Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, June 24 at 2:00 PM EDT

Register Free →

MORNHINWEG WETLANDS RESERVE EASEMENT RESTORATION NOBLE COUNTY, OK

Active
12FPC326B0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract for the Mornhinweg Wetlands Reserve Easement Restoration in Noble County, Oklahoma, involves extensive earthwork and environmental restoration tasks. This includes clearing and removal of vegetation such as trees, brush, stumps, and debris from designated areas, followed by excavation and appropriate disposal of materials as specified in the contract drawings. The work further requires constructing earth embankments and other earthfills, spreading topsoil to designated depths, and installing structures with portland cement concrete. Additionally, it covers the furnishing and installation of steel pipe with all necessary components, as well as seeding and planting on designated areas to complete the restoration process. A site visit is scheduled for June 10th, 2026, at 10:00 am Eastern Time, where attendees will meet at the Perry NRCS Field Office in Perry, Oklahoma. The solicitation number for the contract is 12FPC326B0009, posted on June 1st, 2026, with a response deadline of June 30th, 2026. This is a Total Small Business Set-Aside opportunity under NAICS code 237990, overseen by the Department of Agriculture's FPAC Business Center Acquisition Division. The primary point of contact for the contract is Mark Domingo, and detailed specifications are provided in an attached document.

General Info

Mornhinweg Wetlands restoration involves clearing, earthwork, concrete, steel pipe, seeding; small business set-aside.

Agency

Department Of Agriculture → Fpac Bus Cntr-Acq Division

NAICS

237990 - Other Heavy and Civil Engineering Construction View NAICS

Place of Performance

OK, USA

Set-Aside

SBA

Documents

(13)

Attachment 2 - Drawings Approved Revised 5.8.26

PDFother

Attachment 1 - Specifications revised 5-8-26 for WRE Project Noble County 2025

PDFspecifications

IMG_1822.JPG

JPG

MornhinwegWRP Site Showing Sign-in Sheet 061026

PDFsign-in-sheet

Wage Determination OK20260034 for Heavy Construction in Oklahoma Counties

PDFwage-determination

IMG_1820.JPG

JPG

IFB 12FPC326B0009 Mornhinweg Wetlands Reserve Easement Restoration

PDFifb

IMG_1826.JPG

JPG

MORNINWEG WRE PROJECT Pre-Bid Conference Meeting Notes Solicitation 12FPC326B0009

PDFpre-bid-conference-notes

Attachment 1 - Specifications for WRE Project Noble County 2021

PDFspecifications

Mornhinweg WRE Drawing Package

PDFspecifications

IMG_1827.JPG

JPG

IFB 12FPC326B0009 Mornhinweg Wetlands Reserve Easement Restoration

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseCombined Synopsis
Posted

Combined Synopsis

Amendment 0

Contract was updated

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Fpac Bus Cntr-Acq Division
Contacts1 person available
OfficeWASHINGTON, DC, 20250, USA
Organization / Agency
Department Of Agriculture → Fpac Bus Cntr-Acq Division
Office AddressWASHINGTON, DC, 20250, USA
Contacts

Full Description

Show more

Please see attachment 1 Specifications document for further details .


Site Showing Details:


A site visit will be held on date June 10th, 2026 at 10:00am ET on that day.


Attendees will meet at:


Where:


      Perry NRCS Field Office.


                                1302 Highway 77N


                                Perry, OK



The work consists of clearing and grubbing and disposal of trees, snags, logs, brush, stumps,


shrubs, and rubbish from the designated areas.



Excavation required by the drawings and specifications and disposal of the excavated materials.


Construction of earth embankments, other earthfills, and earth backfills required by the drawings and


specifications.


Furnishing and spreading topsoil to specified depths at locations shown on the drawings.


Furnishing, forming, placing, finishing, and curing portland cement concrete as required to build the structures described in section 24 of this specification.


Furnishing and installing steel pipe complete with lining, coating, fittings, and appurtenances.


Furnishing seed, labor, equipment, and planting seed on designated areas.


*See Specifications document attached to posting for full details of required work.

Similar Contracts