This Solicitation opportunity from Texas was posted on September 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
New Water for South Texas Conveyance Design Services Request for Qualifications
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Nueces River Authority, established by the Texas legislature in 1935, is dedicated to safeguarding and developing water resources within the Nueces River basin, with a recent emphasis on sustainable water supply solutions such as seawater desalination. Facing critical drought conditions and declining reservoir levels below 13%, the Authority is actively pursuing regional projects to address future water needs, including the New Water for South Texas Project, which aims to serve the entire basin and beyond. This initiative is designed to leverage economies of scale to reduce costs and improve operational efficiency, aligning with state strategies for water security through large-scale infrastructure development. In line with these efforts, the Authority has authorized negotiations for property rights and permits to establish a seawater desalination facility on Harbor Island, with a lease secured and permits nearing finalization. To support the conveyance infrastructure for this project, the Authority is soliciting Statements of Qualifications from engineering firms capable of providing program management and pipeline design services. The scope includes selecting a single firm for program management, covering one pipeline or pump station design segment, and up to four firms for pipeline segment design, emphasizing expertise in SCADA systems and specifications. The project, with a budget ranging from five to twenty million dollars, reflects the Authority’s strategic focus on developing resilient water infrastructure to meet the growing demands of the region.
General Info
Place of Performance
TX, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Water Retail ServicesOpen now
- Sector NOLA Water Treatment for HVACOpen now, due in 8 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
“Utilizing our statutory charge to provide trusted services to meet the needs of the people and environment; ensuring that future citizens will have adequate supplies of clean water where both people and wildlife can live, prosper, and enjoy the natural beauty and biologically rich environment of the Nueces River basin.” The Authority is focused on fulfilling its role of water supply development with its current attention on seawater desalination. The impacts of prolonged drought have exposed the critical need for new sustainable water supplies. The combined capacity of the lakes in the Nueces basin is currently at less than 13%. These low levels, combined with the water supply deficits projected in the State Water Plan for 2030 and 2070, require leadership and action compatible with the strategies adopted by the state legislature. At their meeting on November 15, 2024, the Board of Directors authorized its executive director to begin formal negotiations on property rights and permits needed to design, construct, and operate a seawater desalination facility on Harbor Island. The Authority now has a lease for the property, and permits needed for the treatment plant will soon be in draft form. The New Water for South Texas Project is proposed as a regional project intended to serve the entire 17,500 square mile Nueces River Basin and beyond as needed. The State of Texas renewed interest in larger regional projects serving multiple areas offers the benefits of lower cost due to economies of scale and as well as overall lower operating cost.
CONVEYANCE PROJECT SCOPE: The Authority seeks Statements of Qualifications (“SOQ”) from Firms that can adequately demonstrate they have the resources, experience, and qualifications to provide the Authority with quality Engineering Services for the Conveyance System of the New Water For Texas Project. This Request for Qualifications is being issued for the following services:
– Program Manager Services (includes one (1) Pipeline or Pump Station Design Segment) – 1 Firm – Pipeline Segment Design Services – up to 4 Firms for pipeline design with SCADA and specification experience.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
