weather and ground conditions, prime contractor and subcontractor workforce and equipment details, work performed, materials delivered, inspections and testing results, government instructions on deficiencies, remarks, and certification by the contractor's quality control representative. The report is structured to track multiple subcontractors and their work. It serves as a formal record to ensure compliance with contract plans and specifications on a daily basis.
PDF
PDF, High priority: read this first34 pages · rfq
HighAI Summary for RFQ 140P8326Q00014 Attachment 2 - Terms, Provisions and Clauses: This document is Attachment 2 to RFQ 140P8326Q00014, titled Terms, Provisions and Clauses. It includes detailed contract terms for a construction-related procurement, such as inspection and acceptance clauses (52.246-12), contract administration data, special contract requirements including wage rates and safety plans, and representations and instructions for offerors. The document references the solicitation form SF 1442 and contains sections on the bid schedule, project specifications, packaging, marking, and contract clauses incorporated by reference. It provides essential contract provisions and instructions for bidders, dated with references up to 2023 and 2025, indicating current regulatory compliance.
PDF
PDF, High priority: read this first3 pages · rfq
HighAI Summary for RFQ 140P8426Q0014 FAQs for Small Business Electrical Construction: This document is an FAQ attachment for the Request for Quote (RFQ) number 140P8426Q0014, issued for a 100% Small Business Set-Aside electrical construction project under NAICS code 238210. It provides clarifications and reiterates key information from the RFQ package, including project scope, estimated value ($100,000 to $250,000), contract type (firm-fixed-price), period of performance (April 15 to July 15, 2026), site visit requirements, bonding and insurance details, SAM registration requirements, submission instructions, and deadlines. The document emphasizes the importance of reviewing the full solicitation package and monitoring SAM.gov for amendments. It is dated around early 2026 and serves to assist prospective offerors in preparing their quotes.
PDF
PDF, High priority: read this first3 pages · q-and-a
HighAI Summary for Site Visit Q&A for T-Woods Fiber Optic Cable Install Solicitation 140P8326Q001404: This document is a Q&A from a pre-proposal site visit for the T-Woods Housing Fiber Installation Project under Solicitation 140P8326Q001404 dated March 2026. It addresses contractor questions about installation specifics such as types of fiber optic network interface devices (NIDs), conduit sizes and routing, fiber cable specifications, fiber panel requirements, and acceptable installation methods including trenching and boring. The Q&A clarifies acceptable substitutions, installation preferences, and design flexibility for contractors preparing bids, ensuring compliance with project specifications and building codes.
PDF
PDF, High priority: read this first3 pages · ifb
HighAI Summary for Solicitation 140P8326Q0014 for Fiber Optic Cable Installation at Mount Rainier NP: This document is a Solicitation, Offer, and Award form (SF 1442) issued on 02/18/2026 for sealed bid (IFB) number 140P8326Q0014. It requests bids for installing fiber optic cable in the Tahoma Woods area of Mount Rainier National Park, as detailed in the attached Statement of Work (SOW). The contractor must begin work within 10 calendar days and complete it within 45 calendar days after receiving the notice to proceed. Performance and payment bonds are required. Sealed bids are due by 3:00 PM local time on 03/19/2026 and will be publicly opened at that time. The solicitation includes instructions for submission and specifies that offers must remain valid for at least 60 days after the due date.
PDF
PDF, High priority: read this first6 pages · sow
HighAI Summary for SOW Appendix C Cable Distribution Count Diagram - Mount Rainier National Park Fiber Install Phase 2: This document is Appendix C of the Statement of Work (SOW) for the Mount Rainier National Park Tahoma Woods Housing Fiber Install Project - Phase 2, revised on 2/15/2026. It provides detailed cable distribution count diagrams, listing fiber binder groups, fiber numbers, vault locations, and building fiber IDs. The tables organize fiber optic cable feeds and distribution/drop points across various vaults and buildings, essential for the fiber installation project. This technical appendix supports the SOW by specifying the fiber cable layout and distribution for the project.
PDF
PDF, High priority: read this first37 pages · sow
HighAI Summary for SOW for Tahoma Woods Fiber Optic Cable Installation Dec 2025: This Statement of Work (SOW) dated December 2025 outlines the project for engineering, furnishing, installing, and testing a turnkey underground single-mode fiber optic network at Tahoma Woods government housing area within Mount Rainier National Park. The scope includes outside plant infrastructure such as feeder cable installation, conduit systems, subsurface vaults with fiber splicing, and slack loops. Inside plant work involves installing a high-density Optical Distribution Frame (ODF) in the Administration Building. Building entrances for apartments and single-family homes require conduit and fiber cable installation with demarcation boxes. Preparation for future wireless access points includes conduit and Ethernet cable installation. Testing includes end-to-end optical loss and OTDR testing with deliverables of as-built drawings and test reports. Site visits are mandatory, and work is scheduled to start shortly after contract award in April 2026, with a 45-day completion window.
PDF
PDF, High priority: read this first10 pages · wage-determination
HighAI Summary for Wage Determination for Pierce County Washington Heavy Construction 2026: This document is a wage determination for heavy construction projects in Pierce County, Washington, effective January 2, 2026. It supersedes the previous wage determination WA20250127 and lists prevailing wage rates and fringe benefits for various construction trades including bricklayers, electricians, operators, laborers, and others. The document includes rates for union and survey classifications, and notes compliance requirements with Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage standards for federal contractors. It serves as a critical reference for contractors to ensure compliance with labor standards on federally funded construction projects in the specified region.
DOCX
DOCX, Low priority1 page · test-report
LowAI Summary for Daily Test Report Information Sheet: This document is a Daily Test Report Information Sheet associated with a contract. It includes fields for recording details such as the individual making the inspection or test, testing laboratory information, description of work and test methods, location of samples, specification sections, inspection or test data, test results and interpretations, comments on compliance, recommendations, and corrective actions taken. The document concludes with a certification statement by the inspector affirming the completeness and correctness of the report and compliance with contract plans and specifications.
Amendment 0003 - The purpose of this amendment is to:
1. Post continued contractor's Questions and Answers. 2. Extend contractor questions deadline from 3/9/2026 at 12p PT to 3/23/2026 at 12p PT. 3. Extend solicitation close date from 3/19/2026 at 3p PT to 4/2/2026 at 3p PT. 2. Provide amended SOW to include the changes listed below: List of changes: 1.2(a)(1) Original Text: Feeder Cable Installation: The Contractor shall procure and pull a 120-strand single-mode fiber optic feeder cable from the designated Optical Distribution Frame (ODF) located in the server room of the Administration Building, through existing and new vaults/conduit to the furthest vault in the housing area for mid-span cable distribution. Changes: Added "minimum" after "120-strand" Added "A 144-fiber cable is alternately acceptable if sourcing a 120-fiber cable is more difficult or costly." at the end of the paragraph 1.2(d)(2) Original text: Ethernet Cable Installation: The Contractor shall supply and install an RJ-45 patch panel and pull and terminate one (1) Cat6E Ethernet cable from the patch panel to each WAP location. Changes: Replaced "Cat6E" with "Cat6A" Added "Use of standard Cat 6 Ethernet cable is also acceptable." at the end of the paragraph. 3.6 ASPHALT Added additional requirements in sections E "construction" and F "asphalt application" as required by park maintenance responsible for maintaining the road. All other sections were kept intact.
Amendment 0002 - The purpose of this amendment is to publish Amendment 0001's documents that were not uploaded properly.
Amendment 0001 - The purpose of this amendment is to publish contractor questions and answers that came out of the site visit held on 3/4/2026. Please see attached Q&A's, along with an example of a NID as covered in the Q&A's.
MOUNT RAINIER NATIONAL PARK TAHOMA WOODS FIBER OPTIC CABLE INSTALL
Install fiber optic cable in the Tahoma Woods area of Mount Rainier National Park in accordance with the attached Statement of Work (SOW).
More opportunities from Department Of The Interior → Pwr Olym MABO(83000)