Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

motor assembly, electric

Active
SPE7M216R0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract solicitation SPE7M216R0007 concerns the procurement of 71 units of an electric motor assembly (NSN 6105-01-643-5520) to be delivered within 240 days to Hill Air Force Base, Utah. The contract is anticipated to be firm fixed-price with shipment FOB origin and inspection and acceptance also at origin. This is an unrestricted solicitation open to all responsible sources, with the product to be manufactured in accordance with specific configuration management requirements as outlined in SAE EIA-649-1, ensuring strict control over engineering changes, deviations, and waivers. Requests for variances and engineering change proposals must be submitted with the required documentation and approvals, and any approved changes will be formally incorporated into the contract through modifications issued only by the Contracting Officer. The contract prohibits the intentional addition or direct contact of mercury or mercury-containing compounds with furnished hardware unless exceptions apply, such as specified battery or instrumentation applications. Packaging will conform to ASTM D3951 with additional marking and unit-of-issue requirements taking precedence. Offers must be submitted in English and U.S. dollars, with proposals accepted via mail, fax, or email to designated submission points, explicitly not to the buyer. The solicitation anticipates possible use of Reverse Auctions for price discussions, and evaluation will be based on a combination of price, delivery, past performance, and other factors as detailed in the solicitation. Alternate products require submission of complete data packages for evaluation, and unauthorized substitutions may lead to penalties. The solicitation was to be issued in mid to late March and will be accessible via the DIBBS website. Interested suppliers may identify their capability to fulfill the requirement with commercial items within 15 days of the notice.

General Info

Procurement of 71 electric motor assemblies delivered in 240 days, fixed-price, strict engineering controls.

Agency

N/A

NAICS

335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Sources Sought

Type Changed

Sources Sought → Presolicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts

Full Description

Show more
Proposed solicitation, SPE7M216R0007, is for NSN 6105-01-643-5520, a Motor Assembly, Electric. Anticipated quantity is 71 each, which are to be shipped to Hill Air Force Base UT 84056-5734, with an anticipated required delivery of 240 days. FOB point is origin I/A/W First Destination Transportation. Inspection and acceptance to take place at origin. Anticipated award to be a firm fixed price contract. The solicitation will be unrestricted. All responsible sources may submit an offer which shall be considered. ITEMS TO BE MANUFACTURED I/A/W MOTOR ASSEMBLY, ELECTRIC Configuration Change Management - Engineering Change Proposal, Requests for Variance (Deviation or Waiver) February 2015 1. Requirements A. The Configuration Change Management section of SAE EIA-649-1 Configuration Management Requirement for Defense Contracts, Paragraph 3.3, shall be used for Configuration Control of material purchased under this contract. B. Furnished item(s) shall conform to the approved configuration requirements/revision specified, unless a Pre-Production Request for Variance (deviation) or a Post-Production Request for Variance (waiver), is processed and approved as provided by Paragraph 3. in this Standard Text Object (STO). Hereafter, the term #Request for Variance (RFV)# will also include Requests for Deviations and Waivers. 2. The definitions from EIA-649-1 apply to items being procured under this solicitation/contract, with the following clarification of Deviation & Waiver: A. Pre-Production RFV (previously known as deviation) requests permission to produce a product that does not conform to contract requirements/documentation for a limited amount of time and for specified effectivity. (A deviation differs from an engineering change in that an approved engineering change requires corresponding revision of the item's current approved configuration documentation, whereas a deviation does not.). B. Post-Production RFV (previously known as waiver) requests approval of product found during manufacture, or after having been submitted for Government inspection or acceptance, that departs from specified requirements, but nevertheless is considered suitable for use "as is" or after repair by an approved method. 3. Contractor responsibilities. A. An Engineering Change Proposal (ECP) is used to make permanent changes in the Government technical data package (TDP). Pending approval of an ECP, contractual relief should be requested in writing by the Contractor using a RFV. B. Refer to FAR Part 48 Value Engineering for cost saving improvements to the Technical Data Package (TDP). C. All ECPs submitted by the Contractor will be deemed routine. If the Contractor considers an ECP as an emergency or urgent; they shall include in their ECP submittal an explanation and all applicable supporting documentation. All ECPs will be reviewed for a determination on criticality, and, if concurred to be an emergency, the appropriate processing time-frame negotiated with the ESAs will be followed and the Contractor will be notified of anticipated response time. D. For ECPs, Specification Change Notices (SCNs) or RFV, the Contractor must submit the applicable documentation listed in sub-paragraphs D.(1) through D.(4)to the Administrative Contracting Officer(ACO), with an information copy to the Procuring Contracting Officer (PCO). Failure to submit a complete legible package may result in return of the ECP/RFV without processing. (1) Documentation listed in Paragraph 3.3.1 (for ECPs), 3.3.2 (RFV), 3.3.3 (for SCNs) or 3.3.4 (for Notices of Revision (NORs)) of the latest revision of EIA-649-1. (2) DD Form 1692 (current revision) for ECP. (3) DD Form 1694 (current revision) for RFV. (4) DD Form 1695 (current revision) for NOR. 4. DLA#s responsibilities: A. Upon receipt of the ECP or RFV, the PCO will ensure that the applicable product specialist receives the copy from DCMA. B. Within five (5) working days from the date of receipt of the Contractor's ECP or RFV from DCMA, the PS must submit the requests and any supporting documentation via a 339 to the appropriate Engineering Support Activity (ESA), when applicable. C. Routine ECPs will be processed within 90 days from receipt by the ESA. RFVs will be evaluated and processed within 30 days from receipt by the ESA or as negotiated with the ESA. (1) The contractor will be notified in writing of approval by the return of an approved copy of the ECP or RFV. Approval will be reflected by signature of the contracting activity or a review activity specifically identified in the contract. (2) The contractor will be notified in writing of disapproval including reason(s) for disapproval. 5. For an approved RFV or an approved ECP, when the request affects the Contract, a modification will be issued to the contract incorporating the applicable requirement changes. Only a Contracting Officer is authorized to issue a modification incorporating the approved RFV and/or ECP. 6. Questions regarding the status of previously submitted ECP or RFV should be directed to the PCO. 7. The submission of an ECP or RFV by the Contractor does not affect the required delivery date of the contract. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. 8. The period of time for evaluation and approval/disapproval of an ECP and/or a RFV, as specified in Paragraph 4. C., shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way relieve the contractor from compliance with the contract delivery schedule. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract. (End) MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL NOT BE INTENTIONALLY ADDED TO OR COME IN DIRECT CONTACT WITH ANY HARDWARE OR SUPPLIES FURNISHED UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS; AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA. PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR MERCURY COMPOUND. (IAW NAVSEA 5100-003D). NO DATA IS AVAILABLE. THE ALTERNATE OFFEROR IS REQUIRED TO PROVIDE A COMPLETE DATA PACKAGE INCLUDING DATA FOR THE APPROVED AND ALTERNATE PART FOR EVALUATION. WHEN THE PURCHASE ORDER TEXT (POT) DESCRIBES THE REQUIRED PRODUCT(S) BY NAME AND PART NUMBER OF A SPECIFIC ENTITY, BY THE NAMES AND PART NUMBERS OF A NUMBER OF SPECIFIC ENTITIES, OR BY THE NAME(S) AND PART NUMBER(S) OF SPECIFIC ENTITY/ENTITIES AS MODIFIED BY ADDITIONAL REQUIREMENTS SET FORTH IN THE POT ONLY THAT/THOSE PRODUCT(S) HAVE BEEN DETERMINED TO MEET THE NEEDS OF THE GOVERNMENT AND ARE ACCEPTABLE. SUCH PRODUCT(S) ARE EXACT PRODUCT(S) AS DEFINED IN DLAD 52.217-9002, CONDITIONS FOR EVALUATION AND ACCEPTANCE OF OFFERS FOR PART NUMBERED ITEMS. A VENDOR OFFER/QUOTATION, BID WITHOUT EXCEPTION, IS A CERTIFICATION THAT THE EXACT PRODUCT, MANUFACTURED AND/OR SUPPLIED BY ONE OF THE ENTITIES CITED IN THE POT WILL BE FURNISHED UNDER THE CONTRACT OR ORDER. ANY PRODUCT NOT MANUFACTURED AND/OR SUPPLIED BY ONE OF THE ENTITIES CITED IN THE POT IS AN ALTERNATE PRODUCT, EVEN THOUGH IT MIGHT BE MANUFACTURED IN ACCORDANCE WITH THE DRAWING(S) AND/OR SPECIFICATIONS OF ONE OF THE ENTITIES CITED IN THE POT. IF AN ALTERNATE PRODUCT IS FURNISHED UNDER A CONTRACT OR ORDER FOR AN EXACT PRODUCT, THE ALTERNATE PRODUCT WILL BE AN UNAUTHORIZED SUBSTITUTION, AND MAY YIELD CRIMINAL PENALTIES IN ADDITION TO ANY CIVIL REMEDIES AVAILABLE TO THE GOVERNMENT. MEGGITT SAFETY SYSTEMS, INC. DBA 25693 P/N 904141-02. PACKAGING REQUIREMENTS: PKGING DATA-QUP:001 SHALL BE PACKAGED IN ACCORDANCE WITH ASTM D 3951. Markings Paragraph When ASTM D3951, Commercial Packaging is specified, the following apply: ,,All Section "D" Packaging and Marking Clauses take precedence over ASTM D3951. ,,In addition to requirements in MIL-STD-129, when Commercial Packaging is used, the Method of Preservation for all MIL-STD-129 marking and labeling shall be "CP" Commercial Pack. ,,The Unit of Issue (U/I) and Quantity per Unit Pack (QUP) as specified in the contract take precedence over QUP in ASTM D3951. Based on market research, the Government is not using the policies contained in Part 12, Acquisition of Commercial Items. However, interested persons may identify to the contracting officer their interest and capability to satisfy the Government's requirement with a commercial item within 15 days of this notice. One or more of the items under this acquisition may be subject to Agreement on Government Procurement approved and implemented in the United States by the Trade Agreement Act of 1979. All offers shall be in the English language and in U.S. Dollars. All interested suppliers may submit an offer. This solicitation will be made available on its issue date at HTTPS://WWW.DIBBS.BSM.DLA.MIL/ . PLEASE NOTE: THE SOLICITATION WILL NOT BE AVAILABLE UNTIL THE ISSUE DATE. Issue date is anticipated to be mid to late March. While price may be a significant factor in the evaluation of offers, the final award decision will be based upon a combination of price, delivery, past performance and other evaluation factors as described in the solicitation. The Contracting Officer may utilize online Reverse Auctioning as a means of conducting price discussions under this solicitation. A written offer is required and is to be returned to the Bid Room at DLA Land and Maritime, PO Box 3990, Columbus OH 43218-3990, or can be faxed to +1 (555) 000-0000. In addition, submission of proposals by electronic commerce (e-mail) is allowed. Submit e-mailed proposals to the Bid and Abstract Room at contact@example.gov. E-mailed proposals cannot exceed 15 MB. E-mailed proposals cannot exceed 15 MB. NO OFFERS SHOULD BE MAILED, EMAILED OR FAXED TO THE BUYER.

Similar Contracts

Same NAICS industry code

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS