Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

New Boardwalk Installation (1,100 Linear Feet)

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Agriculture → Tahoe National ForestView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Sierra City, CA, USA

Set-Aside

SBA

Documents

This scope was carved out of 127EAX26Q0070.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

GAOA Sand Pond Trail Boardwalk Replacement Tahoe NF

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Tahoe National Forest
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Agriculture → Tahoe National Forest
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Fabricate and install 1,100 linear feet of durable boardwalk using composite or treated timber on a supported foundation system in a forested trail setting.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter, as well as structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and electrical work. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a bid deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) administered by the EPA, making it subject to the American Iron and Steel (AIS) Provisions, Davis-Bacon Related Acts, and DBE Program requirements. Qualified bidders must possess a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100 percent of their contract value, with Kiewit agreeing to reimburse bond premiums. The solicitation specifically encourages quotes from certified Disadvantaged Business Enterprises (DBE), including MBE, WBE, and SBE firms, and emphasizes the importance of maintaining labor harmony on the project.
Kiewit Infrastructure West Co.

POSTED

about 20 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Agriculture → Tahoe National Forest

Same awarding agency

NAICS: 237990
Federal
GAOA Sand Pond Trail Boardwalk Replacement Tahoe NF
Solicitation # 127EAX26Q0070
The Tahoe National Forest, under the Department of Agriculture, has issued solicitation 127EAX26Q0070 as a Request for Quotation for the Sand Pond Trail Boardwalk Replacement project in Sierra City, California. This is a total small business set-aside acquisition for commercial items, categorized under NAICS code 237990, with an estimated project magnitude between $500,000 and $1,000,000. The scope of work involves the removal of an existing bridge, 200 lineal feet of existing boardwalk, and two lumber debris piles, followed by the installation of 1,100 lineal feet of new boardwalk, one new bridge, and the delivery and stockpiling of 20 cubic yards of crushed aggregate surface course. The period of performance is scheduled from October 1, 2026, to December 1, 2026. Award will be made to the offeror representing the best value to the Government, based on a technical rating and a price evaluation to ensure fairness and reasonableness. Offerors must provide pricing for all individual line items in the provided Schedule of Items to avoid exclusion. The contract includes several critical requirements, such as compliance with the Davis-Bacon Act, provision of paid sick leave per Executive Order 13706, and the submission of a project safety plan. Contractors are responsible for maintaining public site safety, ensuring proper material preservation, and adhering to strict environmental precautions during wood treatment to prevent contamination. Additionally, the contract requires a bid guarantee and incorporates performance and payment bonds, as well as specific insurance requirements for work on government installations.
Other Heavy and Civil Engineering Construction

POSTED

13 days ago

DEADLINE

in 16 days
View Details