MSD Pump Station – Louisville, KY

Active
msd-pump-station-louisville-ky

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the complete elimination and decommissioning of the Bullitt Hills and Hillview #1 wastewater treatment plants in Bullitt County, Kentucky, through the construction of a new wastewater pump station near the intersection of Preston Highway and Zoneton Road. This facility will receive sewage via new gravity pipelines from both existing plants and convey it through a 14-inch force main to the Hillview WWTP #2, enabling the shutdown of the older facilities. The scope encompasses all necessary earthwork, including excavation, grading, erosion control, traffic control, and testing, as well as the installation of pipelines, pump station infrastructure, and associated utilities. A wide range of subcontracted services is required, including asphalt paving, concrete work, electric installations, blasting, jack and bore tunneling, bypassing, CCTV inspections, manhole lining, masonry, painting, precast materials, paving, roofing, surveying, hauling, and HVAC systems. All work must comply with environmental and safety standards, with specific emphasis on erosion control and site restoration. The solicitation is issued by Cleary Construction, Inc., as a subcontractor procurement effort targeting certified Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and Asian-owned businesses, with responses required to indicate the bidder’s socioeconomic status. Plans and specifications are accessible via the Cleary Construction Plan Room and a designated ShareFile link. Bids must be submitted to the Estimating Department by 11:00 a.m. EDT on August 18, 2026, with responses due no later than 24 hours prior to the deadline via email or fax. The contract does not specify a total value, payment terms, bonding requirements, contract type, or detailed evaluation criteria, and key administrative details such as the contracting officer, point of contact for acceptance, or performance period remain undefined in the solicitation materials.

General Info

Decommission Bullitt Hills and Hillview #1 plants, build new pump station, convey sewage to Hillview WWTP #2 via 14-inch force main.

Agency

Cleary Construction, Inc.View Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

KY, US

Set-Aside

NONE

Documents

(1)

MSD Contract No 17257 Bullitt Hills & Hillview #1 WWTP Eliminations Subcontractor Quote Request

PDFrfq

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCleary Construction, Inc.
Contacts1 person available
OfficeN/A
Organization / Agency
Cleary Construction, Inc.
View Agency Profile
Office AddressN/A

Full Description

Show more
The project generally consists of the furnishing of all materials, equipment, and labor for the Bullitt Hills and Hillview #1 WWTP Eliminations. The project will include the construction of a new wastewater Pump Station near the intersection of Preston Highway and Zoneton Road in Bullitt County, Kentucky. The new pump station will receive sewer via new gravity pipes from, both, the Bullitt Hills and Hillview #1 WWTP, and then pump through a 14-inch force main to the Hillview WWTP #2, allowing for the elimination and decommissioning of the Bullitt Hills and Hillview #1 WWTPs. The project will also include all erosion control, excavation, grading, traffic control, and testing necessary to complete the work.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is forecasting the restoration of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build procurement model. The project aims to preserve the integrity of the aging infrastructure without excavation, leveraging modern rehabilitation methods to extend service life and enhance system reliability. The work will involve lining the existing pipeline with a resin-saturated fabric liner that is inverted and cured in place, minimizing disruption to adjacent roadways and surrounding facilities. The contract falls under NAICS code 237110, indicating it is classified as Water and Sewer Line and Related Structures Construction. Moraa Omwega serves as the primary point of contact for inquiries, with Ray Moreno designated as Project Manager. The solicitation was posted on July 31, 2026, and while no set-aside designation or bid deadline has been specified, interested parties are directed to the official Port of Seattle portal for updates and detailed technical requirements. The place of performance is tied to the Airport Expressway, although exact geographic coordinates are not provided, and all work must be coordinated with ongoing airport operations to ensure safety and minimize impact to airfield access and logistics.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
Civil Site Work and GradingThe contract titled Civil Site Work and Grading encompasses all necessary earthwork activities for the construction of a water treatment facility, including clearing and grubbing of vegetation, excavation, trenching, backfilling, and precise grading to meet engineering specifications. These tasks are critical to establishing a stable and functional foundation for the facility and must be executed in compliance with industry standards and regulatory requirements. The work is solicited as a subcontract under the Small Business Administration’s set-aside programs, which prioritize participation from Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business entities to promote equitable contracting opportunities. The solicitation is associated with NAICS code 237110, indicating it falls under Water and Wastewater Line and Related Structures Construction, and was posted on August 4, 2026, with a response deadline of August 13, 2026. The contracting entity is Filanc, and while specific geographic details such as city, state, or address are not provided, the performance location is expected to align with the agency’s designated project site. Interested bidders must meet the eligibility criteria for one or more of the specified SBA-certified small business categories to qualify for this opportunity, and submissions must be completed through the official portal linked via sba.gov/opportunity/central-coast-blue-awpf.
Filanc

POSTED

about 9 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
Storm Drain and Water Utilities InstallationThe contract pertains to the installation or repair of stormwater and potable water utility lines at a berth, focusing on critical infrastructure upgrades to support water management and supply systems. The work falls under NAICS code 237110, which classifies it as heavy and civil engineering construction, specifically related to utility system construction. The project is structured as a subcontract and is designated for participation by certified Disadvantaged Business Enterprises, Disadvantaged Veteran Business Enterprises, Minority Business Enterprises, and Woman Business Enterprises, with certifications required through DOT, State of California, NMSDC, and WBENC programs respectively, ensuring broad inclusion of underserved business communities. The solicitation was posted on August 4, 2026, with a strict response deadline of August 6, 2026, indicating a highly time-sensitive procurement process. The contracting organization is Manson Construction Co., which is likely leading a larger infrastructure initiative tied to maritime or port development. Although specific location details are not provided in the data, the work is tied to the NCMT Berth 24-11 Structural Repair project, suggesting alignment with ongoing efforts to modernize and stabilize berthing infrastructure. Participation requires bidders to meet strict eligibility criteria based on ownership and certification status, and the scope emphasizes both stormwater drainage and potable water utilities, pointing to comprehensive utility integration within the berth environment.
Manson Construction Co.

POSTED

about 9 hours ago

DEADLINE

in 1 day
View Details