MWSD SAM WWTP Electrical System Relocation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The MWSD SAM WWTP Electrical System Relocation Project, managed by the Mid-Coastside Sewer Authority, involves emergency repairs to enhance the safety and resilience of the wastewater treatment plant in Half Moon Bay, California. The primary objective is to mitigate flood risks by relocating critical electrical equipment, specifically MB1, from the site's lowest elevation in the western corner to a higher elevation in the eastern area near the gate and parking lot. By moving this equipment above the estimated flood level of a 500-year event, the project aims to prevent facility failure and maintain essential public health, safety, and welfare services. The project is located at 1000 Cabrillo Highway North in San Mateo County and is classified under NAICS code 238210. Due to the necessity of maintaining critical infrastructure in a disaster-stricken area where a state of emergency was proclaimed by the Governor, the project has been filed with a Notice of Exemption. General Manager Kishen Prathivadi serves as the primary point of contact for the lead agency.

General Info

Relocating critical electrical equipment at Half Moon Bay WWTP to mitigate flood risks.

Agency

California → Mid-Coastside Sewer Authority

Place of Performance

Cabrillo Highway N and Bev Cunha's County Road, Half Moon Bay, CA, 94019

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Mid-Coastside Sewer Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → Mid-Coastside Sewer Authority
Office AddressN/A
Contacts
Kishen PrathivadiGeneral Manager

Full Description

Show more
The MWSD SAM WWTP Electrical System Relocation Project (project) includes several components to improve safety and strengthen resilience during extreme weather events. The elevation of existing MB1 is 14.88 feet above sea level, making it susceptible to flooding. The proposed new location of MB1 would ensure that vulnerable and critical electrical equipment would be located above the estimated flood level of a 500-year event, reducing the risk of the WWTP’s failure from flooding. These proposed activities are part of emergency repairs and include moving equipment from the site’s lowest elevation in the western corner, to the site’s eastern area, next to the gate and parking lot.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
CBP: Replacement Fiber Line
Solicitation # CBP: Replacement Fiber Line
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to replace existing multi-mode fiber optic cabling with 12 strand single mode fiber optic cabling at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The project involves removing retired aerial fiber lines and splice boxes from utility poles and building 2436, and installing new Belden FS3L0024NS 12 strand OS2 OSP fiber or an equivalent brand to provide network connectivity between the building 2436 network closet and the building 2443 maintenance office. The contractor is responsible for providing all labor, equipment, and materials, including fiber supports, ends, a rack-mounted enclosure, an adapter panel, and lift rentals. Bids are due by October 5, 2026, and must include a signed bid form and a detailed cost breakout on company letterhead. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. Awards will be based on overall best value, and bidders must provide a bid bond guarantee, cashier's check, or money order to be considered. Performance and payment bonds from a surety with at least an A- rating are required for contracts valued at $25,000 or more. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Contractors must provide a Unique Entity ID and comply with FAR regulations regarding business size certification and debarment disclosure. The project is subject to Davis-Bacon Act prevailing wage rates for building construction in Kentucky and requires adherence to strict government security and confidentiality standards for protecting sensitive information. Final acceptance of work is contingent upon satisfactory workmanship and the completion of all punch list items as approved by center and government representatives.
Earle C. Clements Job Corps Center

POSTED

about 11 hours ago

DEADLINE

in 4 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS