Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Multi-benefit Ag Aquifer Storage & Recovery Project.

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Multi-benefit Ag Aquifer Storage and Recovery Project is a forecast initiative managed by the Tehama County Flood Control and Water Conservation District in California. The project focuses on achieving long-term groundwater sustainability within the subbasin by implementing activities related to the Los Molinos Groundwater Sustainability Plan. The primary scope of work involves the installation of less than 100 linear feet of piping to connect a canal diversion point from the Los Molinos Mutual Water District canal system to two existing groundwater wells. This infrastructure will allow for the direct recharge of surface water into the aquifer system using existing surface water rights. The project is categorized under NAICS code 237110 for heavy and civil engineering construction and will be performed in Tehama, California. Key points of contact include Justin Jenson, Deputy Director, and Jacques DeBra, Senior Water Resource Planner. While the project is currently listed as a forecast with a posted date of July 23, 2026, specific contract values, evaluation factors, and detailed federal acquisition regulations have not yet been established in the provided documentation.

General Info

Install short pipeline to recharge aquifer using existing wells and surface water rights in Tehama County.

Agency

California → Tehama County Flood Control and Water Conservation District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Tehama, CA, 96055

Set-Aside

NONE

Documents

(1)

NOE-Tehama ASR Notice of Examination

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Tehama County Flood Control and Water Conservation District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Tehama County Flood Control and Water Conservation District
Office AddressN/A
Contacts
Jacques DeBraSenior Water Resource Planner
Justin JensonDeputy Director

Full Description

Show more
The Ag Aquifer Storage & Recovery (ASR) Project will involve the installation of less than 100 linear feet of piping to convey surface water from the Los Molinos Mutual Water District canal system (surface water source) to the two adjacent Ag ASR wells (see attached map) allowing direct recharge of surface water into the aquifer system. The Project will use existing surface water rights for on-going groundwater recharge to achieve sustainable groundwater use. The project will involve the installation of a pipeline connecting the canal diversion point to the two (2) existing groundwater wells to be recharged. This action covers the construction-related project activities related to Los Molinos GSP implementation activities to achieve long term groundwater sustainability in the Subbasin.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The JCSD Intervalley Pipeline Project (PN C155003) involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. With an engineer's estimate of 36,000,000 dollars, the project is being managed by Filanc and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is extensive, encompassing pipeline infrastructure such as welding, cathodic protection, valves, and jack and bore operations, as well as civil engineering tasks including paving, striping, flatwork, precast vaults, fencing, and potholing. Additionally, the project requires technical services for surveying, settlement monitoring, videography, E&IC, and environmental management through SWPPP implementation and asbestos pipe demolition and removal. This solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, with a strong emphasis on the participation of SBE, MBE, and WBE entities. Filanc has indicated a willingness to assist qualified diverse firms with bonding, insurance, and equipment to encourage participation. Bids and quotes for the various project scopes must be submitted by 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications through Julia Masaitis.
Filanc

POSTED

about 4 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for the South Marsham Street Green Infrastructure Project located in downtown Romney, West Virginia. This targeted green-street retrofit involves approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The project scope requires the installation of at least 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and comprehensive drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project includes necessary curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, along with the planting of six native trees and approximately 345 native plants. The primary objective of the retrofit is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business set-asides, including SDB, WOSB, HUBZone, and Veteran-Owned Small Businesses under NAICS code 237110. Interested parties must submit their bids by the deadline of September 17, 2026, at 4:00 P.M. Primary contact for this opportunity is Jennifer Wilson via The Belt Group.
Harbel, Inc.

POSTED

about 4 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves the installation of critical water infrastructure for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, and drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, as well as the excavation of cobbles and large boulders. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid submission deadline of September 29, 2026. The project encourages the use of apprentices and provides specific support for M/W/DBE subcontractors regarding bonding, insurance, and material procurement.
James W. Fowler Co.

POSTED

about 4 hours ago

DEADLINE

in 23 days
View Details