Napa County Airport, Napa, Napa County, California 2026 Airport Improvement Program (AIP) Pavement Maintenance Management Plan (PMMP)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Napa County Airport 2026 Airport Improvement Program Pavement Maintenance Management Plan is a forecast project located in Napa, California. The scope of work involves conducting pavement section determination studies to identify existing sections and subgrade soils, performing pavement condition surveys to calculate the Pavement Condition Index, and executing non-destructive load tests for fatigue analysis to determine remaining pavement life. The primary objective of this plan is to establish a maintenance and reconstruction schedule designed to extend the life of pavement sections to at least 20 years based on forecast traffic. The final results will provide estimated costs for these activities, allowing the Sponsor, the FAA, and the Public Works Director to evaluate and approve the timing and type of necessary rehabilitation.

General Info

Pavement maintenance plan for Napa County Airport to extend pavement life to 20 years.

Agency

California → Napa County

Place of Performance

2030 Airport Road, Napa County, California, at the intersection of Airport Blvd. and N. Airport, Napa, CA, 94558

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Napa County
Office AddressN/A
Contacts
Mark WitsoeNapa County Airport Manager

Full Description

Show more
The project will include pavement section determination studies to identify all existing pavement sections and underlying subgrade soils, pavement condition surveys to identify surface deterioration conditions and calculate PCI, and non-destructive load tests to be used with fatigue analysis methodologies to determine deep-seated distress and remaining pavement life. This type of PMMP will provide a schedule and type of maintenance and/or reconstruction required to extend the life of the pavement sections to at least 20 years using forecast traffic. The results of the PMMP will also include estimated maintenance and reconstruction costs so that the Sponsor and FAA can evaluate timing and type of reconstruction/rehabilitation, as approved by Public Works Director.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 9 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS