Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Award Notice opportunity from Department Of Agriculture was posted on March 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Negrito Well Install

Awarded
127EAV26Q0026Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 1 day

AI Contract Overview

Show more

Solicitation 127EAV26Q0026 is a Firm-Fixed-Price contract issued by the USDA Region 3 Southwestern Regional Office for the installation of a new well at the Negrito Fire Base within the Gila National Forest in Reserve, New Mexico. The project involves drilling, casing installation, surface preparation, and the assembly of a functional water system to replace an irreparable existing well. The performance period is scheduled from March 2, 2026, to April 2, 2026. This opportunity is a total small business set-aside, specifically designated for Women-Owned Small Businesses (WOSB) under NAICS code 237110. Award is based on the Lowest Price Technically Acceptable (LPTA) methodology. Offerors must pass a binary Go/No-Go technical evaluation covering drilling approach, mobilization schedules, and personnel qualifications, followed by an assessment of past performance. The government will award the contract to the responsible offeror with the lowest total evaluated price. Performance is monitored via a Quality Assurance Surveillance Plan (QASP) that utilizes Acceptable Quality Levels (AQLs) and objective metrics to ensure compliance with New Mexico Environment Department (NMED) and federal regulations. The contract includes rigorous administrative requirements, including the necessity for bid guarantees and performance and payment bonds. Notably, it contains specific DEI and anti-discrimination compliance obligations under Clause 452.203-71, where non-compliance is treated as a material breach that may lead to termination for default or withholding of funds. Final acceptance of the work is conducted at the project site by the Contracting Officer and Representative following a final walkthrough to verify the system is substantially complete.

General Info

Contract Value

$228,160

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Reserve, NM, 87830, USA

Set-Aside

SBA

Award Issued Date

Potential End Date

June 19, 2026

Documents

2
PDF, High priority: read this first14 pages · qasp
High
PDF, High priority: read this first25 pages · rfq
High

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Region 3 Southwestern Regional Office
Contacts1 person available
OfficeALBUQUERQUE, NM, 87102, USA

Full Description

Show more

The contractor shall construct a new well at the Negrito Fire Base to replace the existing well system, which was deemed
irreparable due to a crushed drop pipe and fallen pitless adaptor. Work shall include but is not limited to: drilling, casing
installation, surface prep, and complete assembly of a functional water system according to NMED Standards. All work
must comply with applicable federal, state, and local regulations. The well should be as close as to the existing well as
possible/feasible and should be connected into the existing distribution system. Contractor is responsible for all labor,
tools, equipment, permitting, and materials. This solicitation replaces a prior solicitation that was canceled following award due to awardee withdrawlal.

More opportunities from Department Of Agriculture → Region 3 Southwestern Regional Office

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS