Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Rhode Island was posted on October 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Mounting Hardware Supply & Installation Planning

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332996
New
DIBBS
NUT, TUBE COUPLING
Solicitation # SPE7M3-27-T-1303
This contract, issued by the DLA Weapons Support Fluid Handling Division, is a small business set-aside solicitation for the procurement of 1,559 tube coupling nuts (NSN 4730-01-543-0356). The items must be manufactured from cadmium-plated 15-5PH stainless steel with .4375-20 UNJF-3B threads. Due to previous customer issues, the DCMA is required to perform a mandatory inspection to verify the presence of threads. The product is classified as a critical application commercial item and must be supplied by a manufacturer or distributor accredited and listed on the Performance Review Institute (PRI) Qualified Manufacturer List (QML) or Qualified Products List (QPL). Technical compliance is governed by standards SAE AS21921D and SAE AS18280H. The procurement is split into two delivery locations: 1,237 units to DLA Distribution Warner Robins and 322 units to DLA Distribution San Diego. The required delivery date is September 29, 2028, with a delivery window of 424 days after order. Shipping is designated as FOB Origin, and packaging must adhere to MIL-STD-2073-1E and MIL-STD-129. Environmental restrictions prohibit the use of Class I ozone-depleting chemicals and the intentional addition of mercury. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and adherence to various FAR and DFARS clauses regarding cybersecurity, hazardous material labeling, and the Buy American program.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 19 hours ago

DEADLINE

in 10 days
NAICS: 332996
New
DIBBS
BUSHING, PIPE
Solicitation # SPE7M3-27-T-1307
Solicitation SPE7M3-27-T-1307, issued by the DLA Weapons Support Fluid Handling Division, is a small business set-aside for the procurement of pipe bushings under NSN 4730-00-580-7417. The requirement is for 276 packages (PG), with each package containing 5 units, totaling 1,380 individual bushings. The items must comply with the SAE J514-3 standard (Revision 12/01/2023) and are designated as critical application items. Delivery is required within 41 days after the order, with a need ship date of January 8, 2027, and a final required delivery date of April 26, 2027. The shipping terms are FOB Origin, with inspection and acceptance occurring at the destination, specifically the DLA Distribution Depot at Hill AFB, Utah. The contract mandates strict adherence to environmental and safety standards, prohibiting the use of Class I ozone-depleting chemicals and the intentional addition of mercury or mercury-containing compounds. Packaging must follow MIL-STD-2073-1E and RP001 requirements, while marking must comply with MIL-STD-129. Administrative processing for payments and receiving reports must be handled electronically via the Wide Area WorkFlow (WAWF) system. Key regulatory clauses include the Buy American Act, DFARS cybersecurity requirements for safeguarding covered defense information, and specific prohibitions against covered defense telecommunications equipment.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 19 hours ago

DEADLINE

in 10 days
NAICS: 332996
New
DIBBS
TEE, TUBE TO BOSS
Solicitation # SPE7M4-27-T-3274
Solicitation SPE7M4-27-T-3274, issued by the DLA Weapons Support Fluid Handling Division, is for the procurement of 21 steel Tee Tube to Boss components with a 3/8 inch OD tube size. This is designated as a critical application item and a commercial item that requires manufacture by an accredited manufacturer and/or assembly by an accredited distributor as listed in the Performance Review Institute Qualified Manufacturer List (QML) or Qualified Products List (QPL). The manufacturing process must utilize forging, and the items must adhere to Class 3 thread standards and technical specifications SAE AS1032H (Revision H) and SAE AS4875/1A (Revision A). The use of Class I ozone depleting chemicals is strictly prohibited. The contract specifies a delivery lead time of 165 days after order, with a need ship date of May 12, 2027, and an original required delivery date of June 18, 2028. Delivery is FOB Origin, with inspection and acceptance occurring at the destination, the DLA Distribution Depot Oklahoma at Tinker AFB. Packaging must comply with ASTM D3951 and MIL-STD-129, with DLA Master List of Technical and Quality Requirements taking precedence. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and compliance with various FAR and DFARS clauses, including the Buy American and Balance of Payments Program and NIST SP 800-171 cybersecurity standards.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

about 19 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The State of Rhode Island is seeking a subcontractor for the supply of mounting hardware designed for installation across 21 different sites. The required hardware must be compatible with a variety of wall surfaces, including drywall, cinderblock, brick, and concrete. This subcontract opportunity was posted on October 29, 2025, and requires responses to be submitted by November 24, 2025. The project falls under NAICS code 332996, and interested parties can find further bidding details through the Rhode Island Division of Procurement portal.

General Info

Rhode Island seeks a subcontractor for mounting hardware across 21 sites by November 24.

Place of Performance

RI, USA

Set-Aside

NONE

Documents

This scope was carved out of RFQ26006063.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Commemorative Plaques for Community Learning Centers

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Metallic Bent Pipe Fabrication and SupplyOpen now, due in 8 days
  • Metal Tube Assembly Fabrication and SupplyOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyState of Rhode Island
ContactsNo contacts available
OfficeN/A
Organization / AgencyState of Rhode Island
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply mounting hardware suitable for drywall, cinderblock, brick, and concrete walls at 21 installation sites.

More opportunities from State of Rhode Island

Same awarding agency

NAICS: 236220
New
SLED
URI Washburn Hall Renovations Upper College Road Multi-Use Development Enabling
Solicitation # RFQ27007140
The University of Rhode Island is seeking a qualified general contractor for the Washburn Hall Renovations Upper College Road Multi-Use Development Enabling project located at 75 Briar Lane in Kingston, Rhode Island. The scope of work involves comprehensive structural stabilization and reinforcement from the basement through the third floor, including new foundations, concrete footings, and supplemental framing. Additionally, the project requires architectural renovations of second and third floor office and conference rooms, interior finishes, and modifications to HVAC, electrical, telecommunications, and fire protection systems, such as the installation of a new energy recovery ventilator and updated panelboards. The contract period is scheduled to run from approximately January 2027 through July 31, 2028, with liquidated damages of 10,000 dollars per day for delays affecting the academic schedule. Bidders must include total lump-sum allowances of 370,000 dollars in their base bid, covering foundation wall waterproofing, basement interior refinishing, and security and data installation. The project is governed by URI-revised AIA A101-2017 and A201-2007 contracts and requires adherence to Rhode Island prevailing wage rates, ADA standards, and specific bonding and insurance requirements. BL Companies serves as the design agent for the project.
Commercial and Institutional Building Construction

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS