Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Tennessee was posted on December 4, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Nestor Pavement Repair - Sinkhole

Closed
2025216State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract pertains to the Nestor Sinkhole Repair project located at 130 Nestor Street, Tennessee. Its primary objective is to restore the structural integrity and operational reliability of a facility access area compromised by pavement and subgrade failure. The work entails phased sectional repairs to maintain operational continuity at the site. Scope includes mobilization, traffic control implementation, demolition and excavation of damaged rigid pavement and subgrade, installation of geogrid reinforcement and geotextile stabilization for subgrade strengthening, mineral aggregate base placement, and the construction of 9-inch Portland cement concrete pavement with dowels and welded wire mesh. Additional tasks cover drainage structure adjustments, erosion control, and application of pavement markings to ensure safety and durability. The phased construction allows continuous site access and minimizes disruption. The estimated cost, including a contingency allowance, is approximately $909,000, with the construction timeline set to complete within 60 calendar days from mobilization under a performance period of up to 180 days. The solicitation, issued by the Nashville Metropolitan Transit Authority (WeGo Transit), requires compliance with Federal Transit Administration (FTA) and Tennessee State contract clauses, encompassing the Davis-Bacon Act, Buy America provisions, equal employment opportunity, and environmental regulations. Bonding is mandatory with a 5% bid bond and 100% performance and payment bonds or an irrevocable standby letter of credit. The contract enforces strict administrative and legal compliance including nondiscrimination, conflict of interest, anti-lobbying certifications, debarment and suspension certifications, and public accountability standards. Contractor responsibilities include submittal of detailed safety, traffic control, and work plans prior to mobilization. Materials and workmanship must comply with relevant federal and state quality standards, including ADA accessibility and TDOT specifications. Payment requests are to be submitted electronically, and the agency retains inspection rights with acceptance contingent on adherence to contract stipulations. The procurement is open to all qualified contractors without set-aside restrictions, and submissions are accepted digitally via OpenGov by January 13, 2026. The project ensures continuous operations through phased construction and prioritizes quality, safety, and regulatory compliance throughout execution.

General Info

The Nestor Sinkhole Repair project at 130 Nestor Street is designed to restore structural integrity and operational reliability of the facility access area affected by pavement and subgrade failure. The work will be executed in phased sectional repairs to ensure that site operations remain active throughout construction. Scope of Work Mobilization & Traffic Control: Establish staging areas and implement traffic control measures to safely direct vehicle and equipment flow during sectional closures. Sectional Demolition & Excavation: Remove damaged rigid pavement and subgrade in controlled sections. Excavation will proceed in phases to limit disruption and maintain usable access routes. Subgrade Stabilization: Install geogrid reinforcement and geotextile stabilization within each section to strengthen the base and prevent recurrence of settlement. Aggregate & Base Placement: Place and compact mineral aggregate (Type A, Grading D gravel) as structural base material for each phased area. Concrete Pavement Installation: Construct 9" Portland cement concrete pavement with dowels, welded wire mesh, and Sikaflex grout as required. Concrete will be poured and cured by section, maintaining continuous access around work zones. Drainage & Utility Adjustments: Adjust manhole lids and related drainage structures as sectional pavement is restored, ensuring alignment and function. Erosion Control & Surface Treatments: Apply erosion control measures during excavation and backfill. Final work includes painted pavement markings, ensuring a safe and functional surface. Operational Considerations Phasing will allow one section to remain under repair while adjacent sections remain open for site operations. This approach minimizes downtime, maintains facility access, and ensures safe circulation for transit vehicles and personnel. Estimated Cost The preliminary construction estimate totals $909,000 , inclusive of materials, equipment, labor, and a 20% contingency for unforeseen conditions

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26_1130 – Martinsburg-PAOpen now, due in 7 days
  • ASO-0953-00 Construction of standalone DME at Paulding Northwest Atlanta Airport (PUJ), Dallas, GAOpen now, due in 40 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTennessee → Facilities Maintenance
Contacts2 people available
OfficeNashville, TN, 37155, USA

Full Description

Show more
The Nestor Sinkhole Repair project at 130 Nestor Street is designed to restore structural integrity and operational reliability of the facility access area affected by pavement and subgrade failure. The work will be executed in phased sectional repairs to ensure that site operations remain active throughout construction. Scope of Work Mobilization & Traffic Control: Establish staging areas and implement traffic control measures to safely direct vehicle and equipment flow during sectional closures. Sectional Demolition & Excavation: Remove damaged rigid pavement and subgrade in controlled sections. Excavation will proceed in phases to limit disruption and maintain usable access routes. Subgrade Stabilization: Install geogrid reinforcement and geotextile stabilization within each section to strengthen the base and prevent recurrence of settlement. Aggregate & Base Placement: Place and compact mineral aggregate (Type A, Grading D gravel) as structural base material for each phased area. Concrete Pavement Installation: Construct 9" Portland cement concrete pavement with dowels, welded wire mesh, and Sikaflex grout as required. Concrete will be poured and cured by section, maintaining continuous access around work zones. Drainage & Utility Adjustments: Adjust manhole lids and related drainage structures as sectional pavement is restored, ensuring alignment and function. Erosion Control & Surface Treatments: Apply erosion control measures during excavation and backfill. Final work includes painted pavement markings, ensuring a safe and functional surface. Operational Considerations Phasing will allow one section to remain under repair while adjacent sections remain open for site operations. This approach minimizes downtime, maintains facility access, and ensures safe circulation for transit vehicles and personnel. Estimated Cost The preliminary construction estimate totals $909,000 , inclusive of materials, equipment, labor, and a 20% contingency for unforeseen conditions

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS