Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Motor Control Center (MCC) Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the replacement of an existing 480-volt motor control center with a new MCC-E unit at a Dublin San Ramon Services District wastewater treatment plant in Pleasanton, California. The scope of work includes the removal of the old equipment, installation and wiring of the new unit, and the execution of all necessary testing and start-up procedures. All work must adhere to specific seismic design criteria and technical standards outlined in sections 01612 and 01660. The project is categorized under NAICS code 238210 and is intended for prime contractors managing the facility upgrades. Interested parties must submit their responses by the deadline of November 11, 2026. The final deliverable is a fully installed, tested, and operational 480V Motor Control Center.

General Info

Replace 480V motor control center at Pleasanton wastewater plant by November 11, 2026.

Documents

This scope was carved out of 24-P044.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

WWTP Electrical Improvements – Phase 1

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Dublin San Ramon Services District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs replacement of an existing indoor 480-volt motor control center with a new unit (MCC-E) for prime contractors on DSRSD wastewater treatment plant projects. Removes existing 480V MCC, installs and wires new MCC-E, and performs testing and start-up per Section 01660 and seismic design criteria (Section 01612). Delivers an installed and tested 480V Motor Control Center.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections on energized transformers to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and performing detailed oil testing analysis. Additionally, the selected contractor must evaluate existing nitrogen blanket systems to ensure positive pressure and provide on-site training for up to 20 agency staff members on inspection methods and defect identification. All work must adhere to strict industry standards, including NETA MTS, IEEE, NFPA 70E, and ASTM D923, with infrared inspections performed by ASNT Level 1 certified technicians or higher. The agency intends to make a single award to the most capable offeror based on their past performance, staffing plan, personnel availability, and cost-effectiveness. Qualified proposers must have completed at least two similar projects within the last five years, including at least one for a utility or industrial facility. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and required certifications such as a Non-Collusion Statement and Workers Compensation Certificate. The resulting contract will utilize fixed pricing with a not-to-exceed limit, and payments will be processed electronically via ACH within 30 days of invoice approval by the Project Manager.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in about 2 months
View Details
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves the inspection, testing, repair, and certification of emergency lighting systems to ensure compliance with NFPA 101 (2024 Edition) and NFPA 70 standards. The selected electrical contractor will be responsible for inventorying all fixtures, performing functional power-cut tests, applying durable tracking labels, and integrating recurring maintenance into the facility's Computerized Maintenance Management System. The estimated contract value ranges from $25,000 to $100,000, with a performance period of 30 business days following the written Notice to Proceed. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids equal to or greater than $25,000, contractors must provide a bid bond guarantee of 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. The award will be based on overall best value. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. The contract mandates strict adherence to federal labor and safety regulations, including the Davis-Bacon Act, Service Contract Labor Standards, and Executive Order 14026 regarding minimum wages. Contractors must provide paid sick leave per EO 13706 and display required bilingual employee rights and wage determination notices. Compliance with various FAR clauses is required, including those regarding the Buy American Act, whistleblower rights, and the prevention of trafficking in persons. Final acceptance and payment are contingent upon a substantial completion inspection and the resolution of a final punch list.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details

More opportunities from California → Dublin San Ramon Services District

Same awarding agency

NAICS: 237130
SLED
WWTP Electrical Improvements – Phase 1
Solicitation # 24-P044
The WWTP Electrical Improvements – Phase 1 (CIP 24-P044) is a solicitation by the Dublin San Ramon Services District for the furnishing of all labor, materials, machinery, and services required for electrical improvements at the Wastewater Treatment Plant in Pleasanton, California. The project is categorized under NAICS code 237130. The award will be based on the lowest responsive bid, determined by the Total Base Bid amount. Bids must be submitted as sealed proposals to the district office by 2 p.m. on November 11, 2026. The contract specifies a performance period of 760 consecutive days from the Notice to Proceed, with work commencing within 10 days of that notice. Key milestones include providing submittals for Switchgear SWGR-DPA and Motor Control Center MCC-E within 140 calendar days and ensuring the switchgear is in service before the motor control center. Final completion is set for 45 days after substantial completion, and the contractor must provide a one-year warranty from the date of acceptance. Administrative requirements include the use of PROCORE for project management and documentation. Strict packaging and labeling standards are mandated, particularly for spare parts and electronic trip unit modules, which must be in original manufacturer sealed packaging. The contractor is subject to prevailing wage requirements and must provide an Affidavit of Safety Compliance, along with general and auto liability insurance endorsements. Quality standards are based on the best-accepted practices in California or applicable ASTM and ASHRAE standards.
Power and Communication Line and Related Structures Construction

POSTED

14 days ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS