Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on April 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Municipal District of Bonnyville No. 87 - Request for Proposal - Kinosoo Chalet Siding Replacement

Closed
AB-2026-03401International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238170
New
Federal
Youghiogheny Resource Managers Building Siding Replacement
Solicitation # W911WN26QA059
The U.S. Army Corps of Engineers, Pittsburgh District, is set to replace the exterior siding on the Resource Managers Office building at Youghiogheny River Lake in Confluence, Pennsylvania. The existing T1-11 plywood siding and asphalt-saturated fibrous sheathing will be fully removed and replaced with a new exterior wall assembly consisting of APA-rated structural wood sheathing, a continuous weather-resistive barrier, 3/8-inch preservative-treated wood furring strips spaced no more than 16 inches on center, and 5/16-inch fiber cement lap siding. The new assembly is designed to match the existing wall thickness of approximately 1-1/8 inches to ensure compatibility with current window and door openings, which will not be relocated or modified. All trim elements must be fiber cement, and the balcony handrail will be replaced with capped PVC or composite decking matched to the new siding color. Proper flashing, including Z-flashing and kick-out flashing, must be integrated into the weather-resistive barrier to maintain a continuous drainage plane, with all fiber cement siding edges properly supported by framing or blocking per manufacturer specifications. The building’s timber-frame structure and concrete foundation will remain intact, with work focused exclusively on the exterior cladding system. The project must be completed within 180 days of receiving written notice to proceed and is solicited as a 100% small business set-aside under NAICS code 238170, with a size standard of $19 million in annual revenue. The solicitation, identified as W911WN26QA059, will be issued on or about August 19, 2026, via the Procurement Integrated Enterprise Environment (PIEE) and posted on SAM.gov, with no hardcopies available. Interested contractors must be registered in both the System for Award Management (SAM) and PIEE with the Proposal Manager role, maintaining active status throughout the bidding and award process. Registration in SAM requires entity validation and can take up to ten business days to activate, and must be renewed annually. Additional registration steps for PIEE include creating a user account, assigning roles, and providing a CAGE code and justification. Questions regarding the solicitation should be directed to Aaron Barr or Connie L. Ferguson at the Pittsburgh District office.
W072 Endist Pittsburgh

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 238170
New
SLED
FY27 NE Kirksville Maintenance Building Metal Siding Project
Solicitation # MODOT 0000000395SL
The Missouri Department of Transportation (MoDOT) is soliciting bids for the FY27 NE Kirksville Maintenance Building Metal Siding Project, identified by solicitation number MODOT 0000000395SL. The project involves the removal of existing vinyl siding and the installation of new 26-gauge prefinished metal siding at the Kirksville Maintenance Building in Missouri. Bids must be submitted by September 17, 2026, through MissouriBUYS or via physical delivery through mail, UPS, or FedEx. Bidders intending to submit hard copies must notify the buyer, Logan Wilbers, via email five business days before the closing date. Attendance at a site visit is mandatory for any bid to be accepted. The contract emphasizes strict adherence to technical specifications and administrative procedures. Key requirements include the submission of an initial project schedule within 15 days of the Notice to Proceed and the delivery of operation and maintenance manuals in specific binder formats. Contractors are responsible for providing product data, shop drawings, and samples for review, as well as delivering spare parts and transferable warranties prior to final payment. Final acceptance by MoDOT is contingent upon the completion of all punch list items and the submission of all closeout documentation within 30 days of project completion, with failure to comply potentially leading to debarment.
MODOT TRANSPORTATION

POSTED

4 days ago

DEADLINE

in 27 days

AI Contract Overview

Show more

The Municipal District of Bonnyville No. 87 is soliciting proposals to replace the siding on the Kinosoo Chalet and address any concealed damage discovered beneath the existing surface. The contractor must handle all aspects of the work including removal and proper disposal of the current siding, thorough inspection of the underlying sheathing, framing, and moisture barriers, and reporting any hidden structural or water damage. Any necessary repairs to the substrate must be performed only after receiving approval from the Owner, followed by the full installation of a new siding system complete with weather barriers, flashing, trim, and sealants. The work must seamlessly integrate with existing doors, windows, vents, and other penetrations while adhering strictly to all applicable building codes and standards. Additionally, the contractor is responsible for providing all labor, materials, equipment, and supervision, as well as ensuring complete site cleanup and responsible disposal of all waste materials. Proposals must be submitted by May 29, 2026, at 3:00 PM, under solicitation number AB-2026-03401, with the request published on April 29, 2026. The project is managed by the Municipal District of Bonnyville No. 87, a government entity located in Alberta, and the primary point of contact is Amber Ozaruk, the Contracting Authority. The work will take place at the Kinosoo Chalet in Alberta, and all bidders are expected to demonstrate the capacity to deliver high-quality, code-compliant results while maintaining the integrity of the structure throughout the renovation process.

General Info

Replace Kinosoo Chalet siding in Alberta, repair hidden damage, comply with codes, submit proposal by May 29, 2026.

Agency

Government of Canada → Municipal District of Bonnyville No. 87View Agency

NAICS

238170 - Siding ContractorsView NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Municipal District of Bonnyville No. 87
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Municipal District of Bonnyville No. 87
View Agency Profile
Office AddressN/A
Contacts
Amber OzarukContracting Authority

Full Description

Show more
KRR is accepting bids for replacing the Siding on its Chalet and repairing any and all damages found beneath the surface. The successful proponent will be responsible for all labour, materials, equipment, and supervision required to complete the siding replacement, including but not limited to: -Removal and disposal of existing siding and related materials -Inspection of underlying sheathing, framing, and moisture barriers -Identification and reporting of any concealed damage -Repair or replacement of damaged substrate as approved by the Owner -Supply and installation of new siding system -Installation of required weather barriers, flashing, trim, and sealants -Integration with existing doors, windows, vents, and penetrations -Compliance with all applicable building codes and standards -Site cleanup and proper disposal of all debris