Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on January 8, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

New Cumberland Mooring Post System

Closed
W911WN-16-T-3005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

332510 - Hardware Manufacturing

Place of Performance

Cumberland Lock and Dam 29501 State Route 7, STRATTON, OH, 43961-0159, USA

Set-Aside

NONE

Documents

1
DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Combined Synopsis

Type Changed

Combined Synopsis → Presolicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
Contacts1 person available
OfficePITTSBURGH, PA, 15222-4198, USA
Office AddressPITTSBURGH, PA, 15222-4198, USA
Contacts
Matthew W. ReedContract Specialist

Full Description

Show more
1.0 GENERAL REQUIREMENTS. Furnish two (2) heavy duty mooring post system same or equal to Tide Slide Mega Yacht 17-4 Class with the following salient characteristics: - Solid 3 inch diameter 316L Stainless Steel 35 feet long shaft - Includes all stainless steel hardware for mounting to steel wide flange beams - Constructed from 316L solid stainless steel and heat treated - Poly-oxidized UHMW, slides - Designed for a minimum vessel load rating of 50,000 pounds 2.0 TECHNICAL QUESTIONS. Technical questions may be directed to Mr. Willie Maynard at telephone +1 (555) 000-0000 or Mr. Jason Prince at telephone +1 (555) 000-0000 during normal business hours. 3.0 WARRANTY. The mooring post system shall have a standard manufacturer's one year warranty. 4.0 DELIVERY. The mooring post system shall be crated, boxed, or otherwise packaged to the extent necessary to prevent damage during shipment. Any damage caused during shipment shall be repaired/replaced by the vendor at his/her own expense. 4.1 Time of Delivery. The Government requires delivery of the mooring post system within 60 days after the date of receipt of a written notice of contract award. 4.2 Place of Delivery. The mooring post system supplied under this contract shall be delivered F.O.B. destination, transportation charges prepaid, to: New Cumberland Lock and Dam 29501 State Route 7 Stratton, OH 43961-0159 ATTN: Mr. Willie Maynard Telephone +1 (555) 000-0000 Shipments are received between 8:00 a.m. and 3:30 p.m., Monday through Friday, Federal Holidays excluded. The vendor shall notify New Cumberland Lock and Dam at least 48 hours prior to the delivery.

More opportunities from Department Of Defense → W072 Endist Pittsburgh

Same awarding agency

NAICS: 237990
New
Federal
JP Murtha Float Mooring Bitts Retrofit
Solicitation # W911WN27BA001
The United States Army Corps of Engineers Pittsburgh District is soliciting a firm-fixed-price construction contract for the John P. Murtha Floating Mooring Bitts Retrofit at the John P. Murtha Locks and Dam in Westmoreland County, Pennsylvania. The project requires the installation of government-furnished floating mooring bitts into contractor-fabricated embedded frames on the existing river chamber middle wall. This complex in-the-wet construction effort involves engineering design, the fabrication and installation of two structural steel dewatering boxes with a maximum 90-day duration, heavy concrete demolition using wire-sawing and core drilling, and the integration of cast-in-place concrete. The contractor must provide a fully compliant floating plant, including a crane, deck barge, and push boat, as well as certified commercial dive teams for underwater rigging, inspection, and cofferdam sealing. The work must be completed within 730 calendar days after the notice to proceed. This is an unrestricted full and open competition under NAICS code 237990, with a 10 percent price evaluation preference for HUBZone firms. Award will be granted to the lowest responsive and responsible offeror. Bidders must be registered in the System for Award Management and the Procurement Integrated Enterprise Environment solicitation module. Key requirements include compliance with EM 385-1-1 safety standards, Davis-Bacon Act wage determinations, and the provision of 100 percent performance and payment bonds. Progress payments will be made monthly via the CMP database based on approved estimates of work accomplished.
Other Heavy and Civil Engineering Construction

POSTED

3 days ago

DEADLINE

in 8 days
View Details
NAICS: 238210
Federal
RFI - Survey for Advance Contract Initiative Temporary Emergency Power
Solicitation # ACI-TEP-Survey
The Department of Defense, through the USACE Pittsburgh District, is conducting a sources-sought fact-finding exercise for an Advance Contract Initiative regarding Temporary Emergency Power. This initiative aims to establish a contract prior to federal declared emergencies to ensure rapid response capabilities across the United States and its territories. The current objective is to gather industry feedback on logistics, mobilization sequencing, subcontractor relationships, and cost drivers to inform future scope considerations and efficiency improvements. The scope of work involves providing all labor, equipment, and materials to support temporary emergency power activities through three phases: Mission Readiness, Mission Mobilization, and Mission Execution. Key responsibilities include conducting pre-installation inspections to determine generator sizing and connection methods, managing equipment at staging areas, and executing the installation of generators and external fuel tanks. Contractors must adhere to specific FEMA Bill of Materials standards and maintain 24-hour response operations. Operational requirements include the potential deployment of a five-person Advanced Echelon team and the appointment of a Site Safety and Health Officer. Performance is measured by the accuracy of installation assessments and the ability to mobilize assets to staging areas in a fully operational status. The process is governed by strict reporting timelines, including a 30-minute voice communication response standard and a 60-minute notification window for mishaps or incidents.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

10 days ago

DEADLINE

in 26 days
View Details
NAICS: 237990
Federal
Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation
Solicitation # W911WN27QA005
The U.S. Army Corps of Engineers, Pittsburgh District, is soliciting a Firm-Fixed-Price purchase order for the rehabilitation of the Canonsburg-Houston Local Protection Project in Strabane, Washington County, Pennsylvania. This total small business set-aside project, under NAICS 237990, focuses on restoring federal project integrity and design conveyance capacity along Chartiers Creek following severe storm damage. The scope of work includes vegetation clearing, the installation of erosion and sediment controls, the creation of temporary water diversions, and the removal and replacement of damaged geotextile fabric and riprap. The anticipated construction cost is between $150,000.00 and $350,000.00, with an expected award date of December 11, 2026. The project must be completed within 365 calendar days after the written Notice to Proceed, with a performance start window of 10 days. Work is restricted to weekdays from 7:30 AM to 4:00 PM. The government will award the contract based on best value, evaluating quotes on price and past performance. Key requirements include the provision of a Project Superintendent, a CQMC-certified Quality Control System Manager, and a dedicated Site Safety and Health Officer. Compliance with USACE EM 385-1-1 (2024) and the Davis-Bacon Act is mandatory. Performance and payment bonds are required at 100 percent of the original contract price, and liquidated damages for delays are set at $566.00 per calendar day.
Other Heavy and Civil Engineering Construction

POSTED

14 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS