Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on February 5, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

MULTI-DISCIPLINE ARCHITECT/ENGINEER SERVICES FOR MILITARY PROJECTS IN THE BALTIMORE DISTRICT, U.S. ARMY CORPS OF ENGINEERS

Awarded
W912DR19R0021Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 CPRG NCD SOQ
Solicitation # 2026-SOQ-004
The City of Rogers is soliciting Statements of Qualifications (SOQ) under solicitation number 2026-SOQ-004 for Natural Channel Design services to restore approximately 4,200 linear feet of stream in an urban setting. The scope of work includes engineering, plan design, hydrologic and hydraulic modeling, and the procurement of all necessary local, state, and federal regulatory permits, including potential Letter of Map Revision submissions to FEMA. This project is funded by the Climate Pollution Reduction Grant (CPRG) subaward CPRG-NWA-001 and EPA award 02F75801, requiring compliance with EPA nondiscrimination regulations, Title VI of the Civil Rights Act of 1964, and 40 CFR Parts 5 and 7. Key milestones include the completion and approval of construction plans and permit applications by May 1, 2027, with final construction completion targeted for December 31, 2027. Selection is based on a ranking of qualifications rather than price, with the highest-ranked firm invited to negotiate a contract. Evaluation criteria focus on professional staff expertise, past performance, understanding of the scope, and the quality of the work plan. Interested firms must submit a PDF via OpenGov or hard copy to Colt Craig by November 10, 2026. Submissions are limited to 25 pages and must include Standard Form 330 Part II, an Equal Employment Opportunity policy, the Arkansas DFA Illegal Immigrant Contractor Disclosure Form, and EPA certifications regarding debarment and lobbying for contracts exceeding 100,000 dollars. Additionally, firms must maintain active registration in SAM.gov and demonstrate a commitment to DBE goals through six good faith efforts in subcontracting per 40 CFR 33.301.
Community Development

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 4 hours ago

DEADLINE

N/A

General Info

Contract Value

$385,023.6

NAICS

541330 - Engineering Services

Place of Performance

MD

Set-Aside

NONE

Award Issued Date

Documents

1

RFI_Questions_Responses_16_July_2019.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 22, 2019 to Jul 31, 2019. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Baltimore
Contacts2 people available
OfficeBALTIMORE, MD, 21201-2526, USA
Office AddressBALTIMORE, MD, 21201-2526, USA
Contacts
Erica EatonContract Specialist
Leigha ArnoldContract Specialist

Full Description

Show more
CONTRACT INFORMATION: In accordance with the Brooks Act, FAR Subpart 36.6, AFARS 5136.6 and U. S. Army Corps Engineers Acquisition Instruction (UAI) 36.6, the U.S. Army Corps of Engineers (USACE) Baltimore District (NAB), contemplates the award of six (6) $40M, five-year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ), for Architect-Engineer (A/E) services. There is no requirement for firms to be TS-FCL cleared under this procurement. Majority of the work considered under these contracts will not require a clearance. Offerors who possess a TS-FCL at the time of posting are encouraged to provide this information in their submittal. If a future project requires a TS-FCL clearance, firms may be sponsored with the assistance of USACE-NAB. The ordering period will be five years from award. All task orders awarded under this A/E IDIQ will be Firm-Fixed-Price. This requirement will be procured under Full and Open Competition. The award of these follow-on A/E IDIQs will assist USACE-Baltimore District in meeting the larger District-wide design and engineering requirements for both its intelligence community as well as other stakeholder communities within the NAD area of responsibility (AOR); with exception of Europe or other oversees locations. The awards will be made under North American Industry Classification System (NAICS) code 541330, Engineering Services, with a small business size standard of $15M in average annual receipts. To be eligible for a contract award, a firm must be registered in the System for Award Management (SAM) at https://www.sam.gov. Inherently governmental functions will not be performed by contractors per FAR Part 7.5 and Office of Federal Procurement Policy Letter 92-1. (1) PROJECT INFORMATION: The work may consist of A/E Services capabilities, including but are not limited to: services within the range of A/E Services as defined by 40 U.S.C. 1102 and FAR 2.101. The work may consist of comprehensive A/E services for renovation or new construction projects including but not limited to: preparation of full plans and specifications, preparation of design-build requests for proposals, construction cost estimating, site investigations, analysis, planning, master planning, National Environmental Policy Act (NEPA) documentation, programming (1391), topographic and utility surveys, geotechnical investigations, permitting, charrettes, Building Information Modeling (BIM), energy modeling, and the preparation of reports, studies, design criteria/ design analysis documents, Leadership in Energy and Environmental Design (LEED) documentation, value engineering, presentations, coordination with various government agencies and commissions, and other general A/E services. The work may also include providing construction phase and other support services including, but not limited to shop drawing reviews, site visits, technical assistance, LEED documentation during construction, on-site representation, preparation of operation and maintenance manuals, and commissioning/start-up/fit-up design support. The scope of projects may include but are not limited to: new construction, interior and/or exterior building renovations; heating, ventilation, and air conditioning (HVAC) upgrades; electrical upgrades; paving; and utilities and infrastructure. Facility types may include, but are not limited to: administration and training facilities, vehicle and pedestrian access control points, warehouses, community support facilities, military testing facilities, troop housing, recreational and physical fitness facilities, child development facilities, medical and non-medical laboratories, and research facilities for military and other non-military government agencies. The IDIQ(s) will be used to support military construction (projects over $1,000,000), sustainability, restoration, and modernization (SRM), and Interagency and International (IIS) projects in accordance with DFARS 219.502-1 and DFARS 219.502-2. Each task order will have its own schedule based on the complexity of the applicable project. Task Orders will be evaluated based on level of effort for the scope of services developed for individual projects in accordance with FAR 16.5. Task Orders will be issued during the ordering period of the IDIQs and may extend beyond the five year IDIQ ordering period. (2) SELECTION CRITERIA: The offeror (and its' subconsultants) must demonstrate its qualifications with respect to the published evaluation criteria below. Evaluation and selection will be based on the most highly qualified firm upon evaluation of the selection criteria stated herein. Selection of the most highly qualified firms for negotiations shall be made based on demonstrated competence and qualifications necessary for the satisfactory performance of the type of professional services required, that include, in the following order of importance: (1) professional capabilities; (2) specialized experience and technical competence; (3) capacity; (4) past performance; (5) knowledge of the locality; and secondarily may include (1) small business participation plan; and (2) volume of DoD contracts. The small business participation plan, as a secondary criterion, will not be applied by a pre-selection board, and will only be used by a selection board as a "tie-breaker" if necessary, in ranking the most highly qualified firms. The A/E selection procedures will be in accordance with FAR 36.6, A/E Services; DFARS 236.6, Engineering Pamphlet (EP) 715-1-7, SCO and local guidance. Interviews will be conducted in Baltimore, MD for A/E firms identified by the Selection Board. Factor 1 - Professional Capabilities: Offerors will be evaluated on professional qualifications and competence of the proposed key personnel to provide services to accomplish the work required under this contract. The firm must have registered and licensed personnel (acceptable certification/licensure listed in parenthesis, except for those specified below), either in-house or through consultants, in the following list of key disciplines: Project manager (PE, RA), Architect (RA), landscape architect (PLA, RLA), interior designer, civil engineer (PE), electrical engineer (PE), structural engineer (PE), mechanical engineer (PE), fire protection engineer, communications engineer, anti-terrorism/force protection (AT/FP) engineer, environmental engineer, geotechnical engineer (PE), cost engineer, commissioning specialist, land surveyor (PLS), certified value specialist (CVS), construction manager, and certified industrial hygienist. The evaluation of these disciplines will consider education, training, overall and relevant experience, and longevity with the firm. No more than two (2) resumes shall be allowed per discipline, per the requirements listed below. The Anti-Terrorism/Force Protection Engineer shall be a licensed professional engineer and have experience and training related to compliance with Department of Defense AT/FP policy standards and specifications, i.e., UFC 4-010-1. The Communications Engineer shall be a licensed professional engineer or a registered Communications Distribution Designer (RCDD). The Interior Designer must be certified by the National Council of Interior Design Qualifications (NCIDQ), or licensed interior designer. The Cost Engineer shall be a certified cost professional (CCP), certified estimating professional (CEP), Certified Cost Consultant (CCC), Certified Cost Engineer (CCE), or have comparable certification, as well as experience with cost estimating software, specifically MII. The Fire Protection Engineer shall be a registered fire protection engineer (PE), and shall have a degree in Fire Protection Engineering from an accredited university. The name of the accredited university shall be referenced in the resume provided. The Certified Value Engineer must be accredited by SAVE International as a certified value specialist (CVS). The Construction Manager shall be a licensed professional engineer. The Environmental Engineer shall hold a degree in environmental/civil engineering, and shall be a licensed professional engineer. The Certified Industrial Hygienist shall hold a CIH from the American Board of Industrial Hygiene. The Lead Commissioning Specialist shall be a licensed professional engineer with a minimum of five years of commissioning experience, and shall have one of the following certifications: ASHRAE Commissioning Process Management Professional (CPMP), ASHRAE Building Commissioning Professional Certification (BCxP), Building Commissioning Association (BCA), National Environmental Balancing Bureau (NEBB), AABC Commissioning Group (ACG), or Association of Energy Engineers (AEE). The commissioning specialist shall also have documented experience as the lead person responsible for commissioning of building systems of similar type, scope, and complexity and must have at least two projects for which the individual was the documented commissioning authority for a LEED certified project. The Lead Commissioning Specialist must lead and oversee the commissioning work specified herein and be the primary point of contact for the Government regarding the commissioning work. Where a single individual does not have the required experience in commissioning of mechanical systems, electrical systems, and building envelope the Lead Commissioning Specialist shall engage Technical Commissioning Specialists in the required systems. The availability of additional personnel in the key disciplines shall be presented in Section H to ensure that the firm can meet the potential of working on multiple task orders for multiple customers in the required timeframes. Factor 2 - Specialized Experience And Technical Competence: The firm must demonstrate specialized experience and technical competence in the following types of projects and/or work products which are listed in descending order of importance: (1) Design of new construction projects and/or renovation of existing facilities of various types and sizes; (2) Application of cost control through appropriate design and construction techniques on projects to assure projects remain within budget (cost estimating and MII); (3) Preparation of design build request for proposals; (4) Preparation of project programming documents such as master planning studies, DD Forms 1391, and experience in conducting both planning and design charrettes; (5) Experience with handling multiple task orders simultaneously; (6) Experience of the prime firm and significant subcontractors in working together; (7) Analysis and implementation of anti-terrorism and force protection (ATFP) requirements; (8) Obtaining of all necessary Federal, State or local jurisdiction permits; (9) Experience with storm water management and erosion and sedimentation control in various jurisdictions; (10) Analysis, documentation, and implementation of LEED criteria and Energy modeling; (11) Experience in the use of BIM and USACE Advanced Modeling contract requirements.; (12) Topographic surveys, soil surveys, and subsurface exploration including associated testing; (13) Coordination with, submissions and presentations to the State Historic Preservation Offices, National Capital Planning Commission, and the Commission of Fine Arts; (14) Asbestos and lead paint surveys and testing services. Firms shall provide up to ten (10) projects within the last seven (7) years demonstrating their experience in the types of projects and products as described in Section 1: Project Information and show specialized experience of the proposed team in provision of the services noted above. Non-DOD and commercial contracts can be included as project examples. If the sub-criteria, i.e. Number 4 above, speaks to DOD-specific requirements, the offeror shall demonstrate how they have executed similar requirements for the non-DoD and commercial projects. All projects provided in the SF 330 must be completed by the office/branch/regional office actually proposed to manage and perform work under this contract. If the Offeror is a joint venture (JV), relevant project experience should be submitted for the joint venture if shared experience is available; if no shared experience is available, offers may submit projects performed by either joint venture partner. Do not list an IDIQ contract as an example of a completed project. Instead, list relevant completed task orders (For multiple task orders that cover multiple project phases, each task order can be considered one project.), or standalone contract awards that fit within the definition above. Examples of project work submitted that do not conform to this requirement will not be evaluated. Factor 3 - Capacity: Firms must demonstrate their ability to meet schedule, scope, and budget on multiple concurrent projects by providing appropriate teams and adequate staff to perform the services required by the IDIQ contract. Factor 4 - Past Performance: Offerors shall submit past performance evaluations as it relates to cost control, quality of work, customer satisfaction, compliance with performance schedules, and compliance with utilization of small business concerns and small business sub-contracting plans. This information will be obtained by the Contractor Performance Assessment Reporting System (CPARS), evaluations provided by the offeror, retrieving evaluations from the Performance Information Retrieval System (PPIRS), and/or reviewing past performance questionnaires (PPQs) in the approved Naval Facilities Command (NAVFAC) format submitted by the Offeror. PPQs not submitted in the approved format will not be evaluated. Offerors will be evaluated based on quality, innovation, compliance with schedules, cost control, overall safety record, and stakeholder/customer satisfaction. Past performance as to utilization of small business will also be considered. Other information provided by the firm, customer inquiries, Government databases, and other information available to the Government including information from the points of contact provided by the offeror will be considered. Failure to provide requested data, accessible points of contact, or valid phone numbers may result in a firm being considered less qualified. NOTE: Past performance information for projects listed under Factor 2 will be given greater consideration. Non-DoD and Commercial projects SHALL utilize the PPQ format to obtain past performance information. Factor 5 - Knowledge of the Locality: Firms will be evaluated on their demonstrated knowledge of the USACE NAD Area of Responsibility (AOR) and the USACE Baltimore District local conditions or project site features such as geological features, climatic conditions, local construction methods, agency coordination, permitting, and local laws and regulations. The required knowledge may be sources through the Prime or approved subcontractor. The secondary factors will be employed as "tie-breakers" among firms that are deemed technically equal, and will only be used, if necessary in determining the most highly qualified firms. The secondary factors are listed in their respective order of importance. Factor 1- Small Business Participation Plan: Firms shall demonstrate the extent of their participation with small businesses. Offerors will be evaluated in terms of their ability to successfully meet the small business participation target goals through collective small business participation from any type of small business or sub-category small business. Factor 2 - Volume of DoD Contracts: The volume of work previously awarded to the firm by DOD within the past 12 months will be evaluated in considering equitable distribution of work among architect-engineer firms. Only awards of A-E contracts will be considered, which includes awards to all branch offices of a company, except as indicated in Defense PGI 236.602-1(a)(6)(A)(2). For IDCs, the total value of task orders actually issued by agencies in the last 12 months will be considered, and not the potential value of the contracts. For all types of contracts, options that have not been exercised will not be considered. (3) SUBMISSION REQUIREMENTS: Interested firms having the capabilities to perform this work must submit three (3) hard copies and one (1) electronic copy with password protection on CD of the SF 330, (Part I, Part II) for the prime and all consultants; and one (1) electronic copy with password protection on CD of the Small Business Participation Plan no later than 11:00 AM Eastern Time, 31 July, 2019. The password for the CDs shall be submitted on the first page immediately following the cover page of the SF 330 and will not be counted as a page. The SF330 and the Small Business Participation Plan shall each be submitted as separate files using Microsoft Word (.doc) or Adobe Acrobat (.pdf). Font size shall be 10 or larger. The SF330 Part 1 shall not exceed 110 pages (8.5" x 11"). Each printed side of a page will count as a page. The Part II and CPARS/PPQs ARE NOT included in the total page count. When utilizing 11" x 17" fold-outs for charts, diagrams, graphs, tables, exhibits, figures, etc.; it will be considered two (2) pages if both sides are used. Section H may not exceed a total of 15 pages. Solicitation packages are not provided and no additional project information will be given to firms during this announcement period. Request for Information (RFI)s should be sent to the Contract Specialist, Erica Eaton, at contact@example.gov by 9 July 2019 . All responses to these RFIs will be posted as an amendment to this combined soliciation/synopsis by 16 July 2019. When applying for the $240M A/E IDIQ, identify submissions as: MULTI-DISCIPLINE ARCHITECT/ENGINEER SERVICES FOR MILITARY PROJECTS IN THE BALTIMORE DISTRICT, U.S. ARMY CORPS OF ENGINEERS $240M A/E IDIQ. Point of Contact Erica Eaton contact@example.gov U. S. Army Corps of Engineers, Baltimore District, Contracting Division 2 Hopkins Plaza, Baltimore, MD 21201 +1 (555) 000-0000 Mailing Address U.S. Army Corps of Engineers, Baltimore District ATTN: Erica Eaton Contracting Division 2 Hopkins Plaza, Baltimore, MD 21201 +1 (555) 000-0000 Place of Performance The contracts will be used for projects within USACE's North Atlantic Division's geographic area of responsibility (AOR); with exception of Europe or other oversees locations.

More opportunities from Department Of Defense → W2SD Endist Baltimore

Same awarding agency

NAICS: 237990
New
Federal
Mid-Bay James Island Restoration Phase 2
Solicitation # W912DR27BA001
The Mid-Bay James Island Restoration Phase 2 is a firm fixed price construction project managed by the U.S. Army Corps of Engineers, Baltimore District. Located in Dorchester County, Maryland, this ecosystem restoration effort takes place in a remote area of the middle Chesapeake Bay accessible only by boat. The project has an estimated magnitude of construction between 150 million and 250 million dollars, with an anticipated period of performance of 1095 calendar days from the date of the Notice to Proceed. The scope of work involves three primary features: the installation of approximately 22,000 linear feet of perimeter dikes using stone, geotextile, and sand; the excavation and stockpiling of approximately 650,000 cubic yards of sand from a local borrow area; and the installation of spillway structures for controlled water release. Key material requirements include various weights of armor stone ranging from 450 to 3300 pounds. The contractor is responsible for all labor, equipment, and transportation, and must maintain a Quality Control Manager on-site at all times. Administrative requirements include the submission of bids via the Procurement Integrated Enterprise Environment portal in searchable PDF format. Award evaluations include a 10 percent price preference for HUBZone small business concerns. The contract mandates strict adherence to safety and environmental regulations, including EPA 40 CFR 112 for POL products and EM 385-1-1 for safety and health. Additionally, the contractor must conduct formal partnering sessions within 35 to 45 days of the award and provide necessary performance and payment bonds.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS