Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Municipal District of Taber was posted on July 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Municipal District of Taber - Request for Proposal - RFP - RR18-0 & RR18-2 Upgrades - EX202603

Awarded
AB-2026-04937International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1&2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessment and permitting support. Additional requirements include hazardous materials surveys, CPM scheduling, and commissioning and startup planning. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a bid date of September 11, 2026. The solicitation specifically targets Disadvantaged Business Enterprises (DBE), Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and Other Business Enterprises (OBE), requiring certification from recognized agencies such as the SBA or MBDA. Responsive bidders must hold a valid California Contractor's license, provide acceptable insurance, and secure bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit, a signatory to multiple collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 9 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending gravity sewer mainlines, decommissioning existing pump stations, and installing service laterals for properties currently using onsite septic systems. The scope may also include transportation improvements such as roadway reconstruction and ADA curb ramp design. This effort is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The selection process is based on a scoring system evaluating project understanding, team qualifications, and firm experience, with the goal of advertising for construction services in Fall or Winter 2027. Key deliverables include a preliminary engineering report, public outreach plans, and construction contract documents at various completion percentages. Parametrix is actively soliciting firms with federal, tribal, state, or local DBE certifications as part of a good faith effort to include small, minority, women-owned, and veteran-owned businesses. Proposals are due by September 29, 2026, and must adhere to strict formatting and submission guidelines via the designated procurement portal.
Parametrix

POSTED

about 1 hour ago

DEADLINE

in 9 days
NAICS: 541330
New
College Park East Stormwater Infrastructure Design Services - Seal Beach, CA
Solicitation # CIP SD2601
The City of Seal Beach is soliciting professional engineering and environmental design services for the College Park East Stormwater Infrastructure Project (CIP SD2601) to mitigate chronic flooding in the College Park East neighborhood. The selected firm will be responsible for conducting a comparative evaluation of pump station siting alternatives at Ironwood and Aster Park, managing CEQA and NEPA environmental compliance, and developing shovel-ready construction documents, including 60 percent, 90 percent, and 100 percent plans, specifications, and estimates. This project is funded in part by a U.S. EPA Community Project Funding award and is subject to federal procurement standards under 2 CFR Part 200, as well as California Labor Law and prevailing wage requirements. Selection is based on a qualifications-based process consistent with the Brooks Act and California Government Code Section 4526, with evaluation weights focused on scope understanding and delivery (40 percent), team qualifications (25 percent), and project approach (25 percent). The contract is estimated at 1.3 million dollars and will be administered on a time-and-materials basis with a not-to-exceed cap. Proposals are due by September 22, 2026, at 2:00 PM PST. The successful consultant must provide monthly detailed invoicing and adhere to strict quality assurance and constructability review standards to ensure public safety and regulatory compliance.
PACIFIC Advanced Civil Engineering, Inc.

POSTED

about 1 hour ago

DEADLINE

in 8 days
NAICS: 541330
New
Federal
Engineering Services-T-ESD and ESB Class Alteration Design Support
Solicitation # N3220526Q7266
Solicitation N3220526Q7266 is a Firm Fixed Price request for professional engineering services to support the Military Sealift Command in developing two approved TRANSALT work packages for T-ESD and ESB Class vessels. The scope of work includes upgrading sludge transfer pumps to increase capacity and modernizing engine room bridge cranes by replacing obsolete components. Key deliverables consist of Ship Check Reports and TRANSALT Work Packages, which must undergo a multi-stage review process including P1, P2, and final revision stages. The period of performance is scheduled from September 28, 2026, to March 8, 2027, with work performed at the contractor's facility, MSC Norfolk, and onboard the vessels. This opportunity is restricted exclusively to SEAPORT NXG MAC holders and is a 100% set-aside for Small Business HubZone and SDVOSB firms under NAICS 541330. Proposals must be submitted via the PIEE Solicitation Module by September 23, 2026. Evaluation is based on technical capability, and the contractor must provide key personnel, including a Project Manager with a B.S. degree and at least five years of relevant shipboard experience. Additionally, the contractor must maintain an active SAM registration and provide proof of Cybersecurity Maturity Model Certification Level 2. Payment will be processed electronically through the Wide Area WorkFlow system.
Mschq Norfolk

POSTED

about 17 hours ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The Municipal District of Taber is seeking proposals from consulting firms for the design, permitting, tendering, and construction management of road upgrades for Range Road 18-0 and 18-2. Located northeast of Enchant, Alberta, the project involves upgrading five miles of roadway to accommodate heavy haul traffic from adjacent confined feeding operations. The primary objective is to widen the existing 7.0 meter roadway to an 11.0 meter platform within a 30.0 meter right-of-way to improve structural capacity, drainage, and safety while minimizing long-term maintenance costs. The selected consultant will be responsible for a comprehensive scope of work including project management, preliminary engineering, geotechnical investigations, and detailed design. Key requirements include managing right-of-way acquisition, conducting environmental evaluations in accordance with Alberta government standards, and preparing all tender documentation. The consultant must also provide construction supervision, contract administration, and as-built documentation. The project aims for construction completion by early 2027, requiring a flexible execution strategy and a phased construction plan to manage regulatory approvals and environmental constraints efficiently.

General Info

Consultant needed for road upgrades and construction management for Range Roads 18-0 and 18-2.

Agency

Municipal District of TaberView Agency

Contract Value

$204,095

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Taber, AB, CAN

Set-Aside

NONE

Awardee

McElhanneyView Profile

Award Issued Date

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMunicipal District of Taber
Contacts1 person available
OfficeN/A
Organization / Agency
Municipal District of Taber
View Agency Profile
Office AddressN/A
Contacts
Craig AmblerManager of Public Works and Infrastructure

Full Description

Show more
General Information The Municipal District of Taber (MD) is seeking competitive proposals from consulting firms to develop the complete design, permitting, tendering and construction management for the Range Road (RR) 18-0 & 18-2 Upgrades project. The Consultant shall develop a design that accommodates current and projected heavy haul traffic demands and minimizes long-term maintenance costs. Project Overview Adjacent confined feeding operations (CFO) in the area have presented challenges to the MD’s infrastructure, including higher-than-typical heavy haul traffic, drainage impacts, and accelerated degradation of the existing gravel surface. Improvements are needed along the noted roadway to address structural capacity, cross-sectional width, and long-term maintenance requirements. The 5 miles of road upgrades are located northeast of Enchant AB. The south project extents begin at Township Rd (TWP) 15-0 and move north on RR18-0 and RR18-2 for 3 and 2 miles respectively and as shown in the image above. The project involves widening an existing gravel road to improve safety, drainage, and traffic capacity. The work is anticipated to include survey, geometric design, drainage review, material recommendations, and construction oversight. The existing roadway is approximately 7.0 m wide within a 20.0 m right-of-way. The proposed design shall accommodate an 11.0 m roadway platform within a 30.0 m right-of-way. Scope of Work The selected consultant will be responsible for: 1. Project Management and Coordination • Project initiation and planning • Coordination with MD and local stakeholders • Schedule development and management • Budget tracking and reporting • Quality assurance and control procedures 2. Preliminary Engineering • Right-of-way acquisition support o Determine widening requirements to increase ROW by 5 m each side o Prepare legal survey plan required for acquisition • Review of existing data (topography, hydrology, land use) • Preliminary alignment and grading concepts • Traffic accommodation strategy (if applicable) • Desktop Environmental Evaluation (EE) as per the Government of Alberta’s 2025 Terms of Reference • Site visit to verify environmental conditions • Coordination with Alberta Environment and Protected Areas including Wetland Assessment and Impact Reporting (if required) • Historical Impact Assessment (if required) • Preparation of environmental documentation for approvals • Pipeline crossing investigation and agreements 3. Geotechnical Investigation • Geotechnical Investigation o Air photo interpretation and literature review o Borehole drilling and soil sampling o In-situ testing and groundwater monitoring o Laboratory testing and geotechnical reporting 4. Detailed Design • Final road alignment and profile • Cross-section and grading design • Drainage and culvert design • Granular base course specifications • Erosion and sediment control measures • Preparation of construction drawings and specifications 5. Tender Package Preparation • Development of tender documents • Cost estimation and quantity take-offs • Assistance with bid evaluation (if requested) • Compliance with Alberta Infrastructure deliverable standards (CAD, BIM, specs) 6. Construction Supervision and Contract Administration • Regular site inspections, including attendance at critical construction milestones and submission of written progress reports. • Contractor coordination and issue resolution • Survey services including: o Topographic survey o Construction layout o Quantity and massing surveys o Verification of major project milestones, including culvert elevations and critical drainage features o Legal survey support associated with right-of-way acquisition • Progress payment certification • Final inspection and deficiency resolution • As-built documentation 7. Deliverables • Preliminary and final design reports • Schedule with milestones for all stages of design and implementation. • Environmental evaluation report • Geotechnical investigation report • Tender documents • Construction drawings and specifications • As-built drawings Project Goals, Requirements and Expectations • This project aims to provide a road that can adequately withstand the heavy traffic associated with the CFOs in their area. • The Proponents shall include the cost of a Desktop Environmental Evaluation, one site reconnaissance assessment, wetland screening, and regulatory review. The following items shall be identified as separate provisional costs: o Wetland Assessment and Impact Reports (WAIR) o Historical Resources Impact Assessments (HRIA) o Species-at-risk surveys o Wildlife and nesting bird surveys o Fisheries Act authorizations o Water Act approvals o Environmental monitoring during construction o Environmental offsets, compensation, or replacement fees The Consultant shall identify any additional environmental requirements discovered during the project and provide associated costs for MD approval prior to proceeding. Provisional items are to be clearly identified and separately priced within the fee proposal. • The MD of Taber is intending on completing the construction in early 2027 (earlier if possible), design and regulatory approvals should therefore be completed as soon as possible. Recognizing that environmental and regulatory constraints may impact the construction schedule, the MD is open to a flexible execution strategy while managing costs efficiently. The proposed Preliminary Design must incorporate a clear, viable phased construction plan. This plan should demonstrate how the project can be effectively managed and delivered in stages to accommodate necessary approval timelines or specific seasonal/environmental work windows. • The successful Proponent shall complete all engineering, environmental, and tender documentation with the objective of delivering a constructible project that can be tendered and completed within the MD’s approved budget. The Proponent shall provide updated construction cost estimates at each major design milestone and immediately notify the MD if estimated construction costs are anticipated to exceed the approved budget. Where required, the Proponent shall provide value engineering recommendations or alternative design solutions to maintain project affordability.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS