This Solicitation opportunity from Tennessee was posted on December 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Nestor Pavement Repair - Sinkhole
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the Nestor Sinkhole Repair project located at 130 Nestor Street, Tennessee. Its primary objective is to restore the structural integrity and operational reliability of a facility access area compromised by pavement and subgrade failure. The work entails phased sectional repairs to maintain operational continuity at the site. Scope includes mobilization, traffic control implementation, demolition and excavation of damaged rigid pavement and subgrade, installation of geogrid reinforcement and geotextile stabilization for subgrade strengthening, mineral aggregate base placement, and the construction of 9-inch Portland cement concrete pavement with dowels and welded wire mesh. Additional tasks cover drainage structure adjustments, erosion control, and application of pavement markings to ensure safety and durability. The phased construction allows continuous site access and minimizes disruption. The estimated cost, including a contingency allowance, is approximately $909,000, with the construction timeline set to complete within 60 calendar days from mobilization under a performance period of up to 180 days. The solicitation, issued by the Nashville Metropolitan Transit Authority (WeGo Transit), requires compliance with Federal Transit Administration (FTA) and Tennessee State contract clauses, encompassing the Davis-Bacon Act, Buy America provisions, equal employment opportunity, and environmental regulations. Bonding is mandatory with a 5% bid bond and 100% performance and payment bonds or an irrevocable standby letter of credit. The contract enforces strict administrative and legal compliance including nondiscrimination, conflict of interest, anti-lobbying certifications, debarment and suspension certifications, and public accountability standards. Contractor responsibilities include submittal of detailed safety, traffic control, and work plans prior to mobilization. Materials and workmanship must comply with relevant federal and state quality standards, including ADA accessibility and TDOT specifications. Payment requests are to be submitted electronically, and the agency retains inspection rights with acceptance contingent on adherence to contract stipulations. The procurement is open to all qualified contractors without set-aside restrictions, and submissions are accepted digitally via OpenGov by January 13, 2026. The project ensures continuous operations through phased construction and prioritizes quality, safety, and regulatory compliance throughout execution.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26_1130 – Martinsburg-PAOpen now, due in 7 days
- ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 40 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS