Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on January 23, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Net Zero Buildings (MILCON)

Closed
NetZero_DIU(MILCON)_AFFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Hanscom AFB, MA, 01731, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense
Contacts1 person available
OfficeN/A
Organization / AgencyDepartment Of Defense
Office AddressN/A
Contacts
Carrie R. Williams

Full Description

Show more
Interested parties need to submit responses through the DIU website at https://www.diu.mil/work-with-us/open-solicitations under the Net Zero Building (MILCON) opportunity. This is an opportunity that will be utilize Other Transaction Authoirty. Vendors are reminded that in order to utilize an Other Transaction agreement, the requirements of 10 USC 4022 must be satisfied. Specifically reference 10 USC 4022(d), which requires significant contribution from a nontraditional defense contractor, all participants to be small business concerns, or at least one third of the total cost of the prototype project is to be paid out of funds provided by was sources other than the Federal Government. This special notice is specifically for the Air Force Requirement for a Net Zero Child Development Centers (CDCs) at Hanscom Air Force Base, Massachusetts. Buildings and their supporting systems (e.g.,lighting, HVAC, etc.) have a significant impact on energy use and the environment. Commercial and residential buildings use approximately 76% of all electricity and are responsible for 40% of greenhouse gas (GHG) emissions in the United States. Much like the private sector, the DoD's building stock is one of the single greatest drivers of energy and water demand. With more than 283,000 buildings located on 500 installations worldwide, Department of Defense (DoD) buildings account for nearly one quarter of total energy use in the federal government. The immense energy demand from DoD buildings creates an increased dependence on commercial grids. This energy dependence creates mission risks due to potential disruptions from extreme weather, grid issues, cybersecurity attacks and other unforeseen risks while simultaneously creating undue strain on the local energy serving critical infrastructure. This strain is magnified due to the age of DoD's existing building stock; the majority of which was built between 1940 and 1990. Problem Statement DoD seeks to prototype novel design, construction techniques, and materials in order to improve the energy and water efficiency for its new building construction. DIU is seeking new turnkey approaches for net zero design and construction of new buildings. A net zero building is one in which the total annual greenhouse gas emissions resulting from scope 1 and scope 2 sources, related to all aspects of building energy use, are reduced to zero. Building systems that reduce ongoing maintenance actions by DoD personnel are preferred. Solutions should be capable of being designed, reviewed, and approved within a 9 to 12-month timeframe. Desired Solution Features Solutions should be adaptable for diverse geographical locations, both domestic and international, and for one or more types of buildings, including: administrative, housing and community, barracks, supply, research, development and testing, maintenance and production, hospital and medical, and any other type of facility located at a DoD installation. Desired solution features of the design and construction include the following attributes and capabilities: Net Zero Buildings Energy efficiency designed to meet Energy Use Intensity (EUI) targets in ASHRAE 90.1- 2022. Design building to achieve at least 30% energy consumption reduction from ASHRAE 90.1-2022 baseline Full electrification of standard building operations including: domestic heating, production of hot water, laundry, cooking, and other equipment Passive design features such as: siting, orientation, passive solar design, passive day lighting, natural ventilation, and superinsulation of the building envelope Plans to utilize sustainable materials with a - low Global Warming Potential (GWP) construction materials as defined in Carbon Leadership Forum's 2021 Material Baselines report https://carbonleadershipforum.org/2021-material-baseline-report/ Plans to include advanced energy and water metering Interconnection, integration, compatibility, and the ability to communicate with the local installation's energy and water utility/energy management, monitoring and control systems Incorporate sustainable principles to include Life Cycle cost -effective solutions for energy, maintenance and operational elements Descriptions of past examples of successfully designing and constructing facilities with third-party Sustainability Certifications such as LEED, Green Globes, or other sustainable rating system, highlighting credits associated with Environmental Product Declarations Be cost effective in all phases (design, construction, integration, performance and servicing) Design Construction Process Improvements - Demonstrate use of technology/AI to provide a scalable, faster, and reliable aid to design efforts Front end loaded design collaborative process Vendors (Design/Build firms, Design/Build joint ventures) may submit proposals as part of a team. Building standards are established using the Whole Building Design Guide and Unified Facility Code. Vendors are welcome to propose methods to integrate and achieve the performance objectives while helping to ensure life/safety requirements. Expectations The successful vendor, vendors or team will work collaboratively with DoD personnel to meet the following expectations: Design, construct, and commission net zero buildings Develop detailed project requirements to meet objectives Submit detailed proposal(s) for completing the design and construction Develop and negotiate design and construction agreements Prepare relevant documents including design analyses, drawings, digital models, calculations, and specifications Achievement of Leadership in Energy and Environmental Design (LEED) Platinum, Green Globes 4, or other equivalent sustainable highest levels of third-party certifications, and preferably achieve all credits associated with Environmental Product Declaration Perform quality control and collaborate with DoD quality management personnel Functions of quality control will be the responsibility of the vendor. Functions of quality assurance will reside with the DoD Vendor(s) must have the ability to conduct the projects at DoD installations across the United States and Territories Desired solutions should demonstrate relevant and verified experience, as well as descriptions of past examples of designing and constructing buildings using appropriate integrated standards. Vendors may submit proposals as part of a team. Vendors or teams must have completed four projects within the past 10 years with each project value exceeding $30,000,000. Past projects must include achievement of energy efficiency designed to exceed Energy Use Intensity (EUI) targets in ASHRAE 90.1, plus at least 30% energy consumption reduction from baseline, where life-cycle is cost-effective. Past building projects must include achievement of sustainable third party certification that achieved preferably all the credits associated with the Environmental Product Declaration. The selected vendors/teams will initially demonstrate these approaches by designing, constructing, and commissioning a new building of approximately 40,000 square feet for Child Development Centers (CDCs) at Joint Expeditionary Base, Little Creek, Virginia AND/OR Hanscom Air Force Base, Massachusetts. Process Submissions will be evaluated in accordance CSO HQ0845-20-S-C001 available on https://SAM.gov and https://DIU.mil. Vendors selected for Phase 2 will receive an amplification letter with expanded details to help inform their Phase 2 pitches. Those vendors will be expected to provide their Rough Order of Magnitude (ROM) breakdown. The vendors Phase 2 pitch shall address the Phase 2 evaluation factors contained in CSO HQ0845-20-S-C001. DoD requires companies without a CAGE code to register in SAM https://SAM.gov if selected for agreement award. The Government recommends that prospective companies begin this process as early as possible. Eligibility Requirements This solicitation is open to U.S. and international vendors. Vendors are reminded that in order to utilize an Other Transaction agreement, the requirements of 10 USC 4022 must be satisfied. Specifically reference 10 USC 4022(d), which requires significant contribution from a nontraditional defense contractor, all participants to be small business concerns, or at least one third of the total cost of the prototype project is to be paid out of funds provided by was sources other than the Federal Government.

More opportunities from Department Of Defense

Same awarding agency

NAICS: 541330
New
Federal
Army Contracting Command – Red River Army Depot (ACC-RRAD) Organic Industrial Base (OIB) Modernization Commercial Solutions Opening (CSO)
Solicitation # W911RQ-27-S-C001
The Army Contracting Command – Red River Army Depot (ACC-RRAD) has issued Commercial Solutions Opening (CSO) W911RQ-27-S-C001 to modernize its Organic Industrial Base (OIB). This initiative focuses on Convergent Manufacturing, seeking innovative commercial items, technologies, and services in areas such as digital twins, automation, cyber security, and agile facilities to enhance the Defense Manufacturing Base. The CSO utilizes a streamlined acquisition process authorized by DFARS Subpart 212-70, allowing both traditional and non-traditional defense contractors to compete for FAR Part 12 commercial item contracts. The overall solicitation remains open until September 30, 2027, with a general period of performance for awarded solutions typically not exceeding 12 months. The procurement is executed through specific Areas of Interest (AoIs), which have included requirements for micro trucks, industrial parts washer leasing and maintenance, and fire suppression system repairs for Building 431. The evaluation process is conducted in three phases: an initial solution brief, a presentation or pitch, and a final Commercial Solutions Proposal. Technical evaluations prioritize responsiveness to the AoI, technical merit, and innovation, while price proposals must be determined as fair and reasonable. Awardees must be registered in the System for Award Management (SAM) and possess a Unique Entity ID. Specific project requirements may include strict adherence to military marking standards, environmental liability insurance, and certification by registered professional engineers.
Engineering Services

POSTED

1 day ago

DEADLINE

in 12 months
View Details
NAICS: 541330
New
Federal
AIR FORCE CRYPTOLOGIC OFFICE COMMERCIAL SOLUTIONS OPENING
Solicitation # FA7037-21-S-C001
The Air Force Cryptologic Office Cyberspace Intelligence Surveillance and Reconnaissance and Multi-Domain Innovation Division is soliciting innovative commercial capabilities through Commercial Solutions Opening FA7037-21-S-C001. The agency is seeking mature technologies and services in Electromagnetic Warfare, Information Operations, and electromagnetic digital communications, with a specific goal of achieving a field demonstration within one year. This effort emphasizes the use of novel material approaches and innovative services, including a recent update to incorporate Super Intelligence. Awards may be issued as contracts or Other Transactions with periods of performance typically ranging from one to five years. The procurement follows a competitive two-phase submission process governed by 10 USC 3458 and DFARS 212.70. Phase I requires the submission of Quad Charts and White Papers, which are evaluated based on technical merit, importance to the AFCO mission, and fund availability. Offerors who are determined to be technically qualified may be invited to submit full Phase II proposals, including a detailed Statement of Work and a price proposal. All submissions are treated as commercial items, and offerors must possess the necessary personnel and facility security clearances to handle classified work in accordance with the National Industrial Security Program Operating Manual.
Engineering Services

POSTED

5 days ago

DEADLINE

in 11 months
View Details
NAICS: 236220
New
Federal
EIE485 Consolidated Munitions on Quarry Hill, Eielson AFB, AK
Solicitation # W911KB27RWP04
The U.S. Army Corps of Engineers, Alaska District, is conducting market research for project EIE485, which involves the consolidation of munitions storage functions at Eielson Air Force Base, Alaska. The project scope includes the design and construction of new munitions storage facilities at Quarry Hill, including a warm storage vehicle facility, and the demolition and debris removal of 12 existing facilities at Engineer Hill. All designs must strictly adhere to Air Force Standard Designs, specifically Defense Explosives Safety Regulation 6055.09 and Air Force Manual AFMAN 91-01 Explosives Safety Standards. The target budget for this effort is approximately 196.4 million dollars. The anticipated period of performance spans from fiscal year 2027 to 2031, with design work beginning in FY27 and construction starting no earlier than FY29. The government is currently evaluating the most effective project delivery method and contracting vehicle, considering options such as Accelerated Design-Build to Budget via a FAR-based approach or Other Transaction Authority vehicles like Construction Manager at Risk or Progressive Design-Build. Key project challenges identified for industry feedback include site constraints such as permafrost and PFAS. The government is seeking input from a wide range of socioeconomic business categories to determine the optimal acquisition strategy and evaluation criteria, focusing on technical approach, past performance, and team integration.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS