Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

New CS Fiber Optics Infrastructure Rehoming Project-156th WG PR ANG

Awarded
W50S9326QA011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 156th Wing at Muñiz Air National Guard Base in Carolina, Puerto Rico is soliciting bids for a firm fixed-price contract to relocate and install new fiber optic infrastructure across multiple buildings on the base. The project involves installing 12-strand and 72-strand single-mode fiber optic cables between key facilities, terminating all strands with APC LC connectors, testing each fiber for insertion loss and OTDR trace results, and delivering comprehensive as-built documentation. All work must comply with TIA-606-D labeling standards and TIA/EIA installation guidelines. The contract has a strict 60-day performance period beginning upon award, and the Government’s target price range is between $250,000 and $500,000. This is a 100% Small Business Set-Aside under NAICS code 237130 with a size standard of $19 million. The contractor must provide all labor, materials, equipment, supervision, and quality control except for government-furnished items specified in the Statement of Work. All offerors must be registered in SAM.gov and submit a completed SF-1449 with pricing for CLIN 0001, a detailed list of required equipment and labor disciplines, and a realistic project schedule. Proposals are due by August 17, 2026 at 10:00 AM EST and must be emailed to angel.solis.2@us.af.mil with a specific subject line format. Site visits were held on August 3, 2026, and required prior registration with government-issued ID, vehicle registration, and proof of insurance. Security at the installation is highly restricted: firearms are prohibited, and all personnel must pass background checks and complete mandatory antiterrorism and OPSEC training within 10 days of contract start. Far clauses 52.212-1, 52.212-2, and 52.222-55 apply, and the Wage Determination must be adhered to despite the rescission of Executive Order 14026, as the FAR clause remains in effect. The award will be made to the most advantageous offeror based on price and technical merit without discussions, and past performance may serve as a disqualifying factor. Payment will be processed electronically through WAWF using the Invoice as 2-in-1 (Services Only) format, and all

General Info

Firm fixed-price contract for fiber optic installation at Muniz ANGB under small business set-aside, 60-day deadline, $250K–$500K.

Agency

Department Of Defense → W7PA Uspfo Activity Prang 156View Agency

Contract Value

$195,000

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Carolina, PR, 00979, USA

Set-Aside

SBA

Awardee

B & B COMMUNICATIONS GROUP INCView Profile

Award Issued Date

Documents

(8)

156 WG Fiber Optic Infrastructure Installation SOW Rev1.3

PDFsow

Responses to Questions - W50S9326QA011

PDFq-and-a

Solicitation Amendment W50S9326QA0110001 - CS Bldg. Fiber Infrastructure Rehoming Project

PDFamendment

Facilities Pictures

PDFother

156th WG Muniz ANGB Building Map

PDFother

Wage Determination 2015-5707 Revision 29 for Puerto Rico

PDFwage-determination

Pre-Bid Site Visit Attendance - Fiber Optic Re-Homing

PDFpresolicitation

156 WG Fiber Optic Infrastructure Installation SOW Rev1.2

PDFsow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseAwarded
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7PA Uspfo Activity Prang 156
Contacts2 people available
OfficeCAROLINA, PR, 00979-1514, USA
Organization / Agency
Department Of Defense → W7PA Uspfo Activity Prang 156
View Agency Profile
Office AddressCAROLINA, PR, 00979-1514, USA
Contacts
Angel F. Solis/Contract Specialist

Full Description

Show more
https://api.sam.gov/prod/opportunities/v1/noticedesc?noticeid=e9849354d3014ba7888b6f4679201f70

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cable and associated connectors connecting Buildings 2, 3, and 4. The contractor must provide all labor, materials, equipment, and supervision to install outdoor-rated fiber along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. All work must adhere to industry standards, manufacturer specifications, and local codes, with a mandatory focus on OSHA safety standards and site security. Bids are due by September 30, 2026, and must include a completed Mandatory Bid Document with a clear bid price and authorized signature. The selection process is open to various small business set-asides, including SDB, WOSB, HUBZone, and SDVOSB. The contractor is required to hold a valid state General Contracting license and maintain all necessary Builder’s Risk and Liability insurance. Project completion is contingent upon successful Optical Loss Testing, OTDR testing, and polarity verification, followed by the submission of a full closeout package. Payment will be issued as a single lump sum upon completion, provided all required purchasing documentation is submitted. Normal work hours are Monday through Friday, 8:00 AM to 3:00 PM.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 5 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237130
New
SLED
2026 Digital Enterprise Network Expansion - Phase 2
Solicitation # 0510-047-2026
The City of West Des Moines is soliciting bids for the 2026 Digital Enterprise Network Expansion project, identified as project number 0510-017-2026. This public improvement project involves the installation of a multi-user fiber optic conduit network within the public right-of-way to enable fiber optic connectivity for every residence and business in the city. The selected contractor will be responsible for providing all labor, equipment, and materials, including the installation of vaults, conduit, tracer wire, and test stations. Electronic bids must be submitted via wdm.ionwave.net by 2:00 p.m. on September 23, 2026, and must be accompanied by a bid bond or certified check equal to ten percent of the total bid amount. The City Council will hold a public hearing and potentially take action on the proposals on October 5, 2026. The successful bidder must provide a performance and payment bond for one hundred percent of the contract price, as well as a maintenance guarantee for eighteen months following acceptance. Work must commence within ten days of the notice to proceed and be completed by January 29, 2027, with liquidated damages of five hundred dollars per day assessed for delays. Payment will be made based on monthly estimates at ninety-seven percent of the contract value for completed work. Preference is given to Iowa-based products and labor in accordance with state statutes, and bidders must submit a completed Bidder Status Form to be considered responsive.
City Of West Des Moines

POSTED

about 20 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237130
New
Federal
Building refurbishment in Hutchinson, KS at the HTI ARSR
Solicitation # 6973GH-26-R-00147
The Federal Aviation Administration (FAA) is soliciting proposals for the refurbishment of the ARSR building at the HTI facility in Hutchinson, Kansas. This small business set-aside project, identified as solicitation 6973GH-26-R-00147, is estimated to be valued between $500,000 and $1,000,000. The scope of work includes electrical upgrades, such as replacing a 600A MDPE1 panel with an 800A panel, selective demolition of unused vents, windows, and ladders, the installation of a new chain link perimeter fence, and the abatement and disposal of asbestos-containing materials and lead. The project specifically excludes any roofing work. The contract will be awarded as a firm-fixed-price agreement based on the Lowest Priced Technically Acceptable offer. Technical proposals must include a narrative and a detailed work plan, along with at least two references from projects valued over $100,000 completed within the last five years. Performance must begin within 15 calendar days of the notice to proceed and be completed within 45 calendar days, with a requirement that work be substantially complete within 30 days. Offerors must be registered in the System for Award Management (SAM) and adhere to Davis-Bacon wage determinations and FAA Acquisition Management System (AMS) provisions. Proposals are due by September 14, 2026, at 5:00 p.m. CT.
6973GH Franchise Acquisition Svcs

POSTED

about 21 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237130
New
Federal
Philippines TS - Antenna Maintenance Support
Solicitation # 951700-26-Q-0019
Solicitation 951700-26-Q-0019 is a combined synopsis and request for quotes for a firm-fixed-price, six-month contract to provide antenna maintenance support for the U.S. Agency for Global Media (USAGM) at its station in Concepcion, Tarlac, Philippines. The scope of work involves the preventive and corrective maintenance of 134 towers, 39 curtain antennas, 27.5 miles of transmission line, and various dish and rhombic antenna systems. Key requirements include providing at least three personnel qualified to climb towers up to 500 feet, with specific certifications required for rope rescue operations. The contractor is responsible for daily, weekly, quarterly, and semi-annual maintenance tasks, submitting weekly reports to the Contracting Officer's Representative, and repainting identification markings on RF box modules and antenna designations. The government will utilize the Lowest Priced Technically Acceptable (LPTA) procedure for award, evaluating quotes based on technical acceptability against the Statement of Work and the lowest overall price. The estimated period of performance runs from September 29, 2026, to March 28, 2027. Under Amendment A00001, the deadline for quote submission has been extended to September 15, 2026, at 0800 AM EST. Interested offerors must be registered and active in the System for Award Management (SAM) and submit their quotes via email to the designated contracting personnel, including a signed copy of the amendment and completed SF 1449 blocks.
Office Of Contracts

POSTED

about 21 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237130
New
Federal
CJAG Power Distribution
Solicitation # W9136426P0000040397
Solicitation W91364-26-P-0000-040397 is a 100% small business set-aside for a firm-fixed-price purchase order to construct the CJAG Load Line 6 Electrical System at Camp James A. Garfield Joint Training Center in Ravenna, Ohio. The project requires the installation of approximately 1,400 linear feet of underground medium-voltage electrical service, connecting a 4.16kv overhead power line to a new pad-mounted transformer. The system must provide 750kw of steady power with a peak surge capacity of 2,000 kV. The scope of work includes route surveying, trenching, conduit installation with concrete encasement, cable pulling, grounding, and comprehensive testing, including Megger and VLF Hi-pot testing. All work must comply with NEC Article 300 and other applicable electrical standards. The contract requires the awardee to provide all necessary personnel, equipment, and quality control, with a final Quality Control Plan due within 10 days of award. Performance is scheduled to begin 10 calendar days after receipt of order and must be completed by December 1, 2026. An offer guarantee is required, and performance and payment bonds must be furnished within 10 calendar days after receipt of order. Award will be based on the best value, evaluating technical acceptability, relevant past performance in medium-voltage electrical systems, and price reasonableness. Quoters must submit a detailed technical approach, a project schedule, and documentation of all required licenses and certifications to the contracting officer, Barry B. Beale.
W7NU Uspfo Activity Oh Arng

POSTED

about 21 hours ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS