Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Navy Pier Freedom Park Structural Pier Reinforcement

Closed
2024-24RState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541611
New
Business Impact Analysis, Disaster Recovery, and Business Continuity Plan Services (RFP-VC-26-006), Inland Empire Utilities Agency (California)
Solicitation # RFP-VC-26-006
Hagerty Consulting, Inc. is seeking a Disadvantaged Business Enterprise (DBE) subcontractor to support an engagement with the Inland Empire Utilities Agency (IEUA) in California. The project focuses on enhancing the agency's operational resilience framework through the development and review of a Business Impact Analysis (BIA), Disaster Recovery Plan (DRP), and Business Continuity Plan (BCP). Key responsibilities include identifying critical time-sensitive functions, quantifying disruption impacts, developing recovery playbooks, and facilitating in-person tabletop exercises to identify response gaps. Preferred expertise includes IT/OT resilience, critical infrastructure, and experience within the water or wastewater utility sectors. The contract is a service agreement with an initial three-year term and options for extension. All services must be performed by personnel located within the United States or its territories. Deliverables must align with FEMA Continuity Guidance Circular and Business Continuity Planning frameworks, as well as CISA and NIST standards for cybersecurity and risk assessment. The engagement is subject to California Public Records Act requirements and is designated as a Prevailing Wage Contract under the California Labor Code. Proposals are due by November 17, 2026, via the PlanetBids portal. Evaluation criteria emphasize a proven track record of completing at least two similar projects in the utility sector within the last five years, personnel qualifications such as CBCP certifications, and a detailed staffing methodology. Award selection will be based on the offeror's capability to complete the requirements in a cost-effective and time-efficient manner. Administrative requirements include active SAM.gov registration, UEI provision for subawards, and adherence to Build America, Buy America (BABA) standards.
Hagerty Consulting, Inc.

POSTED

about 1 hour ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The contract involves the comprehensive construction of Navy Pier Freedom Park in San Diego, California, requiring the contractor to provide all necessary labor, materials, equipment, transportation, and disposal services to complete the project as depicted in the specified drawings and specifications. The project was rebid after an initial bid was rejected due to being significantly above the engineer's estimate, with the current estimate set at approximately 1.345 billion dollars. The work is scheduled to be completed within 120 calendar days and includes tasks such as jet grouting along a 380-foot retaining wall, project management, and coordination with various stakeholders, including regulatory agencies, the district, tenants, and the public. The contractor must adhere to all applicable local, state, and federal regulations, including safety, pollution prevention, and in-water work permits, and is required to conduct a site inspection and review subsurface information before submitting a bid for jet grouting. The scope of work encompasses all items necessary to fulfill the contract requirements, even if not explicitly detailed in the bid documents, ensuring comprehensive completion of the project as per the contract documents.

Documents

1

Notice Inviting Bids for Spec 2024-24R Freedom Park Phase IIC

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Port of San Diego
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
In accordance with the Contract documents, the Contractor shall furnish all labor, materials, equipment, transportation, supplies, systems, and disposal as necessary to complete the construction of Navy Pier Freedom Park Construction, San Diego, CA, as shown in Drawing No. EM-2024-04R and as described in Specification No. 2024-24R of the San Diego Unified Port District.This bid Specification No. 2024-24R is a rebidding of Specification No. 2024-24 in which all bids were rejected by the BPC on June 6, 2025, after receiving only one bid of $2,740,403.00 due to the bid being significantly above the engineer's estimate and currently available funding from third-party-payor Midway.The engineer estimate for Specification No. 2024-24R remains $1,345,000,000,. The total contract duration is 120 calendar days.The Work shall include, but not limited to, the following.1. Jet grouting along approximately 380 linear feet of retaining wall within the limits as shown in the plans including related mobilization and demobilization.2. Project Management and Coordination including but not limited to On-Site Work Hours, Work Coordination and Notifications with the District, tenants, and the public.3. Coordination and compliance with applicable local, state, and federal regulatory requirements including but not limited to Vehicular and Pedestrian Safety, Construction Pollution Prevention Plan (Exhibit B, Coastal Development Permit, In-water work (Exhibit C, ACOE RGP 72), Construction Debris Removal and Disposal.4. Prior to submitting a bid price for Jet Grouting, the grouting Contractor shall conduct a site inspection and review available subsurface information (including geotechnical borings). Prior to bid, Contractor shall verify the suitability of his methods for the project based on the conditions indicated by the subsurface information provided.5. It is intended that the Work be completed in every respect under the Contract Document, and such items or details not mentioned above or not included in the Bid Schedule that are required by the Contract documents (as defined in Subsection 5.1.2.6 of the General Conditions) shall be furnished, performed, placed, constructed, or installed by the OWNLOAD SPEC FOR COMPLETE SCOPE OF SERVICE AND SPEC REQUIREMENTS

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS