Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Nakano Project (EIR22-001)

Forecast
EPIMS-SDO-47179-R5State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Nakano Project involves a Property Tax Exchange Agreement and the subsequent annexation of a 23.8-acre site from the City of Chula Vista to the City of San Diego. This transition allows for the development of 221 multifamily dwelling units, including townhomes, duplexes, and detached condominiums, along with associated infrastructure such as trail and park access, two biofiltration basins, a modular wetland unit with a detention vault, and upgraded storm drains. The project is governed by Environmental Impact Report No. EIR22-0001 and requires compliance with the California Environmental Quality Act and the Otay Mesa Community Plan. Key regulatory approvals include a Streambed Alteration Agreement (EPIMS-SDO-47179-R5) executed by the California Department of Fish and Wildlife to manage impacts on 0.40 acres of riparian habitat through the restoration and conservation of at least 1.20 acres. The City of San Diego has approved the annexation, pre-zoning to Residential Multiple Unit 1-1, and various amendments to the General Plan and the Multiple Species Conservation Program Subarea Plan. The project site is located east of Interstate 805 and south of the Otay River in San Diego County.

General Info

San Diego annexes 23.8 acres for 221 multifamily units and infrastructure development.

Place of Performance

Chula Vista, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS-SDO-47179-R5, pursuant to Fish and Game Code section 1602, to the project applicant, Tri Pointe Homes IE-SC, Inc. The project is limited to the development of the 23.77-acre Project site with 221 multifamily dwelling units, trail and park access, two biofiltration basins, a modular wetland unit with detention vault, and an upgraded storm drain. Project activities will create two roads across the drainage. Vegetation will be removed and the drainage will be graded at their respective locations in order to install the reinforced concrete pipe and concrete box culvert. The Project will permanently impact 0.40 acre of riparian habitat. The applicant will compensate through the restoration, acquisition, and perpetual conservation and management of a “Mitigation Site”, or several mitigation sites, containing no less than 1.20 acres of stream and stream-associated habitat within Spring Canyon.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 14 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 17 hours ago

DEADLINE

in 24 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS