Ready Mix/Flow Fill Supply

Active

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Cleary Construction, Inc. is seeking subcontractor support for the delivery of ready-mix concrete and flowable fill, also known as controlled low-strength material, to be used in backfilling and structural applications. The solicitation is open to certified Minority Business Enterprises with NMSDC accreditation and Woman Business Enterprises with WBENC certification, reflecting a non-federal set-aside designed to promote diversity in contracting. The contract falls under NAICS code 327320, which covers concrete product manufacturing, indicating the supply of specialized concrete materials rather than general construction services. Interested parties must submit responses by August 14, 2026, with the opportunity posted on August 4, 2026. The materials will be transported and delivered at a location tied to the MS-D Pump Station project in Louisville, Kentucky, though the exact delivery site details are not specified. This subcontract is part of a larger infrastructure initiative requiring consistent, high-quality concrete supply to meet engineering and safety standards for structural and backfill applications.

General Info

Cleary Construction seeks certified MBE/WBE subcontractor for ready-mix concrete and flowable fill delivery to Louisville pump station project by August 14, 2026.

Agency

Cleary Construction, Inc.View Agency

NAICS

327320 - Ready-Mix Concrete ManufacturingView NAICS

Place of Performance

KY, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCleary Construction, Inc.
ContactsNo contacts available
OfficeN/A
Organization / Agency
Cleary Construction, Inc.
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Delivery of ready-mix concrete and flowable fill (controlled low-strength material) for backfilling and structural applications.

Similar Contracts

Same NAICS industry code

More opportunities from Cleary Construction, Inc.

Same awarding agency

NAICS: 237110
New
MSD Pump Station – Louisville, KY
Solicitation # 17257
The project involves the complete elimination and decommissioning of the Bullitt Hills and Hillview #1 wastewater treatment plants in Bullitt County, Kentucky, through the construction of a new wastewater pump station near the intersection of Preston Highway and Zoneton Road. This facility will receive sewage via new gravity pipelines from both existing plants and convey it through a 14-inch force main to the Hillview WWTP #2, enabling the shutdown of the older facilities. The scope encompasses all necessary earthwork, including excavation, grading, erosion control, traffic control, and testing, as well as the installation of pipelines, pump station infrastructure, and associated utilities. A wide range of subcontracted services is required, including asphalt paving, concrete work, electric installations, blasting, jack and bore tunneling, bypassing, CCTV inspections, manhole lining, masonry, painting, precast materials, paving, roofing, surveying, hauling, and HVAC systems. All work must comply with environmental and safety standards, with specific emphasis on erosion control and site restoration. The solicitation is issued by Cleary Construction, Inc., as a subcontractor procurement effort targeting certified Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and Asian-owned businesses, with responses required to indicate the bidder’s socioeconomic status. Plans and specifications are accessible via the Cleary Construction Plan Room and a designated ShareFile link. Bids must be submitted to the Estimating Department by 11:00 a.m. EDT on August 18, 2026, with responses due no later than 24 hours prior to the deadline via email or fax. The contract does not specify a total value, payment terms, bonding requirements, contract type, or detailed evaluation criteria, and key administrative details such as the contracting officer, point of contact for acceptance, or performance period remain undefined in the solicitation materials.
Water and Sewer Line and Related Structures Construction

POSTED

about 8 hours ago

DEADLINE

in 14 days