The City of Naperville is undertaking a project to upgrade its water department's network infrastructure by replacing existing switches with Aruba network switches, following a recent upgrade of the electric utility's substations from the Hirschmann to Aruba networks. The new switches are designed to withstand harsh environmental conditions, featuring conformal coating to protect against moisture and conforming to the IEEE 1613 standard, ensuring durability in water department locations. This upgrade aims to maintain the full operation of the Water Department's SCADA system while enhancing its capacity to handle additional network traffic. Procurement will be conducted through the approved Sourcewell Cooperative Contract 081419-CDW via CDW-G, with the switches scheduled for delivery by September 30, 2024, and installation expected to be completed by March 31, 2025. The project has a contract value estimated between $500,000 and $1,500,000, emphasizing the importance of reliable, environmentally resilient network equipment to support critical water infrastructure.
General Info
Agency
Place of Performance
IL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The new Aruba switches have conformal coating which protects them from moisture and dampness which is a critical component to protecting the equipment. The new switches also conform to the IEEE 1613 standard to withstand the environmental constraints of the Water Department locations.
The upgraded network will keep the Water Department SCADA system in full operation, while gaining the ability to add additional traffic.
Staff has identified an approved cooperative contract, Sourcewell Cooperative Contract 081419-CDW through CDW-G, for the procurement of the Aruba network switches. The network switches are expected to be delivered by September 30, 2024. Installation by Electric Utility staff is scheduled to be completed by March 31, 2025.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS