Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Multi-Family Residential Construction (Townhomes)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Multi-Family Residential Construction involves the vertical construction of two separate buildings consisting of eight three-story townhomes for the Contra Costa County Department of Conservation and Development. The scope of work includes the installation of framing, roofing, HVAC, electrical, and plumbing systems to deliver eight fully habitable residential units. All construction must strictly adhere to the California Building Code, Title 24 Energy Efficiency standards, and the specific access requirements set by the Contra Costa County Fire Protection District. The project is located in California within the 94803 zip code and falls under NAICS code 236115.

General Info

Subcontract for vertical construction of eight three-story townhomes in Contra Costa County, California.

Agency

California → Contra Costa County

Place of Performance

CA, 94803

Set-Aside

NONE

Documents

This scope was carved out of CDDP22-03021.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Ali Carriage Rental Homes – Development Plan project for construction of 8 townhomes, County file #CDDP22-03021

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa County
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Contra Costa County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Constructs two separate buildings containing eight three-story townhomes for prime contractors on Contra Costa County Department of Conservation and Development projects. Performs vertical construction complying with California Building Code (CBC), Title 24 Energy Efficiency standards, and Contra Costa County Fire Protection District access requirements. Installs framing, roofing, HVAC, electrical, and plumbing. Delivers eight completed, habitable townhomes.

Similar Contracts

Same NAICS industry code

NAICS: 236115
New
Double Door Replacement & Install Panic Hardware
Solicitation # AT2025-012
Solicitation AT2025-012 is a request for a single lump sum contract to perform door and hardware replacements at the Atterbury Job Corps Center in Edinburgh, Indiana, operated by Adams and Associates for the U.S. Department of Labor. The scope of work includes replacing exterior double doors in kind with new HM doors, including heavy-duty panic hardware, closers, latch and strike plates, and thresholds at building 1041, as well as replacing existing locksets with ABA/ADA compliant heavy-duty panic hardware at buildings 1042 and 1089. All work must be painted to match existing finishes and includes a one-year guarantee of workmanship and manufacturer warranties. This is an SBA set-aside solicitation open to various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone. A mandatory site visit was scheduled for November 4, 2026, with a proposal deadline of November 16, 2026. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The project is subject to Davis-Bacon Act WD # IN20260002 and requires contractors to hold a valid Indiana state license and provide specific automobile and workers compensation insurance naming Adams and Associates as an additional insured. Performance must begin within 14 days of the Notice to Proceed, with a sequenced construction schedule due within 10 days. Final acceptance requires a substantial completion walk-through, the submission of a completed SF 1413, certified payroll records, and a release of liens. Payment terms are Net 30. Proposals must be submitted on company letterhead and include a detailed cost breakdown, a timeline for completion, a W9, and a completed vendor questionnaire.
Atterbury Job Corps. – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 11 days
View Details
NAICS: 236115
New
26-139 Panic Hardware Installation & correcting egress door swing
Solicitation # 26-139
Solicitation 26-139 is a subcontracting opportunity for the Atterbury Job Corps Center in Edinburgh, Indiana, operated by Adams and Associates, Inc. The project requires the modification of exit doors at four electrical rooms to correct non-compliant door swings and clearances. The scope of work includes removing existing commercial door leaves, frames, hinges, and hardware, and reinstalling them to ensure doors swing outward in the direction of egress. The contractor must install listed and labeled panic hardware that allows for a full 180-degree swing without encroaching on required corridor widths or electrical working clearances, ensuring compliance with NFPA 101 Life Safety Code, NFPA 70 National Electrical Code 2020, and OSHA regulations. This is a single lump sum contract awarded based on best value rather than the lowest price. Bidders must have a valid Indiana Contractor's License and provide a detailed cost breakdown, a timeline for substantial completion, and proof of required automobile and workers compensation insurance. Mandatory requirements include a site visit and pre-bid walk-through. Proposals must be submitted on official company letterhead and include a completed Vendor Questionnaire, W9, and certification of conformity to Davis Bacon Act Wage Rate decisions. Payment terms are Net 30, and the contractor must provide a sequenced construction schedule within 10 days of receiving a Notice to Proceed.
Atterbury Job Corps. – Adams & Associates

POSTED

about 2 hours ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS