NASA LaRC Potable Water Supply Construction Project

Active
NNL15569227RFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

NASA Langley Research Center (LaRC) intends to procure construction services for the "NASA LaRC Potable Water Supply, Phase 2" project located in Hampton, Virginia. The project involves four main work packages focusing on upgrading and replacing key components of the potable water distribution system. The work includes the replacement of approximately 149 potable water isolation valves across various site locations, installation of around seven Post Indicator Valves equipped with tamper switches, and addition of eight new underground valves. Additionally, the project includes replacing about 825 feet of cast iron piping with PVC to specified buildings and replacing roughly 3,200 feet of 14-inch cast iron pipe along Langley Boulevard, with construction starting no earlier than July 5, 2017. The project also requires the purchase and installation of about 45 flow meters and two ultrasonic sensors, along with relocating a valve station and installing associated cabling. This acquisition is exclusively set aside for Historically Underutilized Business Zone (HUBZone) small business concerns, with an estimated contract value between $1 million and $5 million. The contract is anticipated to be firm fixed price, with an expected release date of the Request for Proposal around February 1, 2016, and proposals due by approximately March 2, 2016. Completion is expected within 725 calendar days from the Notice to Proceed, without option periods. Prospective offerors are encouraged to attend a site visit scheduled near February 10, 2016, and to submit any technical or contractual questions in writing. The solicitation and related documents will be available on the Federal Business Opportunities website, and offerors will be responsible for monitoring the site for updates and amendments. The project will adhere to applicable FAR clauses regarding site conditions and investigations.

General Info

NASA Langley seeks HUBZone small business for potable water system upgrades in Hampton, Virginia.

Agency

N/A

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

NASA Langley Research Center, HAMPTON, VA, 23681, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A

Full Description

Show more
NASA Langley Research Center (LaRC) plans to issue a Request for Proposal (RFP) for a construction project titled "NASA LaRC Potable Water Supply, Phase 2." The required work will be performed on NASA LaRC in Hampton, VA. The content of the work includes four (4) main work packages: 1 - Replacement of approximately 149 potable water isolation valves to the facilities (133 underground, 12 in tunnels, and 4 above ground or in buildings). Approximately (7) Post Indicator Valves (PIV) are to be replaced where line sizes are increasing or where piping is exposed for replacement. The new PIVs are to be equipped with tamper switches. Approximately 8 new underground valves are to be added to the distribution system. 2 - Replacement of approximately 825' of Cast Iron (CI) pipe with PVC piping from supply lines to specified buildings. 3 - Replacement of approximately 3200' of 14" CI pipe along Langley Blvd. with PVC piping. This work will begin no earlier than July 5, 2017. 4 - Purchase and installation of approximately 45 flow meters to facilities. Installation of 2 GFE ultrasonic sensors. Purchase and installation of approximately 300' of cable on the 14" pipe after replacement. Relocate station 13 to building 1232A. This pre-solicitation synopsis is related to the Sources Sought notice ("LARCPotableWater2016") that was posted to FedBizOpps on October 16, 2015. The draft Specifications can be found in that posting, at the following link: https://www.fbo.gov/spg/NASA/LaRC/OPDC20220/LARCPotableWater2016/listing.html. This acquisition is a total set-aside, exclusively for Historically Underutilized Business Zones (HUBZone) concerns and award is restricted to HUBZone concerns. The order of magnitude for the procurement is between $1,000,000 and $5,000,000. The NAICS Code and small business size standard for this procurement are 237110 and $36.5M, respectively. The anticipated contract type is firm fixed price (FFP). The anticipated release date of the RFP is on or about February 1, 2016 with an anticipated offer closing date of on or about March 2, 2016. The firm date for receipt of bids or proposals will be stated in the RFP. Completion of contract performance is anticipated to be 725 calendar days from issuance of the Notice to Proceed (NTP) with no option periods. Final Specifications and Drawings will also be posted with the RFP. All responsible (HUBZone) sources may submit a proposal which shall be considered by the agency. NASA Clause 1852.215-84, Ombudsman, is applicable. The Center Ombudsman for this acquisition can be found at http://prod.nais.nasa.gov/pub/pub_library/Omb.html. The solicitation and any documents related to this procurement will be available via the internet on the Federal Business Opportunities (FBO) website at the following address: https://www.fbo.gov/ It is the offeror's responsibility to monitor the FBO site for the release of the solicitation and amendments (if any). Potential offerors will be responsible for downloading their own copy of the solicitation and amendments (if any). FAR 52.236-27 Site Visit (Construction) (Feb 1995) Alternate I (Feb 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of the solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. A site visit will be scheduled on or about February 10, 2016, further instructions will be provided in the IFB. All contractual and technical questions must be submitted in writing to Ryan Bradley at ryan.d.bradley@nasa.gov. Telephone questions will not be accepted.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction effort for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers, manholes, and various site improvements including stormwater facilities, fencing, and paving. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 10, 2026, and must include a bid bond, a completed bid form, and evidence of authority to sign. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and insurance from companies with an A.M. Best rating of A-VII or better. Performance is measured by the Engineer's issuance of a Certificate of Substantial Completion, with technical adherence to AWWA, NEMA, AWS, and ASTM standards. Payment is processed via Applications for Payment and becomes due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 12 hours ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS