I. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. II. VA101V-15-Q-0079 III. The solicitation incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-77 IV. The solicitation is set aside for Service Disabled Veteran Owned Small Business concerns only. The applicable NAIC Code for this solicitation is 238210 the small business size standard is $15 Million. Wage Determination 05-2433, Rev 14 for Muskogee County Oklahoma is made a part of this solicitation by reference. V. Scope of Work: 1. The contractor shall provide all materials, labor, transportation, and testing to furnish CAT 6 plenum horizontal cabling to each location in a renovated space. In order to support the renovation of space at 125 S. Main Street, Muskogee, Oklahoma 74401, the necessary Information Technology (IT) infrastructure needs to be upgraded to CAT 6 plenum data cable. This will include horizontal CAT 6 data cable runs to each location in the renovated space. 2. A total of up to 225 data lines will need to be run from the existing communications closets on the 2nd floor to individual work stations in each specified area. 3. All cost, including provisions, delivery, installation and configuration of proposed requirements will be provided. 4. All existing CAT 5 cabling will be removed from the renovated VBA space in this building from communications closets to existing work stations. This cable will be properly disposed of by selected contractor. 5. This installation will be accomplished in two phases. First, on or about November 17, 2014 demo of existing CAT 5 and initial pull of new CAT 6 will begin. This will be in the same space and same time that the existing work stations are being removed. Second, final installation, termination of each end, installation in telecom closets and new work stations, and final testing to begin on or about December 3, 2014 and conclude December 12, 2014. 6. An as built drawing of new cable runs will be required from the selected contractor. VI. Description of Requirement Cable Installation Requirements. 1. Cable installation of up to 225 UTP plenum CAT 6 drops to 75 designated locations, including the following: install in specific VBA-approved race ways, where race ways are available; bundle and secure from the rack of origin; route and branch to the specified outlet termination location. Cable termination of installed UTP plenum CAT 6 cable pairs at rack termination shelf and outlet location end, including certification and drop labeling at rack termination shelf and with an outlet location per designated naming convention. The cable label naming convention in the closet is defined in section 4 of the VBA Regional Office Cabling Design Guideline. All changes shall be approved by the IRM Project POC. Facility Requirements 1. This cabling and cable infrastructure installation must be accomplished adhering to applicable national, state and local electrical codes and industry standards for the type of cabling used. The contractor is responsible for all necessary permits for all work associated with this project. The installed cabling must be tested and certified. The cable certification must be provided to the VBA IRM Project Lead. 2. A site project manager must be assigned during this installation to manage the daily installation activities and be the point of contact (POC) for the VBA IRM Project Lead. 3. All cabling must be placed either in the installed cable trays or in the provided conduit. In the event that neither is available, cable bundles will be neatly tied and secured with the VBA Project Lead determining that fact. A site visit is strongly recommended to evaluate existing pathways, fully understand coordination required between contractor, other trades, local VBA IRM project team and determine acceptable scheduling. Failure by the Vendor to visit the site and verify actual conditions will not be grounds for increase of cost after award. A walkthrough will be scheduled upon contractor's request. Materials to be supplied by Cabling Contractor 1. Applicable CAT 6 Plenum data cable 2. (12) 24-Port or (6) 48-Port CAT 6 Leviton patch panels 3. All applicable hardware for termination including, jacks. 4. (20) - 7' CAT 6 patch cables, Red in color, w/ molded, slim body-type boot 5. (20) - 10' CAT 6 patch cables, Red in color, w/ molded, slim body-type boot 6. (70) - 5' CAT 6 patch cables, Grey in color, w/ molded, slim body-type boot 7. (70) - 10' CAT 6 patch cables, Grey in color, w/ molded, slim body-type boot 8. (70) - 5' CAT 6 patch cables, Blue in color, w/ molded, slim body-type boot 9. (70) - 10' CAT 6 patch cables, Grey in color, w/molded, slim body-type boot VII. Period of Performance: Award Date to completion date. VIII. FAR 52.212-1, Instructions to Offerors - Commercial Items, applies to this solicitation. The following provisions and clauses are added as addenda: 52.252-1 Solicitation Provisions Incorporated By Reference (FEB 1998) 52.232-38 Submission of Electronic Funds Transfer Information With Offer (JUL 2013) VAAR 852.270-1 Representatives of Contracting Officers (JAN 2008) IX. FAR 52.212-2, Evaluation - Commercial Items, applies to this solicitation. Offers will be evaluated on price only. X. FAR 52.212-3, Offeror Representations and Certifications - Commercial Items applies to this solicitation. Offerors shall submit a completed copy of FAR 52.212-3 with its Offer. XI. FAR 52.212-4, Contract Terms and Conditions - Commercial Items applies to this solicitation. The following provisions and clauses are added as addenda: 52.252-2 Clauses Incorporated by Reference (FEB 1998) 52.232.35 Designation of Office for Government Receipt of Electronic Funds Transfer Information (MAY 1999) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) VAAR 852.203-70 Commercial Advertising (JAN 2008) VAAR 852.215-70 Service-Disabled Veteran-Owned and Veteran-Owned Small Business Evaluation Factors (DEC 2009) VAAR 852.215-71 Evaluation Factor Commitments (DEC 2009) VAAR 852.232-72 Electronic Submission of Payment Requests (NOV 2012) VAAR 852.237-70 Contractors Responsibilities (APR 1984) Fill In : State of Oklahoma XII. 52.212-5, Terms and Conditions Required to Implement Executive Orders - Commercial Items, applies to this solicitation. The following provisions and clauses are selected as appropriate to this solicitation: Paragraph b clauses applicable: (4) 52.204-10 Reporting Executive Compensation & First Tier Subcontract Awards (JUL 2013) (8) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (AUG 2013) (14) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) (19) 52.219-14 Limitations on Subcontracting (NOV 2011) (22) 52.219-28 Post-Award Small Business Program Representation (JUL 2013) (26) 52.222-19 Child Labor - Cooperation with Authorities and Remedies (JAN 2014) (27) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) (28) 52.222-26 Equal Opportunity (MAR 2007) (39) 52.223-18 Contractor Policy to Ban Text Messaging While Driving (AUG 2011) (43) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) (46) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management (MAY 1999) Paragraph c clauses applicable: (1) 52.222-41 Service Contract Labor Standards (MAY 2014) (2) 52.222-42 Statement of Equivalent Rates for Federal Hires (MAY 2014) Fill-In as follows: This is NOT a Wage Determination. Please refer to WDOL 05-2433 Rev 14 for the minimum required hourly wage rate for Muskogee OK. Telecommunications Mechanic I $32.11/HR XIII. N/A XIV. N/A XV. Offers are due not later than November 14, 2014 4:00 PM CST. Offers may be submitted electronically to
•••••@•••••.•••Sign up to see this detail Offers may be submitted by mail to the following address Department of Veterans Affairs Central Area Contracting Attn: Matt Keefe, Contracting Officer 125 S. Main Street Muskogee, OK 74401 XVI. For additional information, please contact the Contracting Officer, Matt Keefe (918)-781-7553, or by e-mail to
•••••@•••••.•••Sign up to see this detail