New Installation of Strong Motion Instrumentation Station
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California Conservation, Department of
NAICS
N/A
Place of Performance
Skyline Blvd, Woodside, CA, 94062Set-Aside
NONE
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyCalifornia Conservation, Department of
Contacts4 people available
OfficeN/A
Organization / Agency
California Conservation, Department of
Office AddressN/A
Contacts
Full Description
Show more
The state-of-the art strong motion recording and telemetry equipment proposed for installation at this station will contribute seismic data critical for understanding earthquakes and for emergency planning, potentially saving thousands of lives and millions of dollars in infrastructure damage during a large earthquake.
The current property owner, the San Francisco Public Utilities Commission, has worked with the California Geological Survey (CGS) to find a suitable location in an open area with full sun exposure, near the Lat/Lon location noted above. CGS plans to install a small seismic monitoring station by pouring a small concrete pad measuring 4 inches thick by 40 inches long by 40 inches wide that includes three 18-inch post hole pillars. The pillars allow the pad/instrument to move with the soil rather than slide across the ground surface during an earthquake. A seismic instrument (tri-axial accelerometer) with a 36-inch-tall fiberglass (t-hut) or 46-inch-tall stainless steel (Caltrans) protective enclosure will be secured to the concrete pad. Solar panels will be affixed to the top of the fiberglass enclosure. All excavation will be dug by hand or mini-excavator, depending on site accessibility. There are no hazardous substances involved during construction nor as components. If necessary, a small generator will be used to power a hand-loaded concrete mixer and any other tools needed for construction. Construction/installation takes about 3 days.
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
