This Award Notice opportunity from Department Of The Interior was posted on September 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
This contract, solicitation 140P8326Q0058, is a sealed bid under the Federal Acquisition Regulation for a lighting retrofit project at Tahoma Woods Apartments within Mount Rainier National Park, specifically at addresses 55120 and 55116 238th Ave E, Ashford, WA. The acquisition is set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with a NAICS code of 238210 and a size standard of $19 million in average annual gross receipts. The scope involves replacing or retrofitting luminaires and bulbs with LED fixtures that meet strict technical specifications: all luminaires must be integrated or retrofit LED types operating on 120 VAC, carry UL or ETL listing, have a minimum lifespan of 50,000 hours, a Color Rendering Index (CRI) of at least 90 for specified models, be fully enclosed except for exterior sconces, and use Type B ballast-bypass bulbs where applicable. IC-rated fixtures are required for installations in contact with insulation, and all retrofit work necessitates removal of existing ballasts. The project must be completed within 60 days after issuance of the Notice to Proceed, with an anticipated performance period from September 14 to November 16, 2026.
The contractor is subject to comprehensive compliance obligations, including adherence to the Davis-Bacon Act under Wage Determination WA20260111, mandatory workers’ compensation insurance per Washington State law, and implementation of a site-specific safety and health plan aligned with OSHA standards. The work is further governed by special conditions such as seasonal shutdowns due to weather, for which no contract time extension is allowed, and protocols for handling any discovered archeological remains, which require immediate work stoppage and notification to the Contracting Officer. Inspections will occur on-site in accordance with FAR 52.246-12, and the Government retains the right to accept work at the project location without additional acceptance procedures. The contract requires electronic submission of quotes exclusively via email to the Contracting Officer, with no hard copies or portal uploads permitted. All submissions must include completed forms from Attachment 5, valid UEI and CAGE codes, accurate SAM.gov representations for SDVOSB status, and evidence of a valid Washington state contractor’s license. The contract will be awarded based on a trade-off process
General Info
Lighting retrofit at Tahoma Woods Apartments for SDVOSB, due August 21, 2026, electrical work under FAR 52.219-14.
HighAI Summary for 100W Replacement Soft White A19 Dimmable LED Bulb Specifications: This document provides detailed specifications for the 100W Replacement Soft White A19 Dimmable LED Enhance LED (2-Pack) light bulbs, item number OM100DM/927CA/2. Key features include a high color rendering index (CRI) of 90+, soft white glow, dimmable functionality, and suitability for various fixtures such as ceiling fans and table lamps. The bulbs have a brightness of 1600 lumens, a color temperature of 2700K, and an estimated life of 25,000 hours (approximately 22.8 years). They operate at 120 volts with an energy usage of 17.5 watts and an annual energy cost of $2.11. The bulbs are Energy Star certified, CEC compliant, and come with a 5-year warranty. Additional attributes include being suitable for enclosed fixtures, damp safety locations, and not battery operated or hardwired.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for 140P8326Q0058 Amendment 0002: Amendment 0002 to solicitation 140P8326Q0058, effective 07/23/2026. It states the solicitation is amended to post contractor Q&A’s, with no other changes made by direction of the Contracting Officer. The continuation sheet references the project to replace or retrofit lighting in Tahoma Woods apartments at Mount Rainier National Park in accordance with the attached SOW.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for 140P8326Q0058 Lighting Re-Fit T-Woods Q&A Amendment 0002: Amendment 0002 to solicitation 140P8326Q0058 for the Lighting Re-Fit T-Woods project at Mount Rainier National Park. The document provides official answers to contractor questions on scope and installation requirements, including SDVOSB set-aside status, fixture and retrofit expectations, access and occupancy, universal waste disposal, Buy American applicability, safety plan signing, and other clarifications. It states that drywall/painting is not in scope, some fixtures may be retrofitted instead of fully replaced, universal waste must be removed offsite with an inventory required, and the site-specific safety plan may be signed by one qualified on-site individual.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for 140P8326Q0058 Luminaires Technical Specifications: This document provides the technical specifications for the GUS17-4 luminaire, including field adjustability, electrical characteristics, performance, LED features, construction details, and ordering matrix. It specifies adjustable light output settings (50W/40W/30W), color temperature options, UL listing for damp locations, and compliance with IESNA LM-79 & LM-80 testing. The luminaire is DLC listed and includes details on driver specifications, dimming capabilities, power factor, surge protection, and lifespan of 50,000 hours. Construction materials, ambient temperature ratings, and warranty information are also included. The document is dated 2025 and includes contact information for technical support.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0001 to Solicitation 140P8326Q0058: This document is Amendment 0001 to Solicitation 140P8326Q0058, effective 07/23/2026. It modifies the original solicitation by adding the mandatory FAR Clause 52.219-14, Limitations on Subcontracting, by reference. No other changes have been made. The amendment requires acknowledgment by offerors prior to the specified receipt date and outlines instructions for submitting acknowledgment. All other terms and conditions of the original solicitation remain unchanged and in full force and effect.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment 12 Luminaire I - Wall Lantern Specification: This document provides detailed specifications for the District Collection One-Light Large Wall Lantern, model P5623-20. It includes physical dimensions, mounting, electrical, and lamping details. The fixture is outdoor-rated with an antique bronze painted aluminum construction. It is wall-mounted, prewired, and compatible with medium base (E26) sockets using A19 lamp types. The lantern supports incandescent bulbs up to 100 watts and LED bulbs up to 17.5 watts, fully dimmable. Additional information includes compliance with cCSAus Wet Location standards, a 1-year limited warranty, and Dark Sky compliance. The document is identified by solicitation number 140P8326Q0058.
DOCX
DOCX, High priority: read this firstprice-schedule
HighAI Summary for Attachment 5 Forms to Return with Quote - Price Schedule and Past Performance: This document, titled 'Attachment 5 Forms to Return with Quote,' includes a price schedule for a lump sum contract to replace or retrofit luminaires at Tahoma Woods Apartments as per the Statement of Work (SOW). It requires the quoter to submit a total price and provides fields for business and contact information. The document also requests detailed information on the contractor's proposed team, subcontractors, and lists of relevant experience and past performance references for both prime contractor and subcontractors. Additionally, it includes instructions for a technical approach narrative and compliance with telecommunications equipment representation requirements under FAR clauses 52.204-24 and 52.204-26. The document is essential for quote submission and contract award evaluation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment 7 Luminaires Oscar LED Ceiling OSCF Series: This document provides detailed specifications for the Oscar LED Ceiling OSCF Series luminaires, including features, construction, finish, diffuser, electrical characteristics, LED performance, certification, and warranty information. It includes ordering information with catalog numbers for different finishes and LED lumen outputs, adjustable color temperatures, and dimensions. The document is intended for use in residential, commercial, and hospitality applications, highlighting the product's compliance and warranty details.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment 8 Luminaire D ALV Series LED Vanity Specifications: This document provides detailed specifications for the ALV Series Algiers LED Vanity luminaire. It includes features such as contemporary wall mount design, construction details with 22-gauge steel back plate, and finish options in Satin Nickel or Oakley Bronze. The diffuser is made of matte white acrylic, and the electrical input supports 120-277 VAC/60Hz with compatibility for 0-10V dimmers. LED modules offer various wattages (25W, 36W, 49W) with adjustable color temperatures (3000K, 3500K, 4000K) and are rated for 50,000 hours with 90 CRI. The fixture is cETLus listed for indoor damp locations, ADA compliant for 2' and 3' models, and Title24/JA8 compliant. A limited 5-year warranty is provided. Ordering information includes catalog numbers, finishes, wattages, lumens, and dimensions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Attachment 9 Luminaire E (bulb) Technical Specifications: This document provides detailed technical specifications for the T8-7-24G-8CCT-BYP LED linear tube lamp. It includes features such as selectable color temperature (3000K to 6500K), dimmable capability, 50,000-hour lifespan, and compliance with UL, DLC, FCC, and RoHS standards. The lamp is a Type B ballast bypass tube with a 2 ft length, frosted glass lens, and G13 base. Performance metrics include wattage equivalency to 17W T8 fluorescent, input wattage of 7W, lumens output ranging from 880lm to 940lm depending on color temperature, and a color accuracy CRI of 80 or higher. The document also covers installation methods, environmental suitability, warranty terms, and packaging dimensions for cases and pallets.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Luminaire Schedule - T-Woods Apartment Buildings LED Retrofit: This document is the Luminaire Schedule for the T-Woods Apartment Buildings LED Retrofit project. It details the types, quantities, and specifications of luminaires to be installed, including mounting, finish, minimum lumens, bulb type, color temperature, and location ratings. The schedule includes a total of 304 luminaires across various types such as drum fixtures, vanity lights, undercabinet lights, downlights, linear wraps, sconces, and bulkhead styles. Additionally, the document provides a breakdown of luminaire locations per building area, specifying quantities for spaces like stairwells, storage rooms, fitness rooms, bathrooms, kitchens, and exterior areas. This schedule is critical for ensuring the correct lighting fixtures are procured and installed according to project requirements.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for RFQ 140P8326Q00058 Simplified Construction Terms and Clauses: This document is a Request for Quotation (RFQ) numbered 140P8326Q00058, titled Attachment 2 – Terms, Provisions and Clauses. It contains 34 pages detailing the schedule, solicitation/contract form, supplies or services and prices, project specifications, inspection and acceptance clauses, contract administration data, special contract requirements including wage rates and safety plans, contract clauses, list of attachments, representations and instructions, and evaluation factors for award. Key content includes the bid schedule, project specifications (SOW), inspection of construction clause (52.246-12), and instructions for submission and evaluation. The document is dated with references up to 2023 and 2025 for various clauses and certifications.
PDF
PDF, High priority: read this firstfaq
HighAI Summary for RFQ 140P8326Q0058 Attachment 1 FAQs: This document is Attachment 1, Frequently Asked Questions (FAQ), for Solicitation RFQ no. 140P8326Q0058. It provides clarifications and emphasizes key information for prospective offerors regarding the RFQ package, including participation eligibility (100% SDVOSB set-aside), estimated project value ($25,000 to $100,000), contract type (firm-fixed-price construction), site visit details, project period of performance, bond and insurance requirements, SAM registration, proposal submission instructions, and deadlines for questions. The document is intended to assist offerors in preparing their quotes and understanding solicitation requirements.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Solicitation 140P8326Q0058 - Lighting Retrofit at Mount Rainier National Park: Solicitation number 140P8326Q0058 issued on 07/23/2026 for a sealed bid invitation for bid (IFB) to replace or retrofit lighting in Tahoma Woods apartments at Mount Rainier National Park. The contract requires performance to begin within 10 calendar days and complete within 60 calendar days after award. Offers are due by 12:00 local time on 08/21/2026 and must be submitted in sealed envelopes marked with the offeror's name, address, solicitation number, and due date/time. Performance and payment bonds are required. The solicitation includes a statement of work and specifies delivery location and conditions.
PDF
PDF, High priority: read this firstsow
HighAI Summary for SOW for LED Lighting Replacement at Mount Rainier NP Apartments: This Statement of Work (SOW) outlines the requirements for replacing all existing interior and exterior lighting with LED lighting in two 8-unit apartment complexes at Mount Rainier National Park. The contractor must provide all labor and materials, including luminaires, bulbs, and electrical supplies. The project involves 264 luminaires and requires adherence to specified product approvals, electrical work standards, and safety regulations. The document includes detailed work site conditions, scheduling, and electrical requirements, emphasizing minimal disruption to residents and compliance with the 2026 NEC. A site visit is encouraged, and the contractor must complete the work within 60 days of notice to proceed.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Wage Determination for Pierce County Washington MORA T-Woods Lighting Re-Fit: This document is a wage determination for construction work in Pierce County, Washington, specifically for the MORA T-Woods Lighting Re-Fit project. It includes detailed wage rates and fringe benefits for various construction trades such as insulators, bricklayers, electricians, laborers, and operators, with effective dates ranging from 2024 to 2026. The document also references applicable Executive Orders 13706 and 13658 regarding paid sick leave and minimum wage requirements for federal contractors. The wage rates are current as of June 1, 2025, with some modifications published as recently as May 18, 2026.
PDF
PDF, Low priorityspecifications
LowAI Summary for Attachment 10 Luminaire F - 5CCT LED Thin Line Down Lights Product Specifications: This document provides detailed product specifications for the 5CCT LED Thin Line Down Lights - Round, available in five sizes. It includes features such as TRIAC dimmable, adjustable color temperature (2700K to 5000K), wet location listing, and a 50,000-hour lifespan. The document also lists technical specifications including input voltage, output power, lumen output, CRI, and certifications (cETLus, Energy Star). Additional information covers optional construction plates and a non-dimmable 347V step-down transformer with its specifications and approvals. The document is intended for use in remodel and new construction applications.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.